<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_army/posts/116727078866084212" -->

---
title: W58RGZ26B0013 Step 1 Solicitation for Overhaul of the… | Closed - MatchAwards
description: W58RGZ26B0013 Step 1 Solicitation for Overhaul of the Searchlight for the UH60 Blackhawk. United States Department of the Army. Solicitation W58RGZ26B0013Step1. NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing. Deadline 2026-07-09. SOLCITATION STEP 1 FAR...
canonical: https://matchawards.com/dept_of_the_army/posts/116727078866084212
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: W58RGZ26B0013 Step 1 Solicitation for Overhaul of the… | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/116727078866084212
og:description: W58RGZ26B0013 Step 1 Solicitation for Overhaul of the Searchlight for the UH60 Blackhawk. United States Department of the Army. Solicitation W58RGZ26B0013Step1. NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing. Deadline 2026-07-09. SOLCITATION STEP 1 FAR...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# W58RGZ26B0013 Step 1 Solicitation for Overhaul of the Searchlight for the UH60 Blackhawk

Status

Closed, the response deadline passed on Jul 9, 2026

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

REDSTONE ARSENAL, USA

Notice type

Presolicitation

Solicitation number

W58RGZ26B0013Step1

NAICS

[335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing](/groups/542)

PSC

6230 - ELECTRIC PORTABLE AND HAND LIGHTING EQUIPMENT

Category

[Facility Related Materials (4.3)](/categories/facilities-and-construction/facility-related-materials)

Posted

2026-06-10

Deadline

2026-07-09

Place of performance

UNITED STATES

## Description

SOLCITATION STEP 1 FAR PART 14 TWO STEP SEALED BIDDING

**DATE: 10 Jun** 2026

Product or Service Code: 6230

Contracting Office Address:

U.S. Army Aviation and Missile Command (W58RGZ) ATTN: CCAM-AVA-B, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US)

**SUBJECT: Overhaul of the** Searchlight for the (UH-60) Blackhawk

**SOLICITATION NUMBER:** W58RGZ-26-B-0013

**RESPONSE DATE:** 9 July 2026

**Contracting Officer:**Edward A. Peterson, email:edward.a.peterson4.civ@army.mil

 Set-Aside Status: NA

**DESCRIPTION:** The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets:

<!-- mobian-agent-ad sponsored="true" id="7aaa06f9-e7e2-4a2f-b4e2-1cd28c70442e" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-materials?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


INPUT **NSN** **:** 6230-01-653-9052 INPUT **P/N** **:** 727-1198/02

OUTPUT **NSN** **:** 6230-01-653-9052 OUTPUT P/N: 727-1198/02

ESTIMATED QUANTITY RANGE: Minimum 24 each - Maximum 86 each

(Maximum includes a Foreign Military Sales (FMS) Quantity of 14 each)

The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement.

1\. The U.S. Army Contracting Command - Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the Searchlight. All work shall be completed in accordance with the Statement of Work. The Government does not have a Depot Maintenance Work Requirement for this effort (DMWR).

The IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without  
requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. Technical proposals (Step-One) shall not include prices or pricing information.This notice begins the technical proposal (Step-One) submission period which ends 9 July 2026.

2\. If a bidder is approved to move to step 2, bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 60 days after receipt of bids. Only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be  
considered for awards, and each bid in the second step must be based on the bidder’s own technical proposals.

Technical acceptability for step-one will be determined by the bidder’s response  
to the following questions:

1. Has your company ever conducted a repair/overhaul or manufacture of the SEARCHLIGHT for the UH-60? If not, has your company performed repairs on the same, or like item in the past?
2. If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number?
3. Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information.
4. Please provide contact information for the Defense contract management Agency (DCMA) that serves as your administrative contracting officer.
5. Describe the following in the amount of detail necessary. If any portion of the overhaul program is outsourced, then the following requirements of line items E – K) must be imposed on the outsourced vendor(s).

Does your company have overhaul and replacement capability? Does your company have a documented quality plan/process?

Please provide the following details regarding your company's quality plan.

