Chemical Resistant Epoxy Repair/Recoat of Floors and Walls
- Status
- Closed, the response deadline passed on Aug 8, 2024
- Agency
- United States Department of the Army
- Office
- ABER PROV GRD, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- W91ZLK-24-R-0020
- NAICS
- 238190 - Other Foundation, Structure, and Building Exterior Contractors
- PSC
- Z2DB - REPAIR OR ALTERATION OF LABORATORIES AND CLINICS
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2024-07-11
- Deadline
- 2024-08-08
- Place of performance
- Aberdeen Proving Ground, Maryland 21005, UNITED STATES
Description
SYNOPSIS/SOLICITATION
W91ZLK-24-R-0020
This combined synopsis/solicitation is for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. Incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2024-05 (22 APR 2024). The solicitation number for this request for proposal (RFP) is W91ZLK-24-R-0020.
This requirement is under the associated North American Industry Classification System (NAICS) Code 238190 – Other Foundation, Structure, and Building Exterior Contractors. The Government contemplates award of a Purchase Order on a firm-fixed price (FFP) basis as a 100% Small Business Set-Aside in accordance with FAR 13, Simplified Acquisition Procedures. The period of performance is within (3) months from the date of award for the base requirement and (12) months for the option requirements. This procurement will be evaluated as Lowest Price Technically Acceptable, for the procurement of the following services.
The Repair and Recoat of Floors and Walls with Chemical Resistant Epoxy (See Attachment 2 – Performance Work Statement).
Award will be made to the Offeror whose response to the Combined Synopsis/Solicitation represents the best value to the Government. Proposals will be evaluated in accordance with the Lowest Price Technically Acceptable (LPTA) Source Selection process described in FAR 15.101-2.
All questions must be submitted via email to terrijuana.p.veals.civ@army.mil by Wednesday, July 17, 2024 at 10am Eastern Time. SUBJECT LINE: W91ZLK-24-R-0020 Q&A for Combined Synopsis/Solicitation FROM (INSERT COMPANY NAME).
Firm Fixed Price (FFP) proposals must be signed, dated, and received by Thursday, August 8, 2024 at 10am Eastern Time. SUBJECT LINE: W91ZLK-24-R-0020 Proposal FROM (INSERT COMPANY NAME). All additional questions will be answered via an amendment to the Combined Synopsis/Solicitation on www.SAM.gov.
The Contractor, as an independent party and not an agent of the Government, shall provide The Repair and Recoat of Floors and Walls with Chemical Resistant Epoxy of the Chemical Transfer Facility (CTF) sump area, secondary holding tank area, and select laboratories and storage rooms to ensure containment of any hazardous or aggressive chemicals, should there ever be a leak in the system.
Business hours are 7:00AM – 5:00PM Eastern Standard Time, Monday through Friday, excluding federal holidays. All work to be performed will be inspected for compliance with performance requirements by the Contracting Officer’s Representative (COR).
SUBMISSION PROCEDURES FOR PROPOSAL:
52.212-1 Instruction to Offerors Commercial Items
This clause applies in its entirety and there are currently no addenda to the provision.
NO QUESTIONS FOR THE COMBINED SYNOPSIS/SOLICITATION WILL BE ACCEPTED VIA PHONE CALLS.
All proposals from responsible sources will be considered. Offerors who are not registered in the System for Award Management (SAM) database at the time of proposal will not be considered. Offerors may register with SAM by calling 1-866-606-8220 or online at www.SAM.gov.
Ofterors are cautioned to ensure that their proposals contain all necessary information and are complete in all respects as the Government does not intend to conduct discussions; therefore, proposals shall represent the best and final offer of the Contractor.
- Proposals shall be submitted in two (2) separate volumes labeled:
-
- Volume I: Epoxy Services W91ZLK-24-R-0020 TECHNICAL Proposal
- Volume II: Epoxy Services W91ZLK-24-R-0020 PRICE Proposal
- Formatting.
- Single space Text
- Double Space Paragraphs
- 12-point minimum font size.
- Arial or New Times Roman fonts only. Table/illustrations 8-point min and landscape is acceptable.
- Margins: All Margins 1 inch.
- Gutter: 0 inches
- Header and Footer 1.5 inches
- Page Size: Width 8.5 inches and Height 11 inches (11 X 17 folded pages are acceptable for tables/graphic representations; however, each 11 X 17 page counts as two pages)
- Page Limitations: Volume I Technical – 5 pages limit and Volume II Price – unlimited pages.
- Plain Text Proposals(, i.e., no identifying graphics, logo, watermarks, etc.)
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
-
- Restrictions: All information shall be confined to the appropriate volume. The Offeror shall confine submissions to essential matters and sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked. The following shall be included in the volumes:
- Volume I: Detail Technical Proposal shall be evaluated based on the following factors:
a. Factor 1 - Technical Approach: The offeror’s proposal shall adequately describe and present a clear understanding of the requirements specified in the Performance Work Statement (PWS). To be rated as acceptable, offerors must provide documentation that demonstrates the offeror’s approach for meeting all of the requirements specified in the PWS.
b. Factor 2 - Experience: Contractor shall demonstrate the ability to repair and recoat the floors and walls with chemical resistant epoxy for the CTF sump area, secondary holding tank area, and select laboratories and storage rooms to ensure containment of any hazardous or aggressive chemicals, should there ever be a leak in the system as specified in the PWS. To be rated as acceptable, the offeror must provide documentation to demonstrate recent experience repairing and recoating floors and walls with chemical resistant epoxy according to the PWS. Recent experience includes epoxy services performed within five (5) years (i.e. previous Government contracts).
