ClickCease Pave Parking Area at John W. Flannagan Dam and Reservoir | Closed - MatchAwards

Pave Parking Area at John W. Flannagan Dam and Reservoir

Status
Closed, the response deadline passed on Sep 17, 2025
Agency
United States Department of the Army
Office
PITTSBURGH, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
W9123725QA061
NAICS
237310 - Highway, Street, and Bridge Construction
PSC
Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Category
Construction Related Services (4.2)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-09-08
Deadline
2025-09-17
Place of performance
24256

Description

The contractor shall provide all materials, equipment, labor, layouts of work features, and supervision needed to complete paving.Project construction will generally consist of the following items of work:? The Contractor shall apply a tack coat conforming to VDOT Item 310-1 on all areas to be resurfaced. Tack coat shall be placed at 0.10 gallons per square yard. ? The Contractor shall place a 2 inch surface course of asphalt concrete pavement on all areas, surface course must conform to VDOT Item 315-1. Asphalt will begin at the entrance to the project office from main road and shall continue up thru the Main office parking area, 4000 square yards. All paving will be full depth. The existing parking area has an existing gravel base.? Contractor shall ensure all paving will drain water without any water standing. Contractor shall prepare the site to avoid any low or high spots before paving. ? Paving is 4000 square yards feet of full depth pavement consisting of a 2-base course with a 1 � top coat surface course which shall conform to the same VDOT specifications required.? The Contractor shall grade, reshape, and compact all areas as needed. In areas with no existing base, the Contractor shall place and compact an additional 2- 4-inch aggregate base in accordance with VDOT Item 309-1. A two-layer asphalt base course shall be installed per VDOT Item 315-1, BM-2. A tack coat, per VDOT Item 310-1 shall be applied at a rate of .10 gallons per square yard. Finally, a 1 inch asphalt surface course shall be placed over all base material, conforming to VDOT Item 315-1, SM-2-A. ? Contractor shall taper asphalt to adjoining roads and parking areas. ? A drawing defining the approximate area is included below. Note, buildings in the drawing are no longer in the area. Drawing is not to scale and used for a reference only. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.

Source notice

More from United States Department of the Army posted in September 2025

More lists