ClickCease Chesapeake Bay Oyster Recovery Program, Piankatank River,… | Closed - MatchAwards

Chesapeake Bay Oyster Recovery Program, Piankatank River, Virginia Phase 2 Reef Habitat

Status
Closed (archived notice)
Agency
United States Department of the Army
Office
NORFOLK, USA
Notice type
Solicitation
Solicitation number
W9123622B5014
NAICS
237990 - Other Heavy and Civil Engineering Construction
PSC
Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Category
Construction Related Services (4.2)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2022-09-07
Deadline
2022-09-01

Description

09/07/2022 - Posted Abstract of Offers. Amendment 0002 - 8/19/2022 This Amendment is issued to extend the bid closing by one day to Thursday, September 1, 2022 at 2:00pm EDT. As a result the Bid Opening will be extended by one day to Friday, September 2, 2022 at 2:00PM EDT. Amendment 0001 - 8/2 Adds 3 attachements Plans, Specs, and Solicitation. 8/3 incorporates PIEE link to Attachments/Links section of SAM announcement. The Norfolk District, Corps of Engineers will be issuing a solicitation for a 100% small business set-aside, firm fixed-price, Invitation for Bid (IFB) to complete the CHESAPEAKE BAY OYSTER RECOVERY PROGRAM, PIANKATANK RIVER REEF HABITAT PHASE II, PIANKATANK RIVER, VIRGINIA. The U.S. Army Corps of Engineers-Norfolk District in Partnership with the Virginia Marine Resources Commission will be issuing a contract for the Piankatank River, Phase 2-Reef Habitat Restoration Project. The Project is located near the mouth of the Piankatank River in Middlesex and Mathews Counties. The Project is obtaining, transporting and placing Class A-1 riprap via barge to the project site. All reef substrate will be placed by mechanical clamshell from a barge. and recorded by Clamvision to ensure proper placement and height. The reef will span across approximately 53 acres of Public Baylor Grounds, approximately 12-18” in height. Substrates will be placed in striations approximately 30 feet wide, spaced approximately 45 feet apart. The Base Bid consists of placement of reef structures on approximately 7.98 acres of the project site. Option 1 consist of placement of reef structures on additional 4.25 acres of the project site. Option 2 consists of the placement of reef structures on approximately 2.96 acres, and Option 3 includes the placement on approximately 3.36 acres. Reef substrate will be installed per the plan drawings and specifications on the project site in water depths ranging from approximately 0.96’ MLLW to 0.10’ MLW

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in September 2022

More lists