ClickCease Berlin Tree Removal (W911WN25QA008) | Closed - MatchAwards

Berlin Tree Removal

Status
Closed, the response deadline passed on Feb 25, 2025
Agency
United States Department of the Army
Office
PITTSBURGH, USA
Notice type
Solicitation
Solicitation number
W911WN25QA008
NAICS
561730 - Landscaping Services
PSC
F014 - NATURAL RESOURCES/CONSERVATION- TREE THINNING
Category
Facility Related Services (4.4)
Posted
2025-02-19
Deadline
2025-02-25
Place of performance
Deerfield, Ohio 44411, UNITED STATES

Description

1.   GENERAL REQUIREMENTS

The purpose of this contract is to remove trees and grind stumps on the East side of Berlin Dam. All trees shall be cut and removed from project lands within the designated clearing area. All stumps shall be ground to 8” below grade. Designated clearing area is described in the Site Map at the end of this Performance Work Statement.

All work shall be conducted in strict accordance with the following standards of practice:

2. GENERAL DESCRIPTION

Contractor shall furnish all labor, materials, equipment, tools, transportation, supervision, expertise, and related supplies to safely remove selected trees. 

3. SAFETY

Hazards may be (but are not limited to) bee stings, snake bites, and overhead electrical hazards. All personal protective gear and safety protocols shall be adhered to by the Contractor and their employees. At any time when the Government representative witnesses a safety violation, work shall immediately be stopped, and the violation documented and corrected before work can resume.

All work shall be performed in accordance with the Corps of Engineers Safety Manual EM385-1-1  Latest version is available online at

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE%2015March2024.pdf

The Contractor shall develop an Activity Hazard Analysis (AHA) for all work under this contract and submit it to the Contracting Officer’s Representative.  A blank AHA form is attached (Attachment 1 – Blank AHA Form).

The following specific Personal Protective Equipment shall be required under this contract:

The Contractor shall identify and protect all overhead utility lines prior to commencing work in that area.

4. COORDINATION MEETING AND POINTS OF CONTACT (POC)

Prior to commencement of any work being performed on site, the contractor shall participate in a meeting with the Berlin Lake Resource Manager and Contracting Officer’s Representative (COR), which will include approving a work progression plan.

5. VERIFICATION OF FIELD CONDITIONS

The Contractor shall verify all conditions in the field and shall advise the COR of any discrepancy before performing any work.

6. WORK AREAS

The Contractor's attention is directed to the fact that the work to be performed is located in areas heavily used by the public.  It shall be the responsibility of the Contractor to provide the controls necessary to prevent any interference by the public to his operations.  The Contractor shall take all necessary and reasonable precautions to secure the area against vandalism and to ensure the safety and well-being of the public until final acceptance by the Government. 

7. TIME OF PERFORMANCE

The Contractor shall confine all operations at the work site between the hours of 7:00 AM and 4:00 PM, Monday through Friday, unless otherwise approved.  Work will be permitted on weekends or Federal holidays, with permission of the COR (SCA wage rates will apply).  Access guidelines will be provided by the COR.  Contractor shall coordinate contract tasks and activities with the COR.

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in February 2025

More lists