ClickCease Replace Boilers Bldg. 4607 – United States Department of the Army | Closed - MatchAwards

Replace Boilers Bldg. 4607

Status
Closed, the response deadline passed on Dec 17, 2024
Agency
United States Department of the Army
Office
MEMPHIS, USA
Notice type
Solicitation
Solicitation number
W50S9925B0001
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
PSC
J045 - MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
Category
Facility Related Services (4.4)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2024-11-05
Deadline
2024-12-17

Description

Funds are not presently available for this acquisition. The Government anticipates funds will become available prior to award as this action has been identified on the National Guard priority list. No contract award will be made until appropriated funds are made available. Award will be made to the responsible bidder w hose bid conforms to the invitation for bids and is most advantageous to the Government considering only price and price related factors. No contract award will be made until appropriated funds are made available. CONSTRUCTION CONTRACT for Project PYKL242011, Replace Boilers Bldg. 4607 at the 164th Airlift Wing, Memphis ANG Base, TN. Work shall be performed in accordance with (IAW) the Statement of Work (SOW). This project is a total small business set-aside. The North AmericanIndustry Classification System (NAICS) Code is 238220 and the Small Business Size Standard is: $19,000,000.00 in average annual receipts for the past three years. Construction project magnitude is between $100,000.00 and $250,000. Persons intending to submit a bid are strongly encouraged to attend the Pre-Bid Conference and Site Visit. See Section 00 21 00 for location and date.To provide all management, tools, equipment, transportation, supervision, and labor necessary to replace two boilers which includes replacement of two circulating pumps, two motor starters for the pumps, two flow switches, four isolation valves, replace insulation to match existing insulation, two solenoid valves, six temperatures gauges, five pressure gauges and ensure that the system maintains a 35% glycol mix at the Tennessee Air National Guard Base, Memphis, TN.

Source notice

More from United States Department of the Army posted in November 2024

More lists