* * Calibration program
  * Continues improvement/self-audits program
  * Non-conformance parts & quality escapes
  * Parts obsolescence
  * Periodic training/certification/recertification program
  * Certification/release of test stand/equipment for production
  * Traceability of repair & maintenance performed, records keeping program

What are the required minimal qualification and specialized skills of an electronic technician?

Describe experience in depinning and pinning electrical connectors. Describe experience in replacing crimp type pins.

Describe experience in circuit-board level repair, desolder and solder of electrical components.

Describe experience in repairing and replacing electrical wires.

Do you have electrical static discharge (ESD) prevention program/capability? Do you have paint removal capabilities?

Do you have corrosion repair/prevention/application capability? Do you have painting and minor touch-up capability?

Do you have repair capability for minor surface defects such as nicks, scratches on housing/enclosure?

Do you have facilities, special tools and equipment as follows:

Overhaul facility equipped with environmental controls of temperature, humidity, and adequate ventilation to vent hazardous fumes?

Equipment, documentation, and procedure to fully support an IUID (Item Unique Identifier) program?

Adequate workbench with ESD control and access to standard shop tools? Availability of electronic test equipment necessary for electrical circuit troubleshooting and performing milliohm electrical bond tests?

If applicable, the required equipment to install, verify, and update application software/firmware?

Original Equipment Manufacturer (OEM) test stand/equipment, or certified equivalent for Acceptance Test Procedure (ATP)?

\*NOTE\* For certified equivalent, be prepared to provide procedure and data establishing equivalency.

Do you have an overhaul plan for the subject or like item?

If yes, are you willing to submit a copy for evaluation? The plan must contain instructions, procedures covering the following major categories, and sample run sheet(s), at a minimum:

* * Receiving inspection instructions.
  * Pre-test/Pre-shop analysis instructions.
  * Disassembly instructions.
  * Cleaning instructions.
  * Overhaul Inspection Requirements (OIP).
  * Repair and replacement instructions.
  * Assembly instructions.
  * Final Test instructions.
  * Primer, paint, coating, and or corrosion protection instructions
  * Packaging, marking and shipping instructions.

Can your company acquire all necessary parts, tooling and materials to complete an overhaul?

If you have worked with Sirio Panel, Cage 7AW54 for the subject item, or one of its approved suppliers, provide a copy of a completed, showing item receipt, purchase order for the Original Equipment Manufacturer (OEM), or approved supplier, parts, or materials.

Do you have access to or possess OEM technical data and engineering drawings of this item, including electrical/wiring schematics, Acceptance Test Procedure (ATP), Maintenance and Overhaul Instructions, or Commercial Maintenance Manual (CMM)? Is it complete or partial? This requirement is necessary to support an overhaul program?

If yes, how did your company acquire such rights? Please provide your license or certificate to substantiate this.

Provide a copy of the purchase order, or other evidence that you have the rights to the data or drawings in your possession.

Offerors should submit proposals that are acceptable without additional explanation or information. The Government may make a final determination regarding a proposal's acceptability solely on the basis of the proposal as submitted; and may proceed with the second step without requesting further information from any offeror. However, the Government may request additional information from offerors of proposals that it considers reasonably susceptible of being made acceptable and may discuss proposals with their offerors.

A notice of unacceptability will be forwarded to the offeror upon completion of the proposal evaluation and final determination of unacceptability.

Multiple technical proposals may be submitted by each offeror.

No telephone requests for the solicitation will be accepted. The pricing piece of the solicitation (step 2) will not be posted on SAM.gov and will only be provided to the contractors who pass step 1\. Requests for step 2 of the solicitation shall not be responded to. This requirement is currently unfunded.

## Contacts

* Mariel L. Chambers
* Edward A. Peterson

Email and phone are in the source notice.

