<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_army/posts/114191307759293511" -->

---
title: Portable 100 ton Chiller with Pump Package | Closed - MatchAwards
description: Portable 100 ton Chiller with Pump Package. United States Department of the Army. Solicitation W50S7X25Q0008. NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing. Deadline 2025-04-02. This is NOT a Sole Source or Brand...
canonical: https://matchawards.com/dept_of_the_army/posts/114191307759293511
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Portable 100 ton Chiller with Pump Package | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/114191307759293511
og:description: Portable 100 ton Chiller with Pump Package. United States Department of the Army. Solicitation W50S7X25Q0008. NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing. Deadline 2025-04-02. This is NOT a Sole Source or Brand...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Portable 100 ton Chiller with Pump Package

Status

Closed, the response deadline passed on Apr 2, 2025

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

MCCONNELL AFB, USA

Notice type

Sources Sought

Solicitation number

W50S7X25Q0008

NAICS

[333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing](/groups/477)

PSC

4120 - AIR CONDITIONING EQUIPMENT

Category

[Facility Related Materials (4.3)](/categories/facilities-and-construction/facility-related-materials)

Posted

2025-03-19

Deadline

2025-04-02

Place of performance

Parkerfield, Kansas 67221, UNITED STATES

## Description

**This is NOT a Sole Source or Brand Name. Only a Sources Sought.**

Portable 100 ton Chiller with Pump Package salient characteristics:

Provide one (1) air cooled chiller unit with the following features:

o Air-Cooled Scroll Packaged Chiller

o Copper Tube / Aluminum Fin condenser coils

o Evaporator-Shell and tube heat exchanger

o Startup Included by manufacturer

o 60 hertz; 460 volt 3 phases

o High efficiency/performance

o Full factory refrigerant charge

o Provided freeze protection (External T-STAT control)

o Refrigerant isolation valves (discharge valve)

o UL listed to US and Canadian safety standard

o ASHRAE 90.1 all versions compliant

o AHRI certified Standard cooling (42 to 65F)

o Grooved pipe connection

o Factory insulation - all cold parts

o High ambient kit (up to 125F)

o Low ambient kit (down to 0F)

o Chiller shall be provided with low leaving fluid temperature option of +10F

o Single point power connection

o Terminal block conn for incoming lines

o Enclosure type UL 1995 rated for outdoor applications

o Water strainer factory installed

o Dual circuit machine for staging and efficiency

o Scroll compressors for dynamic staging control and energy conservation.

o Control transformer power

o Integrated non-fused disconnect - “thru the panel operator”

o TEAO fan motors

o Insulated evaporator

o Condenser coil guards

o Phase monitor and phase fail indicator light (red)

o Main power on indicator (green)

o Master on switch

o Common trouble alarm terminal

o Installed flow switch safety

o Temperature and pressure gauges provided

o Chiller will be provided with standalone DDC temperature controls.

o Chilled water barrel heaters for freeze protection

o Chiller provided with hydronic isolation and drain valves.

o Main power wiring will include single (1) Cam Lok electrical connections

and associated wiring

o Chiller shall be furnished with a 2” x 4” label with white backing and black

lettering stating “NOTE: 480 volt power should be applied a minimum of 1

hour before starting chiller. Compressor oil heaters utilize 480 volt

power.”

 Provide and install pump rated @ 300 GPM @ 100 foot/head. Pump will be

mounted to the chiller skid. The close coupled pump will be integrated into

the interconnecting piping and hydronic components. Installation to include

a pump starter, overload, control switch and breaker.

 Internal chiller piping package to include:

o Integrated bypass to provide operation of local or remote pumps

o Chiller to be provided with isolation/balancing valves, bypass valve for

remote pump operation, in-line strainer with blow down valve, and low

level drain valve.

o Entering and leaving fluid temperature ports and thermometers

o Entering and leaving pressure ports and gauges

o Drain valves at chiller barrel, pump housing and at the piping manifold

lowest point.

o Chiller will be provided with an additional differential pressure safety

switch. This pressure switch is independent of the factory installed safety

switch.

o Provide two (2) additional ¼” access ports for field pressure/temperature

testing.

o Perform hydrostatic pressure testing to 125 PSIG of the entire pump,

piping and component assembly to verify no leaks are present.

o 60’ of quick connect hoses and 60’ of return hoses.

 Provide structural mounting frame for the pump on the chiller skid. Hot

dipped galvanized structural members.

 Provide and install all required electrical power wiring and control devices.

 Provide all required starters, overloads and disconnects.

 The skid shall be fabricated to mount the chiller unit to a trailer unit

 The lifting frame material needs to have to ability to be loaded or moved with forklift

 The chiller shall be attached to the structure along all sides.

 The entire skid and lifting frame shall be provided with a hot dipped

galvanized coating for increased corrosion protection.

 The unit shall be manufactured in accordance with NEC codes, ETL

requirements and labeled with the appropriate 3rd party NRTL as requested.

