<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_army/posts/113827501137444227" -->

---
title: Follow-up Sources Sought - Construction of Power Independence… | Closed - MatchAwards
description: Follow-up Sources Sought - Construction of Power Independence Mission Control Station, Buckley Space Force Base, Colorado. United States Department of the Army. Solicitation W9128FSM018. NAICS 237990 - Other Heavy and Civil Engineering Construction. Deadline 2025-01-30. This is a follow-up notice...
canonical: https://matchawards.com/dept_of_the_army/posts/113827501137444227
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Follow-up Sources Sought - Construction of Power Independence… | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/113827501137444227
og:description: Follow-up Sources Sought - Construction of Power Independence Mission Control Station, Buckley Space Force Base, Colorado. United States Department of the Army. Solicitation W9128FSM018. NAICS 237990 - Other Heavy and Civil Engineering Construction. Deadline 2025-01-30. This is a follow-up notice...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Follow-up Sources Sought - Construction of Power Independence Mission Control Station, Buckley Space Force Base, Colorado

Status

Closed, the response deadline passed on Jan 30, 2025

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

OMAHA, USA

Notice type

Special Notice

Solicitation number

W9128FSM018

NAICS

[237990 - Other Heavy and Civil Engineering Construction](/groups/218)

PSC

Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Posted

2025-03-04

Deadline

2025-01-30

Place of performance

Denver, Colorado 80014, UNITED STATES

## Description

**This is a follow-up notice to the previous Sources Sought Notice W9128F24SM017 posted 31 May 2024.**

THIS NOTICE IS FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID. NO SOLICITATION IS CURRENTLY AVAILABLE.

<!-- mobian-agent-ad sponsored="true" id="24042e3f-45f8-4462-bac1-8f7ed916619b" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


The U.S. Army Corps of Engineers, Omaha District is conducting market research to identify sources (Small Businesses and Other-than-Small Businesses) that have the knowledge, skills and capability to perform the work concerning the potential project described below. Responses are requested only from: POTENTIAL PRIME CONSTRUCTION CONTRACTORS WITH COMPANY BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $65M. The responses to this source sought announcement and the previously posted notice will be used by the Government to make appropriate acquisition decisions for this project. **Responses are to be sent via email to brandon.p.landis@usace.army.mil** and courtesy copy **brittany.c.gull@usace.army.mil no later than 2:00 p.m. CST, 30 January 2025\.** Questions or concerns surrounding small business matters can be sent to **cenwo-sb@usace.army.mil.** Please include the Sources Sought Notice Identification Number in the Subject line of any email submission.

**Magnitude of Construction:** Disclosure of the magnitude of construction, as prescribed in FAR 36.204 and DFARS 236.204, is between $25M and $100M. This project will be primarily funded with MILCON-appropriated dollars.

**Project Location and Description:**The upcoming solicitation of the Power Independence Mission Control Station (MCS) at Buckley Space Force Base (SFB), Colorado (CO) will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the Government with a complete facility and warranty based on the Request for Proposal (RFP). Construction will include all necessary facilities to provide utility and backup power to the Space-Based InfraRed Systems (SBIRS) mission at Buckley SFB, CO. Facilities to be constructed include a new power plant to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power, new transformers, medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in the existing powerplant building; and all associated support. Provide full load capability of 3.2MW after derating for operational and environmental factors with redundant capacity components to maintain the power resiliency required by the mission. The facility housing the generators will be structural steel columns or concrete masonry unit. The facility will also include a generator readiness support space, switchgear, and building auxiliary loads. Facility construction, electrical topology, and other ancillary capacity component supporting systems will provide compartmentalization, redundancy, concurrent maintainability, and automation features to isolate faults and systems to ensure the full required load capacity is maintained with respect to all facilities required to satisfy the Uptime Institute Tier IV principles and its associated sustainment duration length requirements and other governing Unified Facilities Criteria (UFCs). The facilities required to support the overall mission sustainment duration length (that is, the bulk fuel farm and distribution to deliver fuel to the portion of the system meeting  
Uptime Institute Tier IV principles) will be constructed in an arrangement using the principles of Uptime Institute Tier III for concurrent maintainability and other governing Unified Facilities Criteria (UFCs). This requirement also includes construction of new transformers to supply the SBIRS building from the new power plant at a different medium voltage service than that from which the existing transformers are served; and providing redundant utility power distribution to the new powerplant, supplied from an Auto Throw-Over (ATO) device via agreement (or amendment to an existing agreement) with the utility provider. This will require the  
construction of associated site drainage, pavement, and equipment for a new fuel offloading depot outside the restricted area. All other work will be performed within the Protection Level 1 (PL-1) perimeter away from the only Entry Control Facility and vehicular gate. The project will demolition of adjacent existing facilities. This project is authorized generators, per Air Force Manual (AFMAN) 32-1062, paragraph 3.1.14\. Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01\. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01 as required for the application and conditions.

