Maintenance Dredging of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project
- Status
- Closed, the response deadline passed on May 23, 2024
- Agency
- United States Department of the Army
- Office
- NEW YORK, USA
- Notice type
- Solicitation
- Solicitation number
- W912DS24B0003
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Y1KF - CONSTRUCTION OF DREDGING FACILITIES
- Category
- Construction Related Services (4.2)
- Posted
- 2024-05-20
- Deadline
- 2024-05-23
- Place of performance
- New York, UNITED STATES
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging and beach nourishment of Fire Island Inlet and Shores Westerly to Jones Inlet Beach Erosion Control and Navigation Project, New York. The work consists of dredging the Fire Island Inlet Federal Navigation channel and deposition basin with subsequent placement of the dredged sand as nourishment along the designated feeder beach (Gilgo Beach, Suffolk County, New York). The proposed dredging and beach nourishment work would involve dredging and placement of approximately 700,000 to 1,000,000 CY of sand at Gilgo Beach, subject to available funding. The project is scheduled to be dredged to a depth of 14 feet plus 2 feet allowable over-depth. The purpose of the proposed work is to alleviate the effects of shoaling and maintain the project dimensions, thereby providing safe and economical use of the Fire Island Inlet waterway by commercial and recreational boating interests while providing beneficial use of the dredged sand. Between maintenance operations, the bypassed sand placed at the feeder beach would be carried by littoral drift to feed down drift beaches. The maintenance operation would thus serve to place sand trapped in the channel back into the normal littoral movement that naturally replenishes the western beaches, while maintaining a safe channel for navigation. The proposed work can be accomplished by large pipeline dredge and must meet US Coast Guard criteria for an ocean going vessel. The Contractor will be required to commence work within five (5) calendar days after the date of receipt by him of the notice to proceed, and to prosecute said work diligently and to complete the basic work ready for use not later than ninety-seven (97) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 13,500 cubic yards per calendar day. The work is estimated to cost between $15,000,000 and $50,000,000. Plans and specifications for the subject project would be available in March 2024, with bid opening in April 2024. It is the intention of the government to award in May and NTP in first week of October 2024. Liquidated Damages of $2,390.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted Procurement.Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
- Attachment 16
- Attachment 17
- Attachment 18
- Attachment 19
- Attachment 20
- Attachment 21
- Attachment 22
- Attachment 23
- Attachment 24
- Attachment 25
More from United States Department of the Army posted in May 2024