<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_army/posts/108526672305611529" -->

---
title: Sources Sought for New Universal Grinder for Cometa Grinder… | Closed - MatchAwards
description: Sources Sought for New Universal Grinder for Cometa Grinder Replacement. United States Department of the Army. Solicitation PANRSA22P0000-002347. NAICS 333517 - Machine Tool Manufacturing. Deadline 2022-06-28. 3.1. Contractor Requirements: The Contractor shall provide the following Requirements:...
canonical: https://matchawards.com/dept_of_the_army/posts/108526672305611529
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Sources Sought for New Universal Grinder for Cometa Grinder… | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/108526672305611529
og:description: Sources Sought for New Universal Grinder for Cometa Grinder Replacement. United States Department of the Army. Solicitation PANRSA22P0000-002347. NAICS 333517 - Machine Tool Manufacturing. Deadline 2022-06-28. 3.1. Contractor Requirements: The Contractor shall provide the following Requirements:...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Sources Sought for New Universal Grinder for Cometa Grinder Replacement

Status

Closed (archived notice)

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

CORPUS CHRISTI, USA

Notice type

Sources Sought

Solicitation number

PANRSA22P0000-002347

NAICS

[333517 - Machine Tool Manufacturing](/groups/481)

PSC

J036 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY

Category

[Industrial Products Install / Maintenance / Repair (5.5)](/categories/industrial-products-and-services/industrial-products-install-maintenance-repair)