**Project Period of Performance:**730 Calendar Days from construction notice to proceed (NTP).

**Project Labor Agreement Requirements:** Please note, this project may be subject to a project labor agreement as per Executive Order (E.O.) 14063\. A separate project labor agreement survey will be posted to SAM.gov to assist with the market research of this acquisition.

**Submission Details:** All interested, capable, qualified (under NAICS code 237990 – Other Heavy and Civil Engineering Construction) and responsive contractors are encouraged to reply to this market survey request. Interested PRIME CONTRACTORS ONLY should submit a narrative demonstrating their experience in construction projects of similar nature for each facility as described above. Narratives shall be no longer than 12 pages. E-mail responses are required.

Please include the following information in your response/narrative:

* Company name, address, and point of contact, with (h)is/her phone number and email address
* CAGE Code and DUNS Number
* Statement certifying business size such as WOSB, SDVOSB, etc. to include any official teaming arrangements as a partnership or joint venture
* Details of similar projects within the last 8 years and state whether you were the Prime or Subcontractor
* Start and end dates of construction work
* Project references (including owner with phone number and email address)
* Project cost, term, and complexity of job
* Information on your bonding capability - SPECIFICALLY IDENTIFY PERFORMANCE AND PAYMENT BONDS CAPACITIES
* Details on similar projects with scope and complexity should identify experience with the following within the past 8 years.
* Construction of power plants or similar to include associated site features, utilities, and infrastructure.
* Construction of backup power type complex.
* Construction of facilities on a DoD Military Installation.
* Construction of UFC 1-200-01, Building Code General Requirements
* Construction of 1-200-02 High Performance and Sustainable Building Requirements
* Abatement and/or remediation of asbestos, lead based paint, and/or other hazardous materials.

Responses will be shared with Government personnel and the project management team on a need-to-know basis, but otherwise will be held in strict confidence.

PLEASE NOTE: AT THIS TIME, WE ARE ONLY INTERESTED IN RESPONSES FROM COMPANIES WHO HAVE THE ABILITY TO BE PRIME CONTRACTORS WITH BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $65M. ESTIMATED CONSTRUCTION CONTRACT AWARD WILL BE SECOND / THIRD QUARTER OF FISCAL YEAR 2025.

Telephone inquiries will NOT be accepted.

[Source notice](https://sam.gov/opp/c5ce4522f22f48eb90a8c9ac76ccb249/view)

