ClickCease NTC 25-09 Requirement - Light Sets x 64 | Closed - MatchAwards

NTC 25-09 Requirement - Light Sets x 64

Status
Closed, the response deadline passed on Jun 19, 2025
Agency
United States Department of the Army
Office
JACKSONVILLE, USA
Notice type
Solicitation
Solicitation number
W911YN25QA026
NAICS
532490 - Other Commercial and Industrial Machinery and Equipment Rental and Leasing
PSC
W099 - LEASE OR RENTAL OF EQUIPMENT- MISCELLANEOUS
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-06-12
Deadline
2025-06-19
Place of performance
Fort Irwin, California 92310, UNITED STATES

Description

Short Notice Requirement for NTC 25-09.

The 53rd IBCT requires the renting of six (64) light towers The contractor shall be responsible for furnishing all materials, labor and equipment necessary to deliver, set-up, maintain, tear down, and remove Light Towers at Fort Irwin, CA. Prior to arrival, coordinate with Government Representative.
.
The Light Towers must be equipped with a towing pintle capable of being attached to a standard military High Mobility Multipurpose Wheeled Vehicle (HMMWV). The contractor can use an interchangeable hitch to place equipment for each location; however, the towing pintle must be in place no later than the day prior to the start of each POP.

The contractor shall ensure the light output meets or exceeds 4,000 Lumens. If diesel operated, the contractor shall ensure the light bulbs have a total power output of no less than 4kW and a total power output for the generator of no less than 6kW.

The contractor shall ensure the Light Towers run on Ultra Low Sulfur Diesel (ULSD) OR Solar.

If using Diesel Operated power, equipment must be compatible with ULSD fuel. Government will provide ULSD fuel. The
contractor shall label each piece of equipment next to the fuel tank with the wording "Diesel Fuel Only" IF APPLICABLE. Failure to label accordingly will invalidate contractor claims regarding use of incorrect fuel. The contractor shall ensure all Light Towers are delivered with all necessary parts in accordance with(IAW) the operators' manual and generators must have a full tank of fuel (diesel operated) or fully charged (solar). The Government will not be responsible for returning equipment with a full tank of gas or paying to refuel the equipment at the end of the Period of Performance. The government will also not be responsible solar operated light sets that are not charged.

The contractor shall have 24 hour services and be capable of makinga light set solution operational within 8 hours of a service call. All backup units utilized in the event of primary failure shall be at no additionalcost to the Government.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in June 2025

More lists