Posted

2022-06-23

Deadline

2022-06-28

Place of performance

Corpus Christi, 78419

## Description

3.1\. Contractor Requirements: The Contractor shall provide the following Requirements: Provide all parts, tools, equipment, and technical data for the new Computer Numeric Controlled Grinding Machine including all chucks and tooling the T700 HPC, G.G., and PT Rotors. Perform any and all necessary Foundation and Rigging (installation, electrical, mechanical) requirements to provide a full turn-key solution. Perform testing and inspection of factory start-up to ensure accuracy of work. Provide on-site operator training. 3.2\. Equipment Requirements: The Contractor shall provide one Computer Numeric Controlled Grinding Machine and all parts and equipment that shall meet, exceed, or include the following requirements. Max OD Grinding Diameter 13 Min OD Grinding Diameter 4 Max Grinding Length 23 Spindle Speed Rating 6450 RPM Wheel Surface Speed Rating 3600 SFPM CNC Control & Software Fanuc Master Rotor Editor Software Required Camera & Monitor for Operational Control Required High Pressure Hydraulic, Pneumatic Lubrication Unit Required Dust Extractor System Required In-Process Non-Contact Measuring System Required Soundproof Machine Enclosure Required Temperature Controlled A/C System (68°F +/- 5°F) Remote Teleservices System Required Master Rotor for Machine Calibration (One for each T700 HPC, G.G., and PT Rotors) Required T700 HPC Rotor Set of Chucks Required Impeller Shroud Holder Required Curvic Adapter for Aft Rotor End Required T700 G.G. Rotor Forward Chuck Required Tooling for Holding GG Rotor onto Forward Chuck Required T700 PT Rotor Set of Chucks Required \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ The Grinding Machine shall display the power consumption during internal grinding operations. The Grinding Machine electrical cabinet shall include a climate control system. The Grinding machine shall have a system for quickly and accurately dressing the grinding wheel. The amount removed during the dress cycle can be controlled manually or programmed within the part program. Machine software shall allow manual initiation of a dress cycle at any point during machine operation. The system shall have interlocks to prevent workers from operating the doors while the machine is in operation. The dust extractor shall be a High-Efficiency Particulate Air or HEPA air filter that must remove 99.97% of all particles greater than 0.3 micrometer from the air. The noise level shall not be more than 84 dBA. The machine shall be equipped with means of isolating or dissipating (lockout/tagout) stored energy associated with the machine to support maintenance and repair functions. Each axis of the Grinding Machine shall be fitted with a reference switch and limit switches as end limits for machine over-travel protection. Protection shall be provided so that all machine references have to be completed before the selection of auto is possible. A low air pressure monitoring system shall be supplied. Operator protection shall be provided against a catastrophic failure of a component part during the grind process. Corrosion resistant Caution or Warning plates shall be securely attached to the equipment in prominent, visible locations. All safety precautions to be observed by the operator or maintenance personnel shall be permanently marked on the plates. The Grinding Machine shall have the lowest sound emission levels that are technologically and economically possible and compatible with performance and environmental requirements. Engineering controls shall be the primary means of eliminating personnel exposure to potentially hazardous noise. All practical design approaches to reduce noise levels to below hazardous levels by engineering principles shall be explored. Priorities for noise control resources shall be assigned based on the applicable RAC. Where engineering controls are undertaken, the design objective shall be to reduce steady-state levels to below 85 dBA, regardless of personnel exposure time, and to reduce impulse noise levels to below 140 dB peak SPL.42 U.S.C> 4914 (reference (i)) applies. Measuring of noise shall be at three feet from the outside of the machine enclosure and five feet above the floor. 3.3\. Installation Requirements: 3.3.1\. Location: The contractor shall install the equipment for the Machine Repair Branch in Building 8 at the Corpus Christi Army Depot. Installation shall be turn-key, including any required assembly work by the contractor who will make the final utility connections. 3.3.2\. Contractors who are installing equipment shall dispose of all spent material and remove the material from the work site and keep the work area free of clutter and junk. 3.3.3\. The Contractor shall be responsible for delivery, including, shipment, removal and disposal of crating and packaging, movement into final location, leveling, and anchoring of equipment. 3.3.4\. Schedule: The Contractor shall complete all work within eighteen (18) calendar months of award. The Contractor shall routinely work during normal operating hours of the site, Monday through Friday, excluding federal holidays or when CCAD is closed due to local or national emergencies, administrative closings, or similar Government directed facility/installation closings. The Contractor shall maintain at all times adequate work force for the uninterrupted performance of all tasks defined within this SOW when CCAD is not closed. 3.3.4.1\. Normal Hours: The contractor shall perform all installations during normal operation hours of 0600 to 1630, Monday through Friday. 3.3.4.2\. Weekends / After Duty Hours: Notice of weekend/after duty hours scheduled work must be submitted to Security through the COR. Personnel working weekend or after duty hours must check in and out with Security. Building access support to job sites must be arranged with the COR. Keys to areas obtained by the COR. Requesting areas to be unlocked by personnel other than contract representatives is not authorized. 3.3.4.3\. Holidays: The Contractor shall not perform services on Federal Holidays. The following are recognized U.S. Holidays: New Years Day Martin Luther King Jr.s Birthday Presidents Day Memorial Day Juneteenth Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day 3.3.4.4\. Compressed Work Schedule: CCAD shall schedule a compressed work schedule during various times of the year. The Contracting Officer shall authorize a compressed work schedule for Contractor operations during the planned CCAD compressed work schedule. The Contracting Officer will inform the Contractor of any planned CCAD compressed work schedule at least seven (7) calendar days prior to change via email or memo. 3.3.5\. Electrical: The Contractor shall use copper conductors only. CCAD will provide the recommended 480-volt power for the equipment within thirty (30) feet of the installation location. 