ClickCease Inspection of a Radial Thrust Bearing Assembly | Closed - MatchAwards

Inspection of a Radial Thrust Bearing Assembly

Status
Closed, the response deadline passed on Dec 30, 2025
Agency
United States Department of the Army
Office
SAINT PAUL, USA
Notice type
Solicitation
Solicitation number
W912ES26QA0110001
NAICS
333914 - Measuring, Dispensing, and Other Pumping Equipment Manufacturing
PSC
J031 - MAINT/REPAIR/REBUILD OF EQUIPMENT- BEARINGS
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-12-17
Deadline
2025-12-30
Place of performance
Fountain City, Wisconsin 54629, UNITED STATES

Description

Statement of Work (SOW)

Radial Thrust Bearing Assembly Inspection and Repair

1. Scope

This Statement of Work (SOW) defines a two-part effort for the inspection and repair of the radial thrust bearing assembly installed on the VOSTA HPD 550-1350-280 dredge pump.

Phase 1 – Inspection, Report, and Repair Estimate

The contractor shall perform a full inspection of the radial thrust bearing assembly to document component condition, identify the cause of oil leakage, and produce a written inspection report with a detailed repair/replacement cost estimate. The phase 1 price will include return shipping to the Corps’ FCSB location.

Phase 2 – Repair and Replacement (Upon Government Approval)

Repair or replacement activities shall occur only after the Government issues written approval. The objective is to restore the assembly to full operational capability in accordance with OEM and industry standards.

Oil leakage has been observed at the seals; therefore, special attention shall be given to seal condition, integrity, and lubrication during both inspection and repair.

The Corps reserves the right to compete the repair among other vendors. Should the firm awarded the inspection contract not win the contract for repair work the unit will be, reassembled (if needed), safely packaged, and returned to the Corps’ FCSB location no later than 14 business days from notification.

2. Applicable Documents

The following documents shall guide this effort.

The contractor shall have permission for use and access to the following company provided documents:

The work shall comply with the latest revisions of the following standards:

Standard

Description

ISO 13709 / API 610

Centrifugal Pumps for Petroleum, Petrochemical, and Natural Gas Industries (primary heavy-duty pump specification).

ISO 5199

Technical specifications for centrifugal pumps — Class II.

ISO 281

Rolling bearings — Dynamic load ratings and rating life.

ISO 1940-1

Mechanical vibration — Balance quality for rigid rotors.

ANSI/ABMA 9

Load Ratings and Fatigue Life for Ball Bearings.

ANSI/ABMA 11

Load Ratings and Fatigue Life for Roller Bearings.

ANSI/ABMA 7

Shaft and Housing Fits for Metric Radial Ball and Roller Bearings.

ANSI/EASA AR100

Recommended practice for repair of rotating electrical apparatus—Section 2.2 regarding bearings.

3. Requirements

3.1 Phase 1 – Inspection Requirements

The contractor shall:

3.2 Phase 2 – Replacement of Damaged Components (Upon Approval)

The contractor shall:

3.2.1 Government Approval Requirement

No removal, replacement, or repair work shall begin without written authorization from the Contracting Officer (CO). Any unauthorized repair work shall be performed at no cost to the Government.

3.3 Testing and Verification – to be priced as part of any repair submission.

After completion of approved repairs, the contractor shall:

4. Materials and Workmanship

5. Deliverables

The contractor shall provide:

  1. Phase 1 inspection report, including findings, required replacements, and photos.
  2. Repair cost estimate.

6. Quality Assurance and Acceptance

Government representatives may witness inspection, repair, and testing activities.

Final acceptance shall be based on:

7. Schedule

8. Shipping, Delivery, and Reporting

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in December 2025

More lists