REQUEST FOR INFORMATION - Hybrid-Electric VTOL Technology

Status
Closed, the response deadline passed on Aug 30, 2024
Agency
United States Department of the Army
Office
FORT EUSTIS, USA
Notice type
Special Notice
Solicitation number
W911W6-24-RFI-0005
NAICS
541715 - Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
PSC
AC12 - NATIONAL DEFENSE R&D SERVICES; DEPARTMENT OF DEFENSE - MILITARY; APPLIED RESEARCH
Posted
2024-07-16
Deadline
2024-08-30
Place of performance
Fort Eustis, Virginia 23604, UNITED STATES

Description

This is a request for information (RFI) only. The intent is to inform a request for proposal (RFP) for a Research, Development, Test and Evaluation (RDT&E)-funded, 6.3 technology demonstration effort. It provides insight to the technical subjects of interest, what information may be requested in a future solicitation, and ideas on how technical solutions may be assessed. Proposals are not desired, rather the Army requests feedback on all aspects of the following to inform a future solicitation release. Specific feedback items are requested at the end of this RFI. While this is a good-faith information request initiated with the intent to inform a follow-on solicitation, this RFI does not obligate the Government with respect to a future RFP, approach, or funded project.  This effort does not address a specific requirement and will not necessarily lead to generation of a new requirement. 

Introduction

The Army DEVCOM Aviation and Missile Center (AvMC) is developing a plan to conduct an RDT&E-funded (6.3) science and technology (S&T) demonstration of critical technologies that enable hybrid-electric vertical and very short take-off and landing (VTOL & STOL) aircraft systems.

The Army Aviation Science and Technology enterprise continuously seeks improvements to its fleet of rotorcraft in terms of cost, performance, safety, survivability, lethality, and mission effectiveness. Occasionally, new technologies emerge that provide warfighters with new or additional tools to conduct operations more efficiently and effectively.  New technologies often require an investment of resources for stakeholders to understand how they work, how they are implemented, what are the likely use cases, and how they might fit into future concepts of operation.

Electric, more-electric, and hybrid propulsion technologies for aircraft are being investigated and developed by many segments of industry, including large and small, new and established, non-DoD-affiliated and traditional defense contractor companies. Tremendous gains in individual components and system designs have brought the advanced air mobility industry to the cusp of success.  For the Army, many questions remain about the viability of these systems for military missions. Internal analysis based on best available knowledge has shown specific power and energy limitations may present mission performance challenges. Battery-electric-only systems limit mission flexibility (range, payload, sortie availability) and require additional ground charging equipment and time.  Hybrid systems may provide advantages, however due to the number of variables and large design space, a high level of expertise is required to properly optimize a system that shows mission benefits. Large rotor helicopters were co-developed with turboshaft engines and mechanical transmissions over the last nearly 70 years. Deep understanding and sophisticated analysis are needed to determine if and how hybrid propulsion technologies can be used to advantage in those designs.

Although there are logistics and policy concerns associated with some alternative fuel sources, those issues are not the focus of this RFI or potential subsequent effort.

Aircraft Demonstration Interest

The primary motivations to conduct this technology demonstration effort are to:

There are multiple attributes of interest potentially offered by more-electric technology. Some notable examples are reduced fuel consumption, affordability (procure, operate, maintain), and potential operational advantages (e.g. silent approach, high speed cruise w/ low speed loiter, etc.). While cost and performance are primary attributes, military use cases require consideration of additional characteristics. Other important attributes include safety, reliability, crashworthiness, airworthiness and certification requirements, electromagnetic interference, cyber security, and signature management.

For purposes of this RFI, a hybrid-electric aircraft is defined as one that has a propulsive system that combines multiple elements of energy storage; power production; and or thrust production that may be used simultaneously or separately, either independently or cooperatively. The hybrid propulsion system may contain combinations of primary power batteries, fuel cells, internal combustion engines, mechanical transmissions, electric machines, power electronics, electrical power distribution components, power management systems, and thermal management systems. Supplemental technologies that take advantage of onboard electric power generation, such as electric actuation or advanced mission systems, may be included. This definition is provided as a means of conveying intent and openness to different technical solutions.  It is not meant to be overly constraining or to hinder innovation.

Along with the demonstration of technologies, the Army also desires an objective aircraft design as the basis for enabling technology evaluation and to help inform capability developers and program managers. To capture the expertise and creativity of a wide section of industry, the Army will consider designs that apply hybrid-electric technology and align with any of the general mission descriptions below:

[Note: These mission descriptions do not reflect specific requirements. They are meant to explore applicability of hybrid-electric technology and indicate areas of interest. All values provided in the descriptions are approximate.]

  1. A militarized, autonomous, hybrid-electric VTOL or VSTOL aircraft capable of frequent and routine logistics movement of supplies with a payload capacity of 1200-2000 lbs. with an un-refueled/recharged combat radius of 130 n. mi. Secondary missions, such as launched effects deployment and casualty evacuation may be considered.
  2. A small helicopter (4000-5000 lbs. TOGW) capable of extended, precision hover that can carry 1200+ lbs. payload 200 n. mi. range at 180 kts.
  3. Medium-lift rotorcraft with measurable improvement in any of the following: range/payload capacity; operating and sustainment cost; fuel quantity use; or safety.  
  4. Group III or IV unmanned air vehicle using hybrid-electric technology to extend range and endurance, or to provide good flight performance characteristics in multiple flight regimes (e.g. efficient at both high-speed flight and low-speed loiter).

