Mississippi River Basin, Lock 19, Keokuk, IA, Nose Pier Replacement and Bulkhead Recesses
- Status
- Closed, the response deadline passed on Aug 11, 2025
- Agency
- United States Department of the Army
- Office
- ROCK ISLAND, USA
- Notice type
- Solicitation
- Solicitation number
- W912EK25RA018SOL
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
- Category
- Construction Related Services (4.2)
- Posted
- 2025-07-31
- Deadline
- 2025-08-11
- Place of performance
- Keokuk, Iowa, UNITED STATES
Description
Project Title: Mississippi River Basin, Keokuk, IA, Lock 19 Nose Pier Replacement and Bulkhead Recess
See Section 01-11-00 of the Specifications for the Scope Of Work
Estimated Range: $25,000,000 - $100,000,000
Completion Days: 638 Consecutive Calendar Days, 973 Consecutive Calendar Days If Option 2 Is Awarded
NAICS Code: 237990 - Size Standard $45,000,000
Unrestricted - Lowest Price Technically Acceptable (LPTA)
Questions regarding this project shall be submitted via Projnet.
The US Army Corps of Engineers (USACE) Rock Island District has a requirement for a Nose Pier Replacement and Bulkhead Recess at Lock 19, Keokuk, IA. The work includes but is not limited to: a base bid and two options. The base bid extends the river wall monolith upstream and includes mobilization, hydrographic surveys, concrete removal above and underwater, mechanical dredging, underwater rock excavation, monolith extension using precast concrete segments and tremie concrete placement, checkposts and other appurtenances, fabrication of protection plate assembly, and electrical work. Option 1 constructs a bulkhead recess in the land wall and includes fabrication and installation of a cofferbox, concrete removal above and underwater, fabrication and installation of a bulkhead recess, concrete placement above and underwater, fabrication and installation a of protection plate assembly, and electrical work. Option 2 constructs the bulkhead sill and includes mobilization, hydrographic surveys, mechanical dredging, drilled shafts, stay-in-place formwork, and tremie concrete placement, and test dewatering of the upstream chamber from the new bulkhead sill to the guard gate, bulkheads will be government furnished equipment.
Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
Contacts
- Bobbi Boeh
- Jeffrey R. Voss
Email and phone are in the source notice.
More from United States Department of the Army posted in June 2025