ClickCease Carr Creek Control Tower Roof Replacement Sassafras, KY | Closed - MatchAwards

Carr Creek Control Tower Roof Replacement Sassafras, KY

Status
Closed (archived notice)
Agency
United States Department of the Army
Office
LOUISVILLE, USA
Notice type
Solicitation
Solicitation number
W912QR22Q0079
NAICS
238160 - Roofing Contractors
PSC
5650 - ROOFING AND SIDING MATERIALS
Category
Construction Related Materials (4.1)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2022-07-07
Deadline
2022-08-08
Place of performance
Sassafras, 41759

Description

The Contractor will replace Control Tower Roof at Carr Creek Lake in Knott County, Kentucky. The contractor shall furnish all necessary materials, supplies, tools, equipment, and labor to complete installation of a Fully Adhered Ethylene Propylene Diene Monomer (EPDM) minimum 90 mil roofing system onto the existing metal decking roof with insulation board that will provide a watertight roof membrane, approved by the Government Technical Point of Contact (TPOC) for the Carr Creek Lake Control Tower Roof. All contractors submitting EPDM roofing systems for approval consideration shall provide product specification from manufacturer and warranty specifications contained in this scope of work. The contractor shall remove the existing roof system, insulation, roof protrusion boot/seals, any loose gravel, dirt, and debris down to metal decking and properly dispose of the material to a site licensed to receive/recycle construction debris in accordance with Federal, State and Local Regulations. The contractor will completely remove the furnace vent and sleeve and 4 lightening rod boxes. The contractor will repair the holes in the decking with like materials. The contractor will install new insulation at a minimum of 2 inches thick and in accordance with a fully adhered EPDM roof system manufactures recommendations. The contractor will install a fully adhered EPDM minimum 90 mil roof system according to manufacturer’s recommendations. The contractor will seal remaining roof penetrations (2 bypass vents, Septic Tank Vent, Generator Exhaust Vent, Roof Access, and Roof Drain) to obtain a watertight seal in accordance with manufactures recommendations. The contractor shall insure that ALL roof drains/openings shall be covered during entire process during demolishing and install of roof construction/repair work. The contractor will present a manufacturer’s warranty with the following specifications: a. Minimum of 15 years. b. Repair of leaks caused by deterioration of any component of the installed system. c. Improper workmanship in the roof installation. d. Defects in the material. e. Shall be comprehensive with no prorating and no cap for repairs. f. Repairs covered by the warranty are without cost to the Government (owner) throughout the term. The contractor will take every reasonable precaution to prevent material from falling into the lake.

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in July 2022

More lists