Notice of Intent to Award MK VI Patrol Boat Laydown, Storage, & Maintenance Services to Colonna's Shipyard

Status
Closed, the response deadline passed on Feb 21, 2025
Agency
United States Department of the Army
Office
ALPENA, USA
Notice type
Special Notice
Solicitation number
PANNGB25P0000006202
NAICS
336611 - Ship Building and Repairing
PSC
J019 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIPS, SMALL CRAFT, PONTOONS, AND FLOATING DOCKS
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2025-02-06
Deadline
2025-02-21
Place of performance
Norfolk, Virginia 23523, UNITED STATES

Description

The government intends to award MK VI Patrol Boat Laydown, Maintenance, Storage, & Support Services to Colonna's Shipyard DBA Steel America IAW FAR 13.106-1(b)(1) and FAR 13.106-3(b)(3)(i).

Description of Services: The contractor shall provide all personnel, equipment, tools, materials, supervision, utilities, and quality control necessary, to provide towing, lifting, laydown, storage, and maintenance support required for three (3) MKVI Patrol Boats. Services will include storage at the Contractor's Facility, with minimal routine maintenance functions.

The anticipated period of performance for these services will begin 13 March 2025 for an estimated period of one (1) to four (4) months. Services will be billed monthly and end when services are no longer being rendered.

This requirement was created following the Michigan Air National Guard’s acquisition of 3 Mark VI Patrol Boats from DLA that were slated to be scrapped if they were not procured by an outside agency. It is unknown if the watercraft are seaworthy, and they are currently being stored at a Contractor Facility under an existing Navy Contract, number N0018922P0641. The property is to be transferred and stored under a new MING contract. Discussions with the requiring activity indicated that there is a high risk that the vessels are not seaworthy since they have been stored offshore for 9 years and have not been water tested in 2.5 years. Since the seaworthiness of the vessels is unknown, water towing the vessels could result in the loss of government property. Competing the requirement and having them towed prior to inspection, repair, and fit-in could result in the loss of the government property. Under the current Navy contract, there is no authority to conduct inspection/maintenance/repair of the vessels. The only path forward is to transfer the vessels to a MING contract with the contractor that allows for inspection/maintenance/repair services. The storage is temporary until the MING can determine seaworthiness and prepare the vessels for shipping from the contractor facility to Michigan. 