For any of the above general cases, the following are examples of additional ideas considered of interest to the Army:

  1. Militarization considerations may include propulsion system sizing for quickness and agility; vehicle physical configuration and layout; austere environments and harsh environmental conditions; low flight above the ground near clutter and trees; survivability (damage tolerance, redundancy, separation) and signature management; cyber security; reliability; and limited required logistics support.
  2. Hybridization through auxiliary power kits (internal or external) for the systems above to provide range extension or mission performance-enhancing power.
  3. Special applications which take advantage of hybrid aircraft’s unique characteristics. For example, the excess peak/sustained electrical power available on these systems may enable flight systems capable of fielding high powered microwave (HPM), directed energy DE, or other electromagnetic (EM) emissions concepts.

[Note: Values and descriptions may change based on on-going analysis.]

Ideally, demonstrations will be conducted at an aircraft system-level to show integration, interfaces, dependencies, synergies, and constraints of constituent component technologies in a realistic, workable system.  Ground and, or flight demonstrations are desired as project cost and outcomes are balanced.  Surrogates such as iron/copper birds or alternative aircraft (including piloted) may be used to demonstrate critical enabling technologies as necessary to provide evidence that the objective design is credible.

Technology Maturation:

                The primary focus of the RFI is technology demonstration in an integrated system. This implies a level of maturity for each technology component. In the fast-evolving area of hybrid VTOL aircraft, there may be promising individual technologies that require further development before they are suitable for an aircraft system-level demonstrations.  Supporting component development, complimentary studies, and research in the hybrid electric area may be considered in parallel with the demonstration efforts.

Digital engineering guidance:

Digital engineering is a value-added process and will aid technology transition of this effort.  Model Based Systems Engineering (MBSE) provides a digital dataset can be directly applied to future requirements as they are informed by this effort. The degree of MBSE and other digital tools should be “right-sized” for this demonstration project. The intent is to streamline physical processes, minimize trial-and-error iterations, validate the degree to which design requirements are met, and facilitate technology transition. Testing should be used to develop data to calibrate and validate analyses, to fill in gaps where analysis is not effective, or to streamline data development where analysis would be significantly slower or more costly.  MBSE is a useful tool that is encouraged but is not the focus of this effort. 

The following deliverables are envisioned:

Anticipated Funding & Schedule

For planning purposes, Army funding is inclusive of the years FY26-30, with approximately $5-$7 million per year. While available funding is significant, it may be insufficient to solely fund the design, fabrication and test of a new-build aircraft.  The Government is open to cost sharing/teaming opportunities with industry for technology demonstrations provided goals and schedules align, and data rights arrangements are suitable. The Government, however, does not intend to fund new test facilities under any future arrangements. Demonstration projects may start in FY26 and should complete no later than the end of FY30.

The following sections describe the types of information that will be requested in a subsequent RFP. Feedback is desired on the clarity and completeness of these sections.

Anticipated Proposal Content Description

An objective aircraft design provides a target for technology development and indicates a capability that could potentially be adapted to satisfy a future requirement. While demonstration of the full objective aircraft may be cost prohibitive and unnecessary, critical enabling technologies integrated into practical systems can be demonstrated.  A future RFP would ask for information about both the objective aircraft design and how the integrated, enabling technology demonstrations would be executed. For the objective aircraft concept:

For the technology demonstration(s):

A proposal should provide the Government with confidence that the project will be conducted effectively with likelihood of success. Some version of the following would be requested:

Along with confidence in the technical approach and programmatic controls, the following information can also provide confidence in the proposing team:

Cost will also be assessed. Discuss anticipated demonstration costs which substantiate a funding profile that identifies total project price and follows projected funding. Categories of interest:

Agreement Type:

Indicate what type of business arrangement is desired (FAR contract, Other Transaction Agreement (OTA), Technology Investment Agreement (TIA), etc.).

Performers:

        For this project, the Government encourages inclusion of small companies and non-traditional defense contractors in primary or at least significant roles.

Data Rights:

It is anticipated that Technical Data and Software developed under this Agreement should be delivered to the Government with Government Purpose Rights.  Offerors may include a summary of any assertions of Offeror restrictions on Government use of any technical data or computer software with proper justification. 

Other Considerations:

While this document was intended to communicate Army intent and interests, it is not exhaustive or overly specific. Derived requirements or assumptions that shape any future proposal in a significant way should be highlighted.

Notional Evaluation Criteria Description

Criteria:

The following factors are anticipated to be important in proposal evaluations:

Selection Note:

The future request for proposal opens the aperture to a wide range of technical solutions. As such, there is no single technical definition of success against which to measure proposals. Due to the range of potential responses, the Army reserves the flexibility to select work of the most interest, from credible sources, based on science and technology (S&T) value and data needs which may evolve over time.  The Army also reserves the right to fund multiple or a single effort, and to enter the design, fabricate, test and demonstrate cycle at any phase. However, top level funding is fixed, therefore these decisions will be guided by the proposals received, balancing S&T value and available resources.  Non-selection will not necessarily imply any deficiency in the proposal.

Conclusion

Information and feedback related to the topics discussed within the RFI is requested. Communication exchanges with market participants can add significant value to and create efficiencies in solicitation development