title: Crossover Cable Replacement at Lock and Dam 2 in Hastings, MN | Closed - MatchAwards
description: Crossover Cable Replacement at Lock and Dam 2 in Hastings, MN. United States Department of the Army. Solicitation W912ES25QA020. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Total small business set-aside. Deadline 2025-05-30. Scope of work Dam Feeder Cable...
canonical: https://matchawards.com/dept_of_the_army/posts/114415908992559515
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Crossover Cable Replacement at Lock and Dam 2 in Hastings, MN | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/114415908992559515
og:description: Crossover Cable Replacement at Lock and Dam 2 in Hastings, MN. United States Department of the Army. Solicitation W912ES25QA020. NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors. Total small business set-aside. Deadline 2025-05-30. Scope of work Dam Feeder Cable...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Crossover Cable Replacement at Lock and Dam 2 in Hastings, MN

Status

Closed, the response deadline passed on May 30, 2025

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

SAINT PAUL, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

W912ES25QA020

NAICS

[238210 - Electrical Contractors and Other Wiring Installation Contractors](/groups/227)

PSC

Z1KA - MAINTENANCE OF DAMS

Category

[Facility Related Services (4.4)](/categories/facilities-and-construction/facility-related-services)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2025-05-23

Deadline

2025-05-30

Place of performance

Hastings, Minnesota 55033, UNITED STATES

## Description

Scope of work  
Dam Feeder Cable Replacement  
1\. general  
1.1 Project description  
The work consists of replacing segments of circuits Dam Feeder No.1 and Dam Feeder No. 2 and the removal of unused cables located in the crossover system at Lock and Dam No. 2 in Hastings, MN. The cable segments requiring replacement start at manhole 1 and end at manhole 2 as shown in Figure 1-1 (see SOW Attachments). Dewatering the crossover system is required to access the cables. Additionally, the contractor will identify conductors currently in use and provide documentation showing the cable routing through the crossover system. All electrical work must comply with the latest edition on NFPA-70, National Electrical Code.  
1.1.1 Crossover System  
All cables required for the electrical systems located on the river wall, the dam, or the hydropower plant, are routed underneath the lock via the crossover system. Access to the crossover system is obtained from either manhole 1 or manhole 2 via a vertical shaft starting at the manhole floor. The manhole 1 shaft is 12'x 2'-6" with a depth of 28'. The manhole 2 shaft is 10'x 2'-6" with depth 32'. Both shafts have four sets of embedded ladder rungs that are used to traverse the shaft. The use of fall protection equipment is required when accessing the crossover system and the entire system is considered a confined space.  
On both sides of the lock, a 4'-6"x 6'-6" tunnel connects the bottom of the shafts to the crossover duct bank. Two, 9" cable trays are mounted on both sides of each tunnel and are used to route cables from the vertical shafts to the crossover duct bank. Additionally, two 13.2 kV cables, protected by flexible conduit, are routed underneath the cable trays on the upstream wall of each tunnel. The crossover duct bank is shown in Figure 1-3 (see SOW Attachment) and consist of 49, 3" fiber conduits, with porcelain end bells.  
1.1.2 Dam Feeder Cables  
The dam feeder circuits provide primary and emergency power to the dam. Each circuit consists of two sets of parallel cables (DFXA&DFXB). An attempt was made to replace both circuits in 2015\. However, challenges with dewatering the crossover system resulted in the new cables being spliced to the exiting cables routed through the crossover system. The splices are located at the bottom of manholes 1 & 2, near the entrance to the vertical shafts. The routing of the cables in manhole 2 is shown in Figure 1-2 (see SOW Attachment). From the splices in manhole 2, the cables continue vertical to the ceiling of manhole 2\. The cables then run down the inside of the downstream wall where the cables exit the manhole through 4" holes located at the manhole floor.  
The contractor must remove and replace all four cables (DF1A, DF1B, DF2A, and DF2B) from the splice in manhole 1 to the splice in manhole 2\. The splices for the new cables must be made near the ceiling of each manhole to reduce the likelihood of them being submerged in water. The existing cables exiting manhole 2 must be rerouted to run up the cable tray installed on the exterior manhole 2\. The abandoned communication cable shown in Figure 1-2 (see SOW Attachment) should also be rerouted with the dam feeders, but it does not require reconnecting.  
During construction, one of the dam feeder circuits must always remain serviceable to allow for continued operation of the dam. 14 days prior to the commencement of work, the contractor should coordinate with the Contracting Officer to determine which circuit should be replaced first. Following the replacement of the first circuit, the contractor must obtain written approval from the Contracting Officer that the dam electrical equipment has been transferred to the first circuit, and that work can commence on replacing the second circuit. Power will be deenergized during work hours (10 hrs. /day) but one dam feeder must remain serviceable during non-work hours in order to operate the dam. Coordination with the COR is required when river flows are expected to reach 40,000 CFS (cubic feet/second). Work cannot be performed when high-water river flow conditions exceed 40,000 CFS.  
