Big Bend Powerhouse Elevator No. 2 Rehab
- Status
- Closed, the response deadline passed on Aug 8, 2024
- Agency
- United States Department of the Army
- Office
- OMAHA, USA
- Notice type
- Solicitation
- Solicitation number
- W9128F24R0023
- NAICS
- 238290 - Other Building Equipment Contractors
- PSC
- Z2MZ - REPAIR OR ALTERATION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2024-07-26
- Deadline
- 2024-08-08
- Place of performance
- Fort Thompson, South Dakota 57339, UNITED STATES
Description
Work will include demolition and replacement of various items including but not limited to elevator equipment, controls, hoist mechanism, hoisting system, and incidental related work. This will include bringing the elevator system up to code to the greatest extent possible. The existing elevator cab and the five existing elevator landing doors will be reused, while the existing elevator door on the cab will be replaced. The machine room and elevator shaft need to be separately enclosed with a 2-hour fire rated wall.
For potential hazardous work there is lead and there is the presence of asbestos/asbestos dust in the wiring, possibly in the machine room door, elevator brake shoes, rough black coating on the outside of the car, and mats hanging on the inside of the car. The interior doors of the elevator tested positive for lead primer via a 3M Instant Test kit.
Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
- Attachment 16
- Attachment 17
- Attachment 18
- Attachment 19
- Attachment 20
More from United States Department of the Army posted in July 2024