3RD FLOOR FLOORING REPLACEMENT, 2-1731, FT BRAGG NC
- Status
- Closed, the response deadline passed on Sep 17, 2025
- Agency
- United States Department of the Army
- Office
- FORT BRAGG, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- W9124725QA023
- NAICS
- 314110 - Carpet and Rug Mills
- PSC
- Z2AA - REPAIR OR ALTERATION OF OFFICE BUILDINGS
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2025-09-12
- Deadline
- 2025-09-17
- Place of performance
- Fort Bragg, North Carolina 28310, UNITED STATES
Description
The Mission and Installation Contracting Command – Fort Bragg (MICC-BR) has received a requirement from the Directorate of Public Works (DPW) FZ-40113-25 Replace Carpet inf Offices, 2-1731, Fort Bragg, North Carolina. The Statement of Work contains specific deliverables and identifies the scope of work that is to be completed by the contractor. The contractor is required to furnish all labor, equipment, transportation, tools, supervision, and materials necessary to perform the required work outlined in the Statement of work and technical exhibits.
RSVP SITE VISIT 4PM, EDT, 4 SEP 2025
SITE VISIT 10AM, EDT, 8 SEP 2025
Q AND A 10AM, EDT, 10 SEP 2025
RFQ SUBMISSION 4PM, EDT 17 SEP 2025.
Submission Requirements:
a. All question shall be emailed to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.
mil no later than 12:00 PM, noon, Eastern Daylight Time (EDT) on 10 SEP 2025. Late questions may not be accepted or
considered. All questions and answers will be combined on a single document which will be made available to all qualified
offerors, on a non-attribution basis. Verbal questions will not be answered.
b. Quotes shall be submitted to Paul Ciabotti at paul.m.ciabotti.mil@army.mil and Philhwa Kim at philhwa.kim.mil@army.mil
no later than 4:00 PM, EDT on 17 SEP 2025. Late quotes may not be considered for evaluation or award.
Site visit:
a. Interested parties will RSVP to Paul Ciabotti at paul.m.ciabotti.mil@army.mil, Philhwa Kim at philhwa.kim.mil@army.
mil, and Souvannaly Keel souvannaly.s.keel.mil@army.mil no later than 4:00 PM, EDT on 4 SEP 2025, however, it is not mandatory. See the provision 52.236-27 Site Visit
(Construction) for further information.
Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
More from United States Department of the Army posted in September 2025