ClickCease Narraguagus River Federal Navigation Project Maintenance Dredging | Closed - MatchAwards

Narraguagus River Federal Navigation Project Maintenance Dredging

Status
Closed, the response deadline passed on Apr 17, 2025
Agency
United States Department of the Army
Office
CONCORD, USA
Notice type
Solicitation
Solicitation number
W912WJ25BA010
NAICS
237990 - Other Heavy and Civil Engineering Construction
PSC
Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
Category
Construction Related Services (4.2)
Posted
2025-04-18
Deadline
2025-04-17

Description

The U.S. Army Corps of Engineers, New England District is issuing Invitation for Bids for the Narraguagus River Federal Navigation Project, located in Milbridge, Maine. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take about five months to complete. The estimated construction cost is between $1,000,000 to $5,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District. The Narraguagus River FNP consists of a 11-foot deep Mean Lower Low Water (MLLW), 150-foot-wide entrance channel, a 9-foot-deep MLLW, 100-foot-wide channel, a 6-foot-deep MLLW, 100-foot-wide channel, three 6-footdeep anchorages, two 9-foot-deep anchorages, an 11-foot-deep anchorage, and a 6-foot-deep turning basin. The proposed work consists of dredging approximately 150,000 cubic yards (CY) of predominately fined grained material from shoaled areas of the FNP channel and anchorage areas. The northeastern 6-ft anchorage is not part of the scope of this project and shall not be dredged. The shoaled areas within the project scope will be dredged to the authorized project depths, plus one foot of allowable overdepth. A mechanical dredge will remove material from the shoaled portions of the Narraguagus River FNP and transport the material via scows to the Douglas IslandDisposal Site (DIDS), approximately 2.5 miles away from the FNP.Dredging operations can start on November 1, 2024, for maintenance dredging using a mechanical dredge and placement in open water at DIDS. All work must be complete by April 1, 2025.In order to accomplish all dredging requirements within the specified dredging window the Contractor will need to meet a production rate of at least 40,000 CY per 30 consecutive calendar day period.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in March 2025

More lists