It is the contractor's responsibility to establish an electrically safe work condition, per NFPA-70E, prior to the removal of any cable. The contractor must coordinate the application of lockout devices with the Contracting Officer. If circuits other than dam feeders 1&2 are required to be deenergized to perform any of the work outlined in the scope of work, the contractor must notify the Contracting Officer of the need to deenergize additional circuits. The notification should include the name of the circuits that are required to be deenergized and the estimated time duration of the outage. Following notification, the Contracting Officer will coordinate the application of lockout devices with the contractor.  
1.1.3 Cable Removal and Organization  
There are approximately 30 abandoned Type SOW of various lengths, located within the crossover system. In addition to the abandoned Type SOW cables, there are approximately 5 spare Type AC cables. The spare and abandoned cables are intermixed with the live cables that are required for lock operations. The total number of cables located within the crossover system has far exceeded the capacity of the 4 cables trays located in the crossover tunnel. As a result, numerous cables are laid on the tunnel floor as shown in Figure1-3 (see SOW Attachment).  
The contractor must identify cables located within the crossover system, remove all abandoned Type SOW cables, and relocate any live cables on the floor to the cable trays. Pull cords should be placed in each conduit that has a SOW cable being removed. The spare Type AC cables can remain. The contractor must verify that all live cables have cable tags, and the contractor must replace any cable tags that are missing. Lastly, the contractor will document the cable routing throughout the crossover system.  
1.1.4 Cable Routing Documentation  
The contractor must document the cable routing in the crossover system. The routing must be documented from the prospective of a person in the land wall crossover looking towards the lock. The documentation must indicate what cable is in each conduit of the duct bank and in each cable tray. The documentation must be submitted to the Government in a .PDF format.  
1.1.5 Disposal of Material  
The contractor is responsible for the disposal of all cable and material removed under this contract.  
1.1.6 Crossover Dewatering  
The contractor is responsible for dewatering the crossover system. This includes providing all the equipment necessary to dewater the crossover. The equipment should be either gas powered, or the contractor must make temporary power arrangements with the utility. The contractor must submit a dewatering plan for review 14 days prior to the commencement of work.  
1.2 PRE-bid visit  
Potential bidders are encouraged to visit the site prior to placing bids to ensure that they understand the existing site conditions and the potential challenges associated with completing contract work.  
A site visit for potential offerors is scheduled for May 5, 2025, at 10:30 am. Site visit will be coordinated through Karl Just at karl.p.just@usace.army.mil or 651-290-5768.  
1.3 Construction Schedule  
The contractor shall provide a work schedule in writing no longer than 14 days after receiving the notice to procced. Point of contact for questions is the Contracting Officer Representative (COR) (Available at Award). Work hours are Monday through Friday 07:00 - 17:00.  
1.4 Safety  
Submit an Accident Prevention Plan (APP) and be in conformance with the Corps of Engineers Safety and Health Requirements Manual EM 385-1-1 (latest edition) and will be the sole responsibility of the contractor. The manual is available at the Corps of Engineers web site: http://www.usace.army.mil/publications/eng-manuals/  
1.5 Drawings  
Select as-built drawings and a site plan are included in Appendix A for reference.  
1.6 Submittals  
Submittals must be approved prior to the installation of any material.

<!-- mobian-agent-ad sponsored="true" id="1086a125-71ca-4018-a02f-3b5fb3ecc2c8" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/18c7bfb6526b4a5087d2466215c81517/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/27f75feb403f47bc92974299cee172e8/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/467b346e3f994c4ab119a3f9be337868/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/835ea378b2f84cbc9b03dc8ba98bea63/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/90cce3e71817422889f91b0b1facd558/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a714b105ea1b48a39b7d671e5b8b846a/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b40685c1cf1740deabab1a6a1fc3de1c/download)
* [Attachment 8](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bb2976a4f9424af19e44765346f43f96/download)
* [Attachment 9](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/be269293372a4708b613bbfb015bb29f/download)

## Contacts

* Karl Just
* Jesse Onkka

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/c363ed8d3e52483c8767fdcd7e64e262/view)

