ClickCease Pajaro River Reach 6 (W912P725BA012) | Closed - MatchAwards

Pajaro River Reach 6

Status
Closed, the response deadline passed on Aug 28, 2025
Agency
United States Department of the Army
Office
SAN FRANCISCO, USA
Notice type
Solicitation
Solicitation number
W912P725BA012
NAICS
237990 - Other Heavy and Civil Engineering Construction
PSC
Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Category
Construction Related Services (4.2)
Posted
2025-08-28
Deadline
2025-08-28
Place of performance
95076

Description

CONTRACTOR SITE VISIT SIGN IN SHEET UPLOADED TO ATTACHMENTS***********************************AMENDMENT 0001 - POSTED 7/16/205: The purpose of this amendment is to provide the site visit time, date, and location, amend clause 52.236-1, and provide a list of outstanding conflict items that are currently being resolved and their resolution date***************************************************************************This Procurement will be conducted under PSC CODE: Y1PZ NAICS Code: 237990. The size standard for this code is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin: logan.champlin@usace.army.mil or the contracting officer Mary Fronck (mary.fronck@usace.army.mil). Estimated Cost Range is between $25-$100M. IFB/Solicitation Number: W912P725BA012. PROJECT DESCRIPTION: This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The project area is located within the lower Pajaro River watershed. It encompasses an area of approximately 10,000 acres, which includes the stream channels, active floodplains, and terraces along the Pajaro River and the Salsipuedes and Corralitos Creeks. The area is divided by the Pajaro River, which serves as a border for two counties. Santa Cruz County lies to the north of the Pajaro River, and Monterey County lies to the south. The Salsipuedes and Corralitos Creeks, which join just north of the Pajaro River in Santa Cruz County, are tributaries of the Pajaro River. The engineered levees have a crest elevation of ranging from 2 to 8 feet, a minimum crest width of 20 feet, and 3H:1V side slopes. The access road, on top of the levee, will be surfaced with a minimum of 8 inches of CalTrans Class 2 Aggregate Base. Structural features included in the contract include 1,500 LF of 6 ft to 9 ft high floodwall walls. The Highway 152 Bridge will be raised approximately 6 ft and it is a separate project. The first 100 ft from boarding the bridge are left for future construction with the bridge. The solicitation will be available on/about 01 July 2025 for viewing/downloading. FAR Clause 52.222-34 PROJECT LABOR AGREEMENT IS INCLUDED IN THIS CONTRACT AS PRESCRIBED in FAR 22.505. BIDS will be due on 08 August at 12:00 PM PDT. The specific date and time will be identified in the solicitation. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format.NOTE:a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers.b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml.c) Offers MUST BE submitted electronically through the PIEE website.d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in July 2025

More lists