ClickCease FY25 TELEMETRY EQUIPMENT for USACE Kansas City District MRSAMP - MatchAwards

FY25 TELEMETRY EQUIPMENT for USACE Kansas City District MRSAMP

Status
Closed (no response deadline listed, posted May 12, 2025)
Agency
United States Department of the Army
Office
KANSAS CITY, USA
Notice type
Justification
Solicitation number
W912DQ25P1019
NAICS
334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
PSC
5820 - RADIO AND TELEVISION COMMUNICATION EQUIPMENT, EXCEPT AIRBORNE
Category
Security and Protection (3)
Posted
2025-05-12
Deadline
Not stated
Place of performance
UNITED STATES

Description

Multiple telemetry studies are identified in the U.S. Army Corps of Engineers, Missouri River Science and Management Plan (MRSAMP) and the U.S. Fish and Wildlife Service Biological Opinion for pallid sturgeon in the Missouri River. These are high priority studies that build on existing studies and equipment. The studies are critical in evaluating the effects of high-impact management actions on 
pallid sturgeon movement, reproduction and survival. It is required that all participating State and Federal agencies acquire and use the identical equipment specified in this purchase request to achieve scientifically defensible population metrics and measurable responses to the critical management actions as identified in the Missouri River Science and Adaptive Management Plan.

This action is for a new firm fixed price single source requirement.
• Two (2) Vemco 8 channel DSP manual tracking acoustic receiver, single hydrophone port, 12-200 kHz 
bandwidth, integrated internal GPS, USB computer communication, hydrophone transponding capable.
• Two (2) Omnidirectional hydrophone, 69 kHz, with 10-meter cable.
• One (1) Directional Hydrophone, 69 kHz, with 10-meter cable
• One hundred (100) Vemco acoustic telemetry transmitter tags, 69 kHz, 1.) On 2 days, Power H, 
Random delay; 60-120 seconds. 2.) Off 7 Days 3.) On 270 days, Power H, random delay 60-120 
seconds, loop back to step 3, estimated tag life 279 days.

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in May 2025

More lists