Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
- Status
- Closed, the response deadline passed on Sep 3, 2026
- Agency
- United States Department of the Army
- Office
- OMAHA, USA
- Notice type
- Presolicitation
- Solicitation number
- W9128F26RA017
- NAICS
- 237130 - Power and Communication Line and Related Structures Construction
- PSC
- Y1NZ - CONSTRUCTION OF OTHER UTILITIES
- Category
- Construction Related Services (4.2)
- Posted
- 2026-08-04
- Deadline
- 2026-09-03
- Place of performance
- 82001
Description
$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 description. The Phase Two Seed Project Specifications and Drawings contain Controlled Unclassified Information and instructions to request access to these documents are located in Section 00 00 00. Vendors must be registered in both System for Award Management and Procurement Integrity Enterprise Environment to obtain approval for access to all CUI documents and submit proposals. Reference Solicitation Section 00 22 10 for registration instructions to access these systems. Reference the Solicitation for compliance with NIST and Cybersecurity Maturity Model Certification requirements as it pertains to this acquisition.Contacts
- Brandon Landis
Email and phone are in the source notice.
More from United States Department of the Army posted in March 2026