 Chiller / pump assembly shall be provided with a certified skid / lifting frame

structural calculations and certificates issued by a 3rd party engineering

firm.

 The exterior of the unit shall be properly prepared and coated white.

 Unit to be test run before acceptance

## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/74dd3316375046438d80b82f4a9219e4/download)

## Contacts

* Brent E. Geschwentner
* Darin L Brun

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/817031cb1b3046ceb069f52f07b95535/view)

[More from United States Department of the Army posted in March 2025](/dept%5Fof%5Fthe%5Farmy/archive/2025-03)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Portable 100 ton Chiller with Pump Package","description":"This is NOT a Sole Source or Brand Name. Only a Sources Sought. Portable 100 ton Chiller with Pump Package salient characteristics: Provide one (1) air cooled chiller unit with the following features: o Air-Cooled Scroll Packaged Chiller o Copper Tube / Aluminum Fin condenser coils o Evaporator-Shell and tube heat exchanger o Startup Included by manufacturer o 60 hertz; 460 volt 3 phases o High efficiency/performance o Full factory refrigerant charge o Provided freeze protection (External T-STAT control) o Refrigerant isolation valves (discharge valve) o UL listed to US and Canadian safety standard o ASHRAE 90.1 all versions compliant o AHRI certified Standard cooling (42 to 65F) o Grooved pipe connection o Factory insulation - all cold parts o High ambient kit (up to 125F) o Low ambient kit (down to 0F) o Chiller shall be provided with low leaving fluid temperature option of +10F o Single point power connection o Terminal block conn for incoming lines o Enclosure type UL 1995 rated for outdoor applications o Water strainer factory installed o Dual circuit machine for staging and efficiency o Scroll compressors for dynamic staging control and energy conservation. o Control transformer power o Integrated non-fused disconnect - “thru the panel operator” o TEAO fan motors o Insulated evaporator o Condenser coil guards o Phase monitor and phase fail indicator light (red) o Main power on indicator (green) o Master on switch o Common trouble alarm terminal o Installed flow switch safety o Temperature and pressure gauges provided o Chiller will be provided with standalone DDC temperature controls. o Chilled water barrel heaters for freeze protection o Chiller provided with hydronic isolation and drain valves. o Main power wiring will include single (1) Cam Lok electrical connections and associated wiring o Chiller shall be furnished with a 2” x 4” label with white backing and black lettering stating “NOTE: 480 volt power should be applied a minimum of 1 hour before starting chiller. Compressor oil heaters utilize 480 volt power.”  Provide and install pump rated @ 300 GPM @ 100 foot/head. Pump will be mounted to the chiller skid. The close coupled pump will be integrated into the interconnecting piping and hydronic components. Installation to include a pump starter, overload, control switch and breaker.  Internal chiller piping package to include: o Integrated bypass to provide operation of local or remote pumps o Chiller to be provided with isolation/balancing valves, bypass valve for remote pump operation, in-line strainer with blow down valve, and low level drain valve. o Entering and leaving fluid temperature ports and thermometers o Entering and leaving pressure ports and gauges o Drain valves at chiller barrel, pump housing and at the piping manifold lowest point. o Chiller will be provided with an additional differential pressure safety switch. This pressure switch is independent of the factory installed safety switch. o Provide two (2) additional ¼” access ports for field pressure/temperature testing. o Perform hydrostatic pressure testing to 125 PSIG of the entire pump, piping and component assembly to verify no leaks are present. o 60’ of quick connect hoses and 60’ of return hoses.  Provide structural mounting frame for the pump on the chiller skid. Hot dipped galvanized structural members.  Provide and install all required electrical power wiring and control devices.  Provide all required starters, overloads and disconnects.  The skid shall be fabricated to mount the chiller unit to a trailer unit  The lifting frame material needs to have to ability to be loaded or moved with forklift  The chiller shall be attached to the structure along all sides.  The entire skid and lifting frame shall be provided with a hot dipped galvanized coating for increased corrosion protection.  The unit shall be manufactured in accordance with NEC codes, ETL requirements and labeled with the appropriate 3rd party NRTL as requested.  Chiller / pump assembly shall be provided with a certified skid / lifting frame structural calculations and certificates issued by a 3rd party engineering firm.  The exterior of the unit shall be properly prepared and coated white.  Unit to be test run before acceptance","url":"https://matchawards.com/dept_of_the_army/posts/114191307759293511","identifier":"W50S7X25Q0008","category":"333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"4120 - AIR CONDITIONING EQUIPMENT"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.3 Facility Related Materials","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-materials"}],"availabilityStarts":"2025-03-19","availabilityEnds":"2025-04-02","validThrough":"2025-04-02T23:59:59-04:00","areaServed":"Parkerfield, Kansas 67221, UNITED STATES","sameAs":"https://sam.gov/opp/817031cb1b3046ceb069f52f07b95535/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

<!-- mobian-agent-ad sponsored="true" id="366766dc-687c-4b57-bba4-e1113cf74ff8" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-materials?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->
