Soil Sampling and Analysis of Wastewater Lagoons
- Status
- Closed, the response deadline passed on Sep 15, 2025
- Agency
- United States Department of the Army
- Office
- APO, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- W5J9JE25R0010
- NAICS
- 541380 - Testing Laboratories and Services
- PSC
- B533 - SPECIAL STUDIES/ANALYSIS- WATER QUALITY
- Category
- Management Advisory Services (2.3)
- Posted
- 2025-09-11
- Deadline
- 2025-09-15
- Place of performance
- KUWAIT
Description
Determine the extent of contamination within the wastewater lagoon system footprint at Camp Buehring, Kuwait (CBKU). The existing Wastewater Treatment Facility is located outside the bounds of CBKU and is surrounded by berms roughly 20 ft. high. It includes three aeration lagoons, two evaporation ponds, and one drying bed pond. Additionally, there is a stockpile in the southeast corner of the facility area that is assumed to be dredged soil from within the water treatment components.Contacts
- Christopher R. Preston II
- Kisha Cook
Email and phone are in the source notice.
More from United States Department of the Army posted in August 2025