3.3.5.1\. Wiring: Wiring shall be according to the latest version of National Electric Code (National Fire Protection Association (NFPA) 70). All wires/cables carrying Alternating Current (AC) shall run in separate conduits from wires/cables carrying Direct Current (DC) or other signal wires. In addition, any conductors carrying high amperage DC signals shall be isolated from low-level DC carrying conductors. This separation of signals shall extend through the entire electrical circuit, including as much as possible, inside the control consoles. 3.3.5.2\. Grounding: All pieces of equipment shall have an installed ground connection with appropriate grounding and bonding in accordance with NFPA 77\. All cable shields shall ground at only one (1) end to prevent unwanted ground loops and eddy current effects. 3.3.5.3\. Electrical Identification: Wiring shall be color coded and identified alphanumerically with the identification appearing at all connections (e.g. at terminal strips, transducer connections, and at drive). All identification shall be permanently applied to the wires, and shall be secured by heat shrink tubing. The identification used shall be annotated on the new drawings required under this contract in accordance with DI?SESS?810000E, Production Drawings/Models and Associated Lists, (CDRL A0002). 3.3.6\. Testing and Inspections: The Contractor shall perform testing and inspections of all systems to ensure the technical accuracy of all work. The Contractor shall conduct on-site testing in accordance with the Original Equipment Manufacturers installation manuals, practices, and the appropriate vendors test procedures. The Contractor will provide detailed test results. 3.4\. Technical Manuals: The following data must be provided by the contractor, in the contractors format: Five (5) sets of Operational and Maintenance Manuals (which includes calibration instructions, programming instructions, and operation instructions). Rigging instructions. Foundation requirements (e.g. space allocation, dynamic loading) Physical environment requirement (e.g. lighting vibration, noise levels, and airborne contaminants) Procedures for transporting and lifting, installing, commissioning and decommissioning A complete set of installation instructions. Assembly and Wiring diagrams. Power consumption requirements Energy Sources General Equipment Design Drawings. Major component weights Work area safeguarding Preparation prior to start-up The system performance specifications Frequency of inspection Frequency and method of functional testing Guidance on the repair and maintenance of the machine and safeguards A recommended Spare Parts List of parts that will need replacing within a year. 3.4.1\. All manuals shall be written in the English language and be provided in hard copies as well as in electronic format on compact discs. 3.5\. Maintainability Requirements: 3.5.1\. The equipment shall be simple and practical to service and maintain. 3.5.1.1\. Government operators and maintenance personnel must be able to remove and replace parts without the use of non-SAE special tools. 3.5.1.2\. Government maintenance teams must be able to adjust valves and calibrate dials. 3.5.1.3\. A lubrication chart or plate shall be securely attached to any system stations or components requiring periodic lubrication. If a chart is used, it shall be laminated between clear plastic sheets, permanently sealed and provided with a designated pocket on the accessory cabinet for storage. The chart or plate shall provide the following information: Points of Lubrication Service Interval Type of Lubrication (with common MIL spec conversion name) Viscosity 3.6\. Training Requirements: Within thirty (30) days after acceptance, the Contractor shall provide a sixteen (16) hour training course on the setup, operation, and maintaining process of the new Grinding Machine. The course shall take place at CCAD for the duration of two days. The target audience (eight (8) people max) of this training shall be supervisors, operators, technicians, and engineers. The contractor shall provide any training course materials for all employees in the training program that are required at the time of training in accordance with DI-TMSS-81700A, Job Manual, (CDRL A0001). 3.7\. Security Requirements: 3.7.1\. The 9 page Security Requirements for All Contracts Performed at Corpus Christi Army Depot is attached in section 11.0 of this document. 3.8\. Safety Requirements: All work shall be conducted in a safe manner and in compliance with Federal, State, Local, Department of Defense, Army, and Depot regulations and national consensus standards. 3.8.1\. Safety and Occupational Health Plan: The Contractor shall develop, promulgate, and enforce a written safety and occupational health plan (herein referred to as a safety plan). The safety plan shall identify protocols and procedures to ensure a safe and healthful workplace. The safety plan developed and submitted by the Contractor shall address each of the elements/sub-elements in the outline contained in Appendix A of Army Corps of Engineers EM 385-1-1, Safety and Health Requirements manual in the order that they are provided in the manual. If an item is not applicable because of the nature of the work to be performed, the Contractor shall state this exception and provide a justification. The plan shall be submitted to the COR fifteen (15) calendar days after contract award. The government will have two weeks to review the contractors proposed safety and health plan. If any corrections are necessary, the contractor shall have two weeks to resolve any comments arising from government review. Upon the contracting officers determination that the governments comments (if any) have been satisfactorily resolved, the government will accept the safety and health plan in writing, and the accepted safety and health plan will be considered part of the contract. Unless the contracting officer accepts and approves the safety plan, the contractor shall not commence physical on-site work at the government installation/facility. 3.8.2\. Safety and Health Points of Contact: The contractor shall provide names and contact information for key contractor personnel, and alternates, who may be contacted 24 hours a day concerning safety and health matters or emergencies. The contractor shall appoint a site safety and health officer (SSHO) whose primary duty and responsibility is to prepare and enforce the contractors safety program. The SSHO will have at least 3 years of satisfactory experience in preparing and enforcing the contractors safety program on contracts of similar size and complexity in the past, and must have completed a 30-hour General Industry OSHA class or equivalent within the last three years. 3.8.3\. Activity Hazard Analysis (AHA): An Activity Hazard Analysis will be accomplished for critical or high risk activities being performed. The AHA must identify the sequence, the specific anticipated hazard, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. 