Construct Redundant Electrical Supply, Buckley SFB, CO

Status
Closed, the response deadline passed on Sep 13, 2024
Agency
United States Department of the Army
Office
OMAHA, USA
Notice type
Solicitation
Solicitation number
W9128F24R0066
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Y1JZ - CONSTRUCTION OF MISCELLANEOUS BUILDINGS
Category
Construction Related Services (4.2)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2024-08-29
Deadline
2024-09-13

Description

An an estimated date of 17 July, 2024, this office will issue a solicitation for Construct Redundant Electrical Supply, Buckley Space Force Base, Colorado. Colorado. This solicitation will use trade-off source selection procedures under Best-value continuum.

Proposals will be tentatively due on 21 August 2024.

No amount is to be charged for solicitation documents.

This soclitation is a SMALL BUSINESS SET-ASIDE.

This project will be executed using a design-bid-build (DBB) project delivery method.

Estimate of the magnitude of this project is between $5M - $10M.

PROJECT DESCRIPTION: This project will replace end of life cable and switchgear considered to be at the end of their useful life and install a redundant, new backup commercial power feed of same capacity to the PL-1, which will improve resiliency by creating the redundancy mandated by Uptime Institute (UTI) Tier IV Standards in accordance with (IAW) Paragraph 12 of AFI 32-062, AFSPC Supplement. This project will also eliminate several existing high risks, single points of failure, any one of which may cause lengthy risk to mission reliability. Listed below are goals for the project:

  1. Install a new external ATO feed line for the Replacement and Redundant feeder line to connect to inside the PL-1 area. Will need to source work with local power utility (XCEL).
  2. Replace the primary power feed line inside the PL-1 area
  3. Provide new redundant power feed line to the PL-1 area.
  4. Provide new ATO-Type switchgear lineups
  5. Demolish the existing "igloo" switchgear area.
  6. Remove the existing primary power feed line inside the PL-1 area.