ClickCease Repair/Replace P-23 Fire Truck Water/Foam Tank | Closed - MatchAwards

Repair/Replace P-23 Fire Truck Water/Foam Tank

Status
Closed, the response deadline passed on Jul 8, 2025
Agency
United States Department of the Army
Office
MCGHEE TYSON ANG BASE, USA
Notice type
Sources Sought
Solicitation number
W50S98-25-Q-0006
NAICS
811111 - General Automotive Repair
PSC
J025 - MAINT/REPAIR/REBUILD OF EQUIPMENT- VEHICULAR EQUIPMENT COMPONENTS
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-06-24
Deadline
2025-07-08
Place of performance
Louisville, Tennessee 37777, UNITED STATES

Description

Repair P-23 Fire Emergency Response Vehicle Water/Foam Tank

Date Published: June 24, 2025

Contact: Contracting Office, 134 MSG/MSC, 123 Briscoe Drive McGhee Tyson ANG Base, TN

37777, POC: TSgt Andrew Headrick

Synopsis: Repair P-23 Fire Emergency Response Vehicle Water/Foam Tank

The purpose of this synopsis is to gain knowledge of potential sources for this project including interested

Small Business sources. This notice is for planning purposes only. All interested parties should respond.

McGhee Tyson Air National Guard Base, Tennessee intends to issue a solicitation and award of a contract to

“Repair Emergency Fire Vehicle Water/Foam Tank”.

P-23 Fire Emergency Response Vehicle Water/Foam Tank Replacement Services

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Water/ Foam Tank Replacement Service, as defined in this PWS.

1.1.1 Objectives: Tank replacement to fix foam leak

1.2 Background: Replace the water/foam tank and perform an operational check to verify fix

5.0 Requirements: The vehicle will be delivered to contractor’s place of business within 50 Miles of McGhee Tyson ANG Base.

Upon receipt of the vehicle, the contractor shall:

-               Remove upper tank plating, bracketry, all necessary plumbing, and electrical wires and components surrounding water/foam tank.

-               A tank cradle will need to then be fabricated for the tank anchor points for removal of the tank by a crane.

-               Upon tank removal an inspection of the truck will need to be performed to verify integrity of tank hold points with new Isolators and Bushings replacing the old.

-               Old tank components that are attached will then need to be installed on new tank.

-               Installation of the new tank begins by lifting with a crane and installing in the vehicle securing it to the mounting points.

-               Re-Install all removed components such as plumbing and electrical, as well as upper tank plating and bracketry.

-               The truck will be filled with water and pump tested to ensure product was installed correctly checking for any leaks, cracks, or other issues that may arise.

All interested vendors will provide this office, in writing, a notice stating their positive intent to submit a proposal as a prime contractor no later than 8 July 2025. This notification, which shall not exceed five typewritten pages,

must include (1) positive statement of intent to bid as a prime contractor, and (2) a completed and signed

Source Sought Information Request Form (add link to form) and (3) A brief outline of

resources, subcontractors, and key personnel that would be used to accomplish the contract.

In the event adequate Small Business contractors are not available for adequate competition for this

project, it may be advertised as unrestricted. Include the following in the subject line "Sources Sought W50S98-25-Q-0006".

Information shall be provided via email to TSgt Andrew Headrick, Contract Specialist, Tennessee Air National Guard, McGhee Tyson ANG Base, Louisville, TN 37777. andrew.headrick@us.af.mil.  No facsimile responses will be honored.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in June 2025

More lists