Install Fiber in Buildings 208 to 209
- Status
- Closed, the response deadline passed on Sep 18, 2025
- Agency
- United States Department of the Army
- Office
- FORT LEAVENWORTH, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- W91QF425Q0037
- NAICS
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
- PSC
- N099 - INSTALLATION OF EQUIPMENT- MISCELLANEOUS
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2025-09-03
- Deadline
- 2025-09-18
- Place of performance
- Monterey, California 93944, UNITED STATES
Description
Fiber Optic Cable Installation Requirements
1. Starting Point (Building 209 - Communication Room):
o Install an LC adapter panel in the northwest corner of the communication room, adjacent to the .EDU switch rack.
o Route the fiber optic cable along the upper wall, adjacent to the adapter panel, into the next room where the conduit entry is located.
2. Conduit Routing:
o Utilize the pre-installed 60-foot underground conduit connecting Building 209 and Building 208.
o Use the pre-installed pull string/rope/tape to guide the fiber optic cable through the conduit.
o Ensure the existing duct seals at both conduit ends remain intact to maintain waterproofing and firestopping standards.
3. Routing in Building 208 (Theater):
o Upon entry into the mechanical room, route the fiber cable through the wall to the left of its entry point.
o Secure the cable along the wooden ceiling within the crawl space beneath the theater for approximately 100 feet.
o Transition the cable vertically at the north end of the building through an unused airshaft into the lobby preceding the projector room.
4. Termination and Enclosure (Projector Room Lobby):
o Install a 6-port LC fiber adapter panel adjacent to an electrical outlet on the south side of the projector room lobby.
o Mount the fiber optic cable in the specified low-profile, switch-depth wall-mount mini rack enclosure.