Monroe Harbor Advanced Maintenance Dredging
- Status
- Closed, the response deadline passed on Jan 21, 2026
- Agency
- United States Department of the Army
- Office
- DETROIT, USA
- Notice type
- Solicitation
- Solicitation number
- W911XK26BA013
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Y1KF - CONSTRUCTION OF DREDGING FACILITIES
- Category
- Construction Related Services (4.2)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2026-01-28
- Deadline
- 2026-01-21
- Place of performance
- 48162
Description
Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted. The harbor will be dredged to a depth of 23-ft below Low Water Datum (LWD) plus 1-ft overdepth or point of refusal, whichever is less, within the main channel for STA 60+00 to 76+00, 0+00 to 20+00 river and 0+00 to 20+00 lake. From STA 15+75 to 4+00, a section near the wall will be dredged to 20 ft below LWD plus 1-ft overdepth or point of refusal, whichever is less. The turning basin will be dredged to a depth of 20-ft below LWD plus 1-ft overdepth or point of refusal, whichever is less, for STA 64+72 to 79+00. Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF). No discharge is allowed at Pointe Mouillee CDF. Demobilize when dredge work is complete.Attachments
Contacts
- Sally Artz
Email and phone are in the source notice.
More from United States Department of the Army posted in December 2025