Chesapeake Bay Oyster Recovery Program, Piankatank River, Virginia Phase 2 Reef Habitat
- Status
- Closed (archived notice)
- Agency
- United States Department of the Army
- Office
- NORFOLK, USA
- Notice type
- Solicitation
- Solicitation number
- W9123622B5014
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
- Category
- Construction Related Services (4.2)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2022-09-07
- Deadline
- 2022-09-01
Description
09/07/2022 - Posted Abstract of Offers. Amendment 0002 - 8/19/2022 This Amendment is issued to extend the bid closing by one day to Thursday, September 1, 2022 at 2:00pm EDT. As a result the Bid Opening will be extended by one day to Friday, September 2, 2022 at 2:00PM EDT. Amendment 0001 - 8/2 Adds 3 attachements Plans, Specs, and Solicitation. 8/3 incorporates PIEE link to Attachments/Links section of SAM announcement. The Norfolk District, Corps of Engineers will be issuing a solicitation for a 100% small business set-aside, firm fixed-price, Invitation for Bid (IFB) to complete the CHESAPEAKE BAY OYSTER RECOVERY PROGRAM, PIANKATANK RIVER REEF HABITAT PHASE II, PIANKATANK RIVER, VIRGINIA. The U.S. Army Corps of Engineers-Norfolk District in Partnership with the Virginia Marine Resources Commission will be issuing a contract for the Piankatank River, Phase 2-Reef Habitat Restoration Project. The Project is located near the mouth of the Piankatank River in Middlesex and Mathews Counties. The Project is obtaining, transporting and placing Class A-1 riprap via barge to the project site. All reef substrate will be placed by mechanical clamshell from a barge. and recorded by Clamvision to ensure proper placement and height. The reef will span across approximately 53 acres of Public Baylor Grounds, approximately 12-18 in height. Substrates will be placed in striations approximately 30 feet wide, spaced approximately 45 feet apart. The Base Bid consists of placement of reef structures on approximately 7.98 acres of the project site. Option 1 consist of placement of reef structures on additional 4.25 acres of the project site. Option 2 consists of the placement of reef structures on approximately 2.96 acres, and Option 3 includes the placement on approximately 3.36 acres. Reef substrate will be installed per the plan drawings and specifications on the project site in water depths ranging from approximately 0.96 MLLW to 0.10 MLWContacts
- Tracey Strawbridge
- Eartha Garrett
Email and phone are in the source notice.
More from United States Department of the Army posted in September 2022