ClickCease PTAC AC/Heat Units (W912ES24Q0092) | Closed - MatchAwards

PTAC AC/Heat Units

Status
Closed, the response deadline passed on Jul 29, 2024
Agency
United States Department of the Army
Office
SAINT PAUL, USA
Notice type
Solicitation
Solicitation number
W912ES24Q0092
NAICS
333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
PSC
4120 - AIR CONDITIONING EQUIPMENT
Category
Facility Related Materials (4.3)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2024-07-26
Deadline
2024-07-29
Place of performance
Fountain City, Wisconsin 54629, UNITED STATES

Description

The contractor shall supply ten (10) 9,000 BTU class Packaged Terminal Air Conditioner (PTAC) units. These units will be installed by USACE personnel on the Taggetz Quarters Barge. The units must include hydronic heating capability, fit into the sleeves already installed, be compatible with existing wired thermostats, and have corrosion resistant grills. Units must brand new, 230/208 volt, 1 phase, 15 Amp max draw, and include 15 Amp plugs. These units must be “plug and play,” not requiring electrical wiring, changes to plumbing, or replacement of external sleeves. The units are to be installed (by USACE) in the crew quarters, to replace Amana model PTC073B00HJ and PTC093B00HJ units that have failed. These PTAC units are installed in sleeves with a rough opening of 16.25” x 43.25”. The units must have hydronic heating kits installed, which regulate the flow of water from a central boiler to control heat. The proposed units should be the same as Amana PTC093J or PTC093K units, or equal, in terms of fit and function. The contractor shall supply ten (10) 9,000 BTU class Packaged Terminal Air Conditioner (PTAC) units. These units will be installed by USACE personnel on the Taggetz Quarters Barge. The units must include hydronic heating capability, fit into the sleeves already installed, be compatible with existing wired thermostats, and have corrosion resistant grills. Units must brand new, 230/208 volt, 1 phase, 15 Amp max draw, and include 15 Amp plugs. These units must be “plug and play,” not requiring electrical wiring, changes to plumbing, or replacement of external sleeves. The units are to be installed (by USACE) in the crew quarters, to replace Amana model PTC073B00HJ and PTC093B00HJ units that have failed. These PTAC units are installed in sleeves with a rough opening of 16.25” x 43.25”. The units must have hydronic heating kits installed, which regulate the flow of water from a central boiler to control heat. The proposed units should be the same as Amana PTC093J or PTC093K units, or equal, in terms of fit and function.

Attachments

Source notice

More from United States Department of the Army posted in July 2024

More lists