[More from United States Department of the Army posted in April 2025](/dept%5Fof%5Fthe%5Farmy/archive/2025-04)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Crossover Cable Replacement at Lock and Dam 2 in Hastings, MN","description":"Scope of work Dam Feeder Cable Replacement 1. general 1.1 Project description The work consists of replacing segments of circuits Dam Feeder No.1 and Dam Feeder No. 2 and the removal of unused cables located in the crossover system at Lock and Dam No. 2 in Hastings, MN. The cable segments requiring replacement start at manhole 1 and end at manhole 2 as shown in Figure 1-1 (see SOW Attachments). Dewatering the crossover system is required to access the cables. Additionally, the contractor will identify conductors currently in use and provide documentation showing the cable routing through the crossover system. All electrical work must comply with the latest edition on NFPA-70, National Electrical Code. 1.1.1 Crossover System All cables required for the electrical systems located on the river wall, the dam, or the hydropower plant, are routed underneath the lock via the crossover system. Access to the crossover system is obtained from either manhole 1 or manhole 2 via a vertical shaft starting at the manhole floor. The manhole 1 shaft is 12'x 2'-6\" with a depth of 28'. The manhole 2 shaft is 10'x 2'-6\" with depth 32'. Both shafts have four sets of embedded ladder rungs that are used to traverse the shaft. The use of fall protection equipment is required when accessing the crossover system and the entire system is considered a confined space. On both sides of the lock, a 4'-6\"x 6'-6\" tunnel connects the bottom of the shafts to the crossover duct bank. Two, 9\" cable trays are mounted on both sides of each tunnel and are used to route cables from the vertical shafts to the crossover duct bank. Additionally, two 13.2 kV cables, protected by flexible conduit, are routed underneath the cable trays on the upstream wall of each tunnel. The crossover duct bank is shown in Figure 1-3 (see SOW Attachment) and consist of 49, 3\" fiber conduits, with porcelain end bells. 1.1.2 Dam Feeder Cables The dam feeder circuits provide primary and emergency power to the dam. Each circuit consists of two sets of parallel cables (DFXA\u0026DFXB). An attempt was made to replace both circuits in 2015. However, challenges with dewatering the crossover system resulted in the new cables being spliced to the exiting cables routed through the crossover system. The splices are located at the bottom of manholes 1 \u0026 2, near the entrance to the vertical shafts. The routing of the cables in manhole 2 is shown in Figure 1-2 (see SOW Attachment). From the splices in manhole 2, the cables continue vertical to the ceiling of manhole 2. The cables then run down the inside of the downstream wall where the cables exit the manhole through 4\" holes located at the manhole floor. The contractor must remove and replace all four cables (DF1A, DF1B, DF2A, and DF2B) from the splice in manhole 1 to the splice in manhole 2. The splices for the new cables must be made near the ceiling of each manhole to reduce the likelihood of them being submerged in water. The existing cables exiting manhole 2 must be rerouted to run up the cable tray installed on the exterior manhole 2. The abandoned communication cable shown in Figure 1-2 (see SOW Attachment) should also be rerouted with the dam feeders, but it does not require reconnecting. During construction, one of the dam feeder circuits must always remain serviceable to allow for continued operation of the dam. 14 days prior to the commencement of work, the contractor should coordinate with the Contracting Officer to determine which circuit should be replaced first. Following the replacement of the first circuit, the contractor must obtain written approval from the Contracting Officer that the dam electrical equipment has been transferred to the first circuit, and that work can commence on replacing the second circuit. Power will be deenergized during work hours (10 hrs. /day) but one dam feeder must remain serviceable during non-work hours in order to operate the dam. Coordination with the COR is required when river flows are expected to reach 40,000 CFS (cubic feet/second). Work cannot be performed when high-water river flow conditions exceed 40,000 CFS. It is the contractor's responsibility to establish an electrically safe work condition, per NFPA-70E, prior to the removal of any cable. The contractor must coordinate the application of lockout devices with the Contracting Officer. If circuits other than dam feeders 1\u00262 are required to be deenergized to perform any of the work outlined in the scope of work, the contractor must notify the Contracting Officer of the need to deenergize additional circuits. The notification should include the name of the circuits that are required to be deenergized and the estimated time duration of the outage. Following notification, the Contracting Officer will coordinate the application of lockout devices with the contractor. 1.1.3 Cable Removal and Organization There are approximately 30 abandoned Type SOW of various lengths, located within the crossover system. In addition to the...","url":"https://matchawards.com/dept_of_the_army/posts/114415908992559515","identifier":"W912ES25QA020","category":"238210 - Electrical Contractors and Other Wiring Installation Contractors","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Z1KA - MAINTENANCE OF DAMS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.4 Facility Related Services","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-services"}],"availabilityStarts":"2025-05-23","availabilityEnds":"2025-05-30","validThrough":"2025-05-30T23:59:59-04:00","areaServed":"Hastings, Minnesota 55033, UNITED STATES","sameAs":"https://sam.gov/opp/c363ed8d3e52483c8767fdcd7e64e262/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```