[Source notice](https://sam.gov/workspace/contract/opp/5610982be871419abfdb845fae9a296c/view)

[More from United States Department of the Army posted in June 2026](/dept%5Fof%5Fthe%5Farmy/archive/2026-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"W58RGZ26B0013 Step 1 Solicitation for Overhaul of the Searchlight for the UH60 Blackhawk","description":"SOLCITATION STEP 1 FAR PART 14 TWO STEP SEALED BIDDING DATE: 10 Jun 2026 Product or Service Code: 6230 Contracting Office Address: U.S. Army Aviation and Missile Command (W58RGZ) ATTN: CCAM-AVA-B, Building 5303, Martin Road Redstone Arsenal, AL 35898-5280 (US) SUBJECT: Overhaul of the Searchlight for the (UH-60) Blackhawk SOLICITATION NUMBER: W58RGZ-26-B-0013 RESPONSE DATE: 9 July 2026 Contracting Officer: Edward A. Peterson, email:edward.a.peterson4.civ@army.mil Set-Aside Status : NA DESCRIPTION: The contractor shall furnish all labor, facilities, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the overhaul of the following assets: INPUT NSN : 6230-01-653-9052 INPUT P/N : 727-1198/02 OUTPUT NSN : 6230-01-653-9052 OUTPUT P/N: 727-1198/02 ESTIMATED QUANTITY RANGE: Minimum 24 each - Maximum 86 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 14 each) The proposed contractual action will be a Five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) Maintenance and Overhaul type contract, with minimum/maximum quantities listed above. These items are commercial; FAR Part 12 will be utilized. Required delivery shall be FOB Origin. This procurement will be solicited as a Full and Open competitive requirement. 1. The U.S. Army Contracting Command - Redstone Arsenal (ACC-RSA) will issue an Invitation for Bid (IFB) for the overhaul of the Searchlight. All work shall be completed in accordance with the Statement of Work. The Government does not have a Depot Maintenance Work Requirement for this effort (DMWR). The IFB will be issued as a Full and Open Competitive action using the Two-Step Sealed Bidding Method. It is anticipated that a single Firm-fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely based on the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability. Technical proposals (Step-One) shall not include prices or pricing information.This notice begins the technical proposal (Step-One) submission period which ends 9 July 2026. 2. If a bidder is approved to move to step 2, bidders shall ensure submission of fully complete bids, including all fill-in-the blanks. Any bidder submitting a bid agrees by submission that its bid and the prices contained therein will be valid for 60 days after receipt of bids. Only bids based upon technical proposals determined to be acceptable, either initially or as a result of discussions, will be considered for awards, and each bid in the second step must be based on the bidder’s own technical proposals. Technical acceptability for step-one will be determined by the bidder’s response to the following questions: Has your company ever conducted a repair/overhaul or manufacture of the SEARCHLIGHT for the UH-60? If not, has your company performed repairs on the same, or like item in the past? If yes, when, for how long, in what quantity, and what specific item? If it was under a military contract, what is the contract number? Who was the Primary Contracting Officer? Please provide his or her name, organization, and contact information. Please provide contact information for the Defense contract management Agency (DCMA) that serves as your administrative contracting officer. Describe the following in the amount of detail necessary. If any portion of the overhaul program is outsourced, then the following requirements of line items E – K) must be imposed on the outsourced vendor(s). Does your company have overhaul and replacement capability? Does your company have a documented quality plan/process? Please provide the following details regarding your company's quality plan. Calibration program Continues improvement/self-audits program Non-conformance parts \u0026 quality escapes Parts obsolescence Periodic training/certification/recertification program Certification/release of test stand/equipment for production Traceability of repair \u0026 maintenance performed, records keeping program What are the required minimal qualification and specialized skills of an electronic technician? Describe experience in depinning and pinning electrical connectors. Describe experience in replacing crimp type pins. Describe experience in circuit-board level repair, desolder and solder of electrical...","url":"https://matchawards.com/dept_of_the_army/posts/116727078866084212","identifier":"W58RGZ26B0013Step1","category":"335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"6230 - ELECTRIC PORTABLE AND HAND LIGHTING EQUIPMENT"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.3 Facility Related Materials","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-materials"}],"availabilityStarts":"2026-06-10","availabilityEnds":"2026-07-09","validThrough":"2026-07-09T23:59:59-04:00","areaServed":"UNITED STATES","sameAs":"https://sam.gov/workspace/contract/opp/5610982be871419abfdb845fae9a296c/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

