FY25 Electric Vehicle Charging Facility on Red River Army Depot, Texas
- Status
- Closed, the response deadline passed on Nov 14, 2024
- Agency
- United States Department of the Army
- Office
- FORT WORTH, USA
- Notice type
- Sources Sought
- Solicitation number
- PANSWD24P0000003213
- NAICS
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
- PSC
- Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
- Category
- Construction Related Services (4.2)
- Posted
- 2024-11-01
- Deadline
- 2024-11-14
- Place of performance
- New Boston, Texas 75570, UNITED STATES
Description
This project will provide 22 charging hubs dispersed across Red River Army Depot (RRAD). These hubs will provide an aggregate of 50 Level 2 grid-tied chargers to serve a fleet of about 171 ZEVs. Electric Chargers must meet FedRamp Certification and be compatible with a Wex card for integration. The contractor will be responsible for the installation of EV chargers, utility connections, and trenching, and will coordinate with RRAD to complete commissioning requirements. RRAD will provide through a separate service contract the network plan & data package required to operate the selected EV Charger installed on-site.