ClickCease Forestry Cutter/Mulcher with Forestry Applications Kit and Door… | Closed - MatchAwards

Forestry Cutter/Mulcher with Forestry Applications Kit and Door wiring

Status
Closed, the response deadline passed on Aug 22, 2025
Agency
United States Department of the Army
Office
SAINT PAUL, USA
Notice type
Solicitation
Solicitation number
W912ES25QA052
NAICS
333120 - Construction Machinery Manufacturing
PSC
3830 - TRUCK AND TRACTOR ATTACHMENTS
Category
Machinery & Components (5.1)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-08-05
Deadline
2025-08-22

Description

Forestry Cutter/Mulcher with Forestry Applications Kit and Door wiring Harness Fit a 2023 Bobcat T770, M-Series, Serial number AT6343451Drum style High Flow motor (Current Bobcat T770 flow rate of 36.6 gpm) 60-72 inch cutting width Double carbide tipped teeth Rotor Brake to stop from full speed Adjustable push bar/tree bumper Capability to remove up to 12 inch diameter trees Will be used in areas with both soft and hard wood species. Must Include: one extra complete set of carbide tipped teeth Forestry Applications Kit - to include installation Kit shall include the following: (skid steer currently contains fire extinguisher)?Forestry Door (3/4 in. laminated polycarbonate): ?Front and Rear Light Guards: ?Hydraulic Quick Coupler Guard: ?Level II FOPS: (meets ISO 3449) ?Lift Cylinder Debris Shields Muffler Guard: ?Polycarbonate Top, Rear, and Side Windows: {minimum 1/4 in. polycarbonate) Door Wiring Harness Kit-to include installation USACE will be keeping all the components that are being replaced. Installation of Forestry applications kit and Door wiring harness kit: Contractor shall include the installation of any required wiring harness; the required ISO 3449 Level II Falling Object Protective Structure {FOPS), and debris guards for the muffler, lights and hydraulic components. The installation shall be accomplished by the contractor both picking up the skid steer and returning the skid steer to the customer after installation completion of the kits, or by sending a technician to the customer to accomplish the installation. Delivery and installation no later than November 15, 2025.Deliver FOB to:Army Corps of Engineers Lac qui Parle Project9055 1st W Watson, MN 56295.

Source notice

More from United States Department of the Army posted in August 2025

More lists