<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_army/posts/113924232300596400" -->

---
title: Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton,… | Closed - MatchAwards
description: Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton, MA. United States Department of the Army. Solicitation W912WJ25Q0038. NAICS 238320 - Painting and Wall Covering Contractors. Total small business set-aside. Deadline 2025-03-13. THE WORK CONSISTS OF: The general description below is...
canonical: https://matchawards.com/dept_of_the_army/posts/113924232300596400
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton,… | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/113924232300596400
og:description: Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton, MA. United States Department of the Army. Solicitation W912WJ25Q0038. NAICS 238320 - Painting and Wall Covering Contractors. Total small business set-aside. Deadline 2025-03-13. THE WORK CONSISTS OF: The general description below is...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton, MA

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

CONCORD, USA

Notice type

Presolicitation

Solicitation number

W912WJ25Q0038

NAICS

[238320 - Painting and Wall Covering Contractors](/groups/231)

PSC

Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2025-03-10

Deadline

2025-03-13

## Description

THE WORK CONSISTS OF: The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under this Scope of Work. In general, the Base Scope of the project is to remove paint from all surfaces of concrete inside the Access and Operating Galleries. Remove all paintings/coatings down to bare concrete at North Access and Operating Galleries floor, walls and ceilings. Exception: Operating Gallery wall recess containing Operation panels and controls. Pressure inject and seal one actively leaking wall crack at South Access Gallery. Note: Concrete surfaces in South Gallery is currently not painted, thus excluded from paint removal and sealer/hardener work. After paint removal, clean all previously painted surfaces of dirt, debris, and other deleterious substances, then apply two coats of penetrating sealer/hardener to stabilize and minimize future dusting. Metal surfaces embedded or part of the affected surfaces may contain a reportable level of lead compound. These surfaces shall receive surface preparation as called out in Technical Specification 09 97 02 then coated with epoxy primer/sealer and overcoat with color matching previously painted colors. Note: Floor drain grate and frame at South Access Gallery shall also be cleaned and recoated.2\. Optional scope of the project is removal of paint on all concrete surfaces (ceiling, walls and floor) located at the Lower Basement of the Control House (El 500.08). Overall, condition of the painted surfaces varies from fair/good, well adhered to surface, to poor showing various degree of peeling or missing altogether. Surfaces were painted pre-1994\. While paint material is unknown at this time, it has been tested and found to be lead free, except on metal handrail showing a reportable level of lead. Proper disposal of lead containing debris shall be exercised. See testing results dated April 2024 in APPENDIX D. Graphical representation of the work area is shown in APPENDIX A. Contractor access and staging area as shown in APPENDIX B. Representative As-Built drawings for the structure are shown in APPENDIX C. Additional As-Built drawings are available upon request. Prior to commencement of any removal or cleaning work, all dam operation equipment, controls and accessories shall be securely protected to preclude any dust and debris from the construction. Mask all items that will not be painted to protect them from construction work. Paint removal means and methods shall be selected by the Contractor that will best remove the existing paint from the concrete surfaces and will not damage the existing concrete surfaces. Removal approach shall be presented in sufficient detail in the Work Plan to allow review and approval by the Government. Any damages to existing concrete while performing the work shall be repaired by the Contractor. Submit repair approach and materials to the Government for review and approval. All non-concrete surfaces called out to be repainted shall receive surface preparation for repainting. Mask all adjacent areas from repainting operation. Apply sealer and overcoat with color matching existing paint color(s) that have been removed. Active work area shall have proper containment to preclude construction dust and debris from migrating into other areas of the structure. Provide adequate means of air borne dust removal including supplemental ventilation within the work area for worker protection. Dust removal means shall contain adequate filtration to preclude discharge of dust laden air into the environment. All drains within the work area shall be securely blocked during work to preclude construction debris from entering the drains. As noted above, these drains directly discharge into the stream below the dam. All solid and sludge debris from construction shall be properly removed from the work area and legally disposed offsite. Crack repair: Actively leaking crack located in the West wall of the South Access Gallery shall be repaired by pressure injection to stop the leak. Clean all surfaces from efflorescence built up and other deleterious matters. Drill and install sufficient amount of pressure injection ports either side of the crack. Pressure inject epoxy in accordance with the manufacturers recommendations. Repeat process as necessary for proper seal. Upon confirmation that all leaks have been arrested, remove all injection ports and plug holes with grout closely matching in color with wall surface. Scrape all excess grout/epoxy and sand smooth surfaces around work area to a smooth and neat appearance. Clean all concrete surfaces by low pressure wash or other means in preparation of application of penetrating sealer/hardener. Dry surfaces, with supplemental heat as necessary, until maximum moisture content as recommended by sealer/hardener manufacturer have been achieved and validated by testing. Apply two coats of sealer/hardener in uniform fashion following manufacturers recommendation on lapse time between applications. Note: Concrete surfaces at South Gallery shall be cleaned only. Application of penetrating sealer/hardener is not required at this Gallery. Restore all areas affected by construction to a clean and sound operating condition. All masking, covering and debris shall be removed and properly disposed of. The magnitude of construction is between $100,000 and $250,000\. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238320 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. 

