ClickCease JB Chapel Rehabilitation (W912P924R0015) | Closed - MatchAwards

JB Chapel Rehabilitation

Status
Closed, the response deadline passed on Mar 22, 2024
Agency
United States Department of the Army
Office
SAINT LOUIS, USA
Notice type
Solicitation
Solicitation number
W912P924R0015
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Z2JZ - REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Category
Facility Related Services (4.4)
Set-aside
8(a) Sole Source (FAR 19.8)
Posted
2024-03-07
Deadline
2024-03-22
Place of performance
Saint Louis, 63125

Description

8(a) Sole Source Award to AACON General Contractors. Description of Work: In general, the work shall consist of the following: The Renovation and Rehabilitation of the Memorial Chapel at the Jefferson Barracks National Cemetary located in St. Louis, MO and related work including site work. The work includes replacement of the roof and roof drainage; replacement of roof skylight; replacement of siding; replacement of exterior doors with more historically appropriate materials; restoration of interior finishes; electrical work to include removal of outdated equipment and new work; installation of new HVAC system; renovation of bathrooms; limited site work including removal of astroturf. Specialty Work: Requires strict adherence to the Secretary of Interiors Standard for the Treatment of Historic Properties, specifically: . Standards for Preservation (https://www.nps.gov/tps/standards/four-treatments/treatmentpreservation. htm) . Treatment of Historic Properties (https://www.nps.gov/tps/standards.htm)

Source notice

More from United States Department of the Army posted in March 2024

More lists