ClickCease Mud Moutain Dam Equipment Chipping | Closed - MatchAwards

Mud Moutain Dam Equipment Chipping

Status
Closed, the response deadline passed on Jun 27, 2025
Agency
United States Department of the Army
Office
SEATTLE, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
W912DW25Q8005
NAICS
238910 - Site Preparation Contractors
PSC
3805 - EARTH MOVING AND EXCAVATING EQUIPMENT
Category
Construction Related Materials (4.1)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-06-17
Deadline
2025-06-27
Place of performance
Enumclaw, Washington 98022, UNITED STATES

Description

Equipment and operator is needed as descriped in the Statement of Work.  The period of performance for this project is from 1 August to 30 September

Excavator will be used to retrieve Large Woody Debris throughout the debris basins. The LWD will then be decked for pickup at a later date. Excavators and dozer will be used to gather piles for chipper.

The technically acceptable sizes of the equipment is in the statement of work.

Please note: Diamond Z DZT1352B or similar tub grinder min HP 850, with a minimum 10’ x 10’ opening capable of reducing, large logs, stumps, and old growth timber, Average DBH of logs is up to 6 feet and stumps up to 12 feet in diameter, tub grinder shall reduce debris into 6" minus chips is required with the equipment and operator for this project.