<!-- mobian-agent-ad sponsored="true" id="552435ac-d71b-4301-a92d-b7a6a8ed6f10" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/075d76cd63da45ceaa6e21367d73b64c/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/25a64330656d4e4b93dfd505f05f93a3/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/73ef0e96c315444290510a461225ff98/download)
* [Attachment 4](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8aba73d728604bc381401cdb3580b071/download)
* [Attachment 5](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c5c81339005249bda99326ec09fa1d94/download)
* [Attachment 6](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/daa5fc6f892e487ba3988d641b59ae5b/download)
* [Attachment 7](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ff822ea08fb84394a35e5e8f30db8ef9/download)

[Source notice](https://sam.gov/opp/8f6751a72c7f44f888af2238a03a46d5/view)

[More from United States Department of the Army posted in January 2025](/dept%5Fof%5Fthe%5Farmy/archive/2025-01)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Spillway Dam Gallery Paint Removal, Buffumville Lake, Charlton, MA","description":"THE WORK CONSISTS OF: The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under this Scope of Work. In general, the Base Scope of the project is to remove paint from all surfaces of concrete inside the Access and Operating Galleries. Remove all paintings/coatings down to bare concrete at North Access and Operating Galleries floor, walls and ceilings. Exception: Operating Gallery wall recess containing Operation panels and controls. Pressure inject and seal one actively leaking wall crack at South Access Gallery. Note: Concrete surfaces in South Gallery is currently not painted, thus excluded from paint removal and sealer/hardener work. After paint removal, clean all previously painted surfaces of dirt, debris, and other deleterious substances, then apply two coats of penetrating sealer/hardener to stabilize and minimize future dusting. Metal surfaces embedded or part of the affected surfaces may contain a reportable level of lead compound. These surfaces shall receive surface preparation as called out in Technical Specification 09 97 02 then coated with epoxy primer/sealer and overcoat with color matching previously painted colors. Note: Floor drain grate and frame at South Access Gallery shall also be cleaned and recoated.2. Optional scope of the project is removal of paint on all concrete surfaces (ceiling, walls and floor) located at the Lower Basement of the Control House (El 500.08). Overall, condition of the painted surfaces varies from fair/good, well adhered to surface, to poor showing various degree of peeling or missing altogether. Surfaces were painted pre-1994. While paint material is unknown at this time, it has been tested and found to be lead free, except on metal handrail showing a reportable level of lead. Proper disposal of lead containing debris shall be exercised. See testing results dated April 2024 in APPENDIX D. Graphical representation of the work area is shown in APPENDIX A. Contractor access and staging area as shown in APPENDIX B. Representative As-Built drawings for the structure are shown in APPENDIX C. Additional As-Built drawings are available upon request. Prior to commencement of any removal or cleaning work, all dam operation equipment, controls and accessories shall be securely protected to preclude any dust and debris from the construction. Mask all items that will not be painted to protect them from construction work. Paint removal means and methods shall be selected by the Contractor that will best remove the existing paint from the concrete surfaces and will not damage the existing concrete surfaces. Removal approach shall be presented in sufficient detail in the Work Plan to allow review and approval by the Government. Any damages to existing concrete while performing the work shall be repaired by the Contractor. Submit repair approach and materials to the Government for review and approval. All non-concrete surfaces called out to be repainted shall receive surface preparation for repainting. Mask all adjacent areas from repainting operation. Apply sealer and overcoat with color matching existing paint color(s) that have been removed. Active work area shall have proper containment to preclude construction dust and debris from migrating into other areas of the structure. Provide adequate means of air borne dust removal including supplemental ventilation within the work area for worker protection. Dust removal means shall contain adequate filtration to preclude discharge of dust laden air into the environment. All drains within the work area shall be securely blocked during work to preclude construction debris from entering the drains. As noted above, these drains directly discharge into the stream below the dam. All solid and sludge debris from construction shall be properly removed from the work area and legally disposed offsite. Crack repair: Actively leaking crack located in the West wall of the South Access Gallery shall be repaired by pressure injection to stop the leak. Clean all surfaces from efflorescence built up and other deleterious matters. Drill and install sufficient amount of pressure injection ports either side of the crack. Pressure inject epoxy in accordance with the manufacturers recommendations. Repeat process as necessary for proper seal. Upon confirmation that all leaks have been arrested, remove all injection ports and plug holes with grout closely matching in color with wall surface. Scrape all excess grout/epoxy and sand smooth surfaces around work area to a smooth and neat appearance. Clean all concrete surfaces by low pressure wash or other means in preparation of application of penetrating sealer/hardener. Dry surfaces, with supplemental heat as necessary, until maximum moisture content as recommended by sealer/hardener manufacturer have been achieved and validated by testing. Apply two coats of sealer/hardener in uniform fashion following manufacturers...","url":"https://matchawards.com/dept_of_the_army/posts/113924232300596400","identifier":"W912WJ25Q0038","category":"238320 - Painting and Wall Covering Contractors","additionalProperty":[{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2025-03-10","availabilityEnds":"2025-03-13","sameAs":"https://sam.gov/opp/8f6751a72c7f44f888af2238a03a46d5/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