BASIS FOR AWARD:
The award will be made to one responsible offeror whose proposal is determined to be technically acceptable, and lowest priced. To receive consideration for an award, an “Acceptable” rating must be achieved for all the non-cost evaluation factors: Technical Approach and Experience. Price will be evaluated in accordance with FAR 15.404-1 Proposal analysis techniques. Price will be the determining factor for proposals rated as acceptable for the non-cost factors. Price analysis using one or more methods listed under FAR 15.404-1(b) will be used to ensure that the proposal will result in a fair and reasonable price.
- Volume II: Detailed Price Proposal to include the following elements:
-
- Header Page Company Name, DUNS, CAGE, Business Type/Size, ETN# and point of contact information to include: Name, title, email address, and telephone number including extension.
-
- INCLUDE ALL Information Below (An excel attachment will be provided to submit as a part of Volume II):
CLIN
Requirement
Epoxy Flooring
Area
*No aggressive chemical resistance
Description
QTY: 1
Price
Total
Price
FFP
Additional
Details
CLIN 0001
Base
SRF Room 149
Approx. 1,000 sq. ft.
1
$ -
CLIN 0002
Option #1
SRF Foyer to Room 149
Approx. 96 sq. ft.
1
$ -
Incl. approx. 15 sq. ft. of Safety Yellow
CLIN 0003
Option #2
SRF Foyer to Room 167
Approx. 23 sq. ft.
1
$ -
CLIN 0004
Option #3
SRF Room 167
Approx. 789 sq. ft.
1
$ -
Incl. approx. 70 sq. ft. of Safety Yellow
CLIN 0005
Option #4
SRF Room 157
Approx. 86 sq. ft.
1
$ -
Incl. approx. 35 sq. ft. of Safety Yellow
CLIN 0006
Option #5
SRF Room 166
Approx. 472 sq. ft.
1
$ -
CLIN 0007
Option #6
SRF Room 137
Approx. 1743 sq. ft.
1
$ -
Incl. approx. 208 sq. ft. of Safety Yellow
CLIN 0008
Option #7
SRF Hallway
Approx. 2069 sq. ft.
1
$ -
CLIN 0009
Option #8
SRF Room 165
Approx. 515 sq. ft.
1
$ -
CLIN 0010
Option #9
SRF Bathroom Hallway*
Approx. 358 sq. ft.
1
$ -
CLIN 0011
Option #10
SRF Bathroom*
Approx. 267 sq. ft.
1
$ -
CLIN 0012
Option #11
CTF Room 1
Approx. 200 sq. ft.
1
$ -
Existing berms, spill containment troughs, and/or spill containment side-coves expected to remain berms, spill containment troughs, and/or spill containment side-coves with epoxy services
CLIN 0013
Option #12
CTF Room 4
Approx. 200 sq. ft.
1
$ -
CLIN 0014
Option #13
CTF Room 5
Approx. 200 sq. ft.
1
$ -
CLIN 0015
Option #14
CTF Room 6
Approx. 200 sq. ft.
1
$ -
CLIN 0016
Option #15
CTF Room 7
Approx. 200 sq. ft.
1
$ -
CLIN 0017
Option #16
CTF Room 8
Approx. 200 sq. ft.
1
$ -
CLIN 0018
Option #17
CTF Room 12
Approx. 200 sq. ft.
1
$ -
CLIN 0019
Option #18
CTF Room 13
Approx. 200 sq. ft.
1
$ -
CLIN 0020
Option #19
CTF Room 22
Approx. 235 sq. ft.
1
$ -
CLIN 0021
Option #20
CTF Room 23
Approx. 200 sq. ft.
1
$ -
CLIN 0022
Option #21
CTF Room 24*
Approx. 90 sq. ft.
1
$ -
CLIN 0023
Option #22
CTF Room 27
Approx. 400 sq. ft.
1
$ -
CLIN 0024
Option #23
CTF Room 30
Approx. 300 sq. ft.
1
$ -
CLIN 0025
Option #24
CTF Room 32
Approx. 300 sq. ft.
1
$ -
CLIN 0026
Option #25
CTF Walkin- Freezers
Approx. 251 sq. ft.
1
$ -
CLIN 0027
Option #26
CTF Locker Room #20
Approx. 84 sq. ft.
1
$ -
CLIN 0028
Option #27
CTF Locker Room #21
Approx. 200 sq. ft.
1
$ -
CLIN 0029
Option #28
CTF Bathroom #17
Approx. 80 sq. ft.
1
$ -
CLIN 0030
Option #29
CTF Mechanical Room
Approx. 1447 sq. ft.
1
$ -
CLIN 0031
Option #30
CTF Operational Hallway
Approx. 2175 sq. ft.
1
$ -
CLIN 0032
Option #31
CTF Office Hallway
Approx. 197 sq. ft.
1
$ -
Incl. approx. 300 CI of expansion joint
LIST OF ATTACHMENTS:
PROVISIONS/CLAUSES: See Attachment 1 – Provisions/Clauses
PERFORMANCE WORK STATEMENT: See Attachment 2 – Performance Work Statement
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP): See Attachment 3 – Quality Assurance Surveillance Plan
PRICE LIST: See Attachment 4 – Price List (Use for Volume II – Detailed Price Proposal)
Attachments
More from United States Department of the Army posted in July 2024