[More from United States Department of the Army posted in January 2025](/dept%5Fof%5Fthe%5Farmy/archive/2025-01)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Construction Government Contracts Available Now](/contracts/construction)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Follow-up Sources Sought - Construction of Power Independence Mission Control Station, Buckley Space Force Base, Colorado","description":"This is a follow-up notice to the previous Sources Sought Notice W9128F24SM017 posted 31 May 2024. THIS NOTICE IS FOR MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID. NO SOLICITATION IS CURRENTLY AVAILABLE. The U.S. Army Corps of Engineers, Omaha District is conducting market research to identify sources (Small Businesses and Other-than-Small Businesses) that have the knowledge, skills and capability to perform the work concerning the potential project described below. Responses are requested only from: POTENTIAL PRIME CONSTRUCTION CONTRACTORS WITH COMPANY BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $65M. The responses to this source sought announcement and the previously posted notice will be used by the Government to make appropriate acquisition decisions for this project. Responses are to be sent via email to brandon.p.landis@usace.army.mil and courtesy copy brittany.c.gull@usace.army.mil no later than 2:00 p.m. CST, 30 January 2025. Questions or concerns surrounding small business matters can be sent to cenwo-sb@usace.army.mil. Please include the Sources Sought Notice Identification Number in the Subject line of any email submission. Magnitude of Construction: Disclosure of the magnitude of construction, as prescribed in FAR 36.204 and DFARS 236.204, is between $25M and $100M. This project will be primarily funded with MILCON-appropriated dollars. Project Location and Description: The upcoming solicitation of the Power Independence Mission Control Station (MCS) at Buckley Space Force Base (SFB), Colorado (CO) will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the Government with a complete facility and warranty based on the Request for Proposal (RFP). Construction will include all necessary facilities to provide utility and backup power to the Space-Based InfraRed Systems (SBIRS) mission at Buckley SFB, CO. Facilities to be constructed include a new power plant to house the backup generators and spaces for operational support; the backup generators; fuel storage and fuel offload facilities; commercial power, new transformers, medium voltage switches, manholes, and Underground Primary Distribution power lines; load bank connection and switching equipment; replicated powerplant controls in the existing powerplant building; and all associated support. Provide full load capability of 3.2MW after derating for operational and environmental factors with redundant capacity components to maintain the power resiliency required by the mission. The facility housing the generators will be structural steel columns or concrete masonry unit. The facility will also include a generator readiness support space, switchgear, and building auxiliary loads. Facility construction, electrical topology, and other ancillary capacity component supporting systems will provide compartmentalization, redundancy, concurrent maintainability, and automation features to isolate faults and systems to ensure the full required load capacity is maintained with respect to all facilities required to satisfy the Uptime Institute Tier IV principles and its associated sustainment duration length requirements and other governing Unified Facilities Criteria (UFCs). The facilities required to support the overall mission sustainment duration length (that is, the bulk fuel farm and distribution to deliver fuel to the portion of the system meeting Uptime Institute Tier IV principles) will be constructed in an arrangement using the principles of Uptime Institute Tier III for concurrent maintainability and other governing Unified Facilities Criteria (UFCs). This requirement also includes construction of new transformers to supply the SBIRS building from the new power plant at a different medium voltage service than that from which the existing transformers are served; and providing redundant utility power distribution to the new powerplant, supplied from an Auto Throw-Over (ATO) device via agreement (or amendment to an existing agreement) with the utility provider. This will require the construction of associated site drainage, pavement, and equipment for a new fuel offloading depot outside the restricted area. All other work will be performed within the Protection Level 1 (PL-1) perimeter away from the only Entry Control Facility and vehicular gate. The project will demolition of adjacent existing facilities. This project is authorized generators, per Air Force Manual (AFMAN) 32-1062, paragraph 3.1.14. Facility will be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01 as required for the application and conditions. Project Period of Performance: 730 Calendar Days from construction notice to proceed (NTP). Project Labor Agreement Requirements: Please...","url":"https://matchawards.com/dept_of_the_army/posts/113827501137444227","identifier":"W9128FSM018","category":"237990 - Other Heavy and Civil Engineering Construction","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2025-03-04","availabilityEnds":"2025-01-30","validThrough":"2025-01-30T23:59:59-05:00","areaServed":"Denver, Colorado 80014, UNITED STATES","sameAs":"https://sam.gov/opp/c5ce4522f22f48eb90a8c9ac76ccb249/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Construction","item":"https://matchawards.com/contracts/construction"}]}
```