3.8.4\. Safety and Occupational Health Training: The safety plan will describe how the contractor will implement and operate a safety and health training program encompassing all contractor and subcontractor employees who will work on-site at the government installation/facility. All affected employees shall be trained in accordance with the Safety and Health Training Program prior to performing work on-site at the government installation/facility except where an alternative training schedule is approved in writing by the contracting officer. At a minimum, the training program shall include written procedures and schedules for training of affected employees in the following: Employee rights under the Occupational Safety and Health Act Hazardous conditions that may be encountered during the performance of work at the government installation/facility, how to recognize hazardous conditions, and the signs and symptoms of workplace related illnesses and injuries. The hazard control methods, safe work methods, and personal protective equipment that will be applied to prevent work related illnesses and injuries, including the proper use and limitations of personal protective equipment. Procedures to be followed in the event of a fire/emergency or fire/emergency drill, while employees are working on-site at the government installation/facility, including procedures for obtaining medical treatment/assistance when needed. Responsibilities and procedures for reporting of hazardous conditions and work related accidents, illnesses, and injuries. Applicable safety and health rules of the government installation/facility that must be followed by contractor employees. NOTE: Obtain information on applicable Safety and Health rules of the government installation/facility from the contracting officer. Contractor employee, to include subcontractors, are made aware that Corpus Christi Army Depot is enrolled in OSHA Voluntary Protection Programs (VPP). The contractor will ensure all contractor employee, including subcontractors, receive training in VPP fundamentals. Other safety and health training as deemed necessary/appropriate by the Contractor. Method: The methods and resources the Contractor will apply to complete the above training in a timely and satisfactory manner, including information such as descriptions of training locations/facilities, training materials to be used, sources of training and training materials, instructor qualifications, communication of training to employees who cannot communicate effectively in English, refresher training, etc., as applicable. Documentation: Documentation of the training provided, including date(s) of training, name(s) of employees trained, training topic, instructor (if applicable), and means used to verify that the training was understood. This documentation shall be retained for the duration of the contract, and shall be made available to the contracting officer upon request. 3.8.5\. Contractor Safety Brief: Contractors will attend and provide contractor safety briefing to be schedule and hosted by the contracting officer representative with all stakeholders present (Safety, IH, Fire Department, Industrial Hygiene, affected Shop Supervisors, etc.) prior to start of the contracted task. 3.8.6\. Personal Protective Equipment (PPE): The Contractor personnel shall utilize the proper PPE where appropriate including head, eye, hand, foot, respiratory, and hearing protection suitable for the contracted work based on hazard analysis. All required PPE shall be maintained serviceable and worn properly when required. The Contractor safety plan shall clearly identify the work areas requiring PPE and the type of PPE required. Unserviceable PPE shall be removed from service and properly disposed of. The PPE utilized shall comply with all applicable American National Safety Institute (ANSI) and OSHA standards. Training of employees on the proper use of PPE shall be an integral part of the Contractor Safety and Occupational Health Training Program. The minimum PPE requirements required for all contractor, including sub-contractor personnel entering CCAD Industrial areas shall include but not limited to: High impact safety glasses with side shields that meet or exceed ANSI Z87.1-2015, American National Standard for Occupational and Educational Personal Eye and Face Protection Devices. Hearing protection in the form of plugs or muffs shall be worn by all who are exposed to high noise activities/operations that produce noise levels in excess of 85 decibels. CCAD Building 8 is a hazardous noise area and contractor personnel shall be provided and wear appropriate hearing protection. When shop personnel are using impact tools, double hearing protection may be required to be worn by contractor personnel in the industrial area. Hard hats shall be worn that comply with ANSI Z89.1-2014, Industrial Head Protection, and shall be worn by all workers when overhead hazards exist or in areas designated as Hard Hat Working Zones. Gloves of the proper type shall be worn by persons involved in activities that expose the hands to cuts, abrasions, punctures, burns, and chemical irritants. The Contractor shall ensure all contractor employees, including subcontractors, who enter industrial areas wear compression-type protective footwear with slip-resistant soles meeting ASTM F2413, Specification for Performance Requirements for Protective Footwear. NOTE: No open toe shoes or shoes with high heels (2.0 inch or higher) will be worn in CCAD industrial areas, production and/or service areas. The Contractor is responsible for assessing and determining what PPE is required to be worn by contract personnel to include subcontractors fulfilling the contracted service. OSHA 29 CFR 1910.1026 provides recommended engineering, housekeeping, and good hygiene practices. 3.8.7\. Compliance with Licenses and Certification Requirements: The Contractor shall obtain and maintain 

<!-- mobian-agent-ad sponsored="true" id="36238340-d58a-45cb-92dc-470b4adbba62" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/industrial-products-and-services/industrial-products-install-maintenance-repair?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Harold Russell Jr
* Danny Ortiz

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/a8703306d38f402faa874392f6360fef/view)

[More from United States Department of the Army posted in June 2022](/dept%5Fof%5Fthe%5Farmy/archive/2022-06)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Sources Sought for New Universal Grinder for Cometa Grinder Replacement","description":"3.1. Contractor Requirements: The Contractor shall provide the following Requirements: Provide all parts, tools, equipment, and technical data for the new Computer Numeric Controlled Grinding Machine including all chucks and tooling the T700 HPC, G.G., and PT Rotors. Perform any and all necessary Foundation and Rigging (installation, electrical, mechanical) requirements to provide a full turn-key solution. Perform testing and inspection of factory start-up to ensure accuracy of work. Provide on-site operator training. 3.2. Equipment Requirements: The Contractor shall provide one Computer Numeric Controlled Grinding Machine and all parts and equipment that shall meet, exceed, or include the following requirements. Max OD Grinding Diameter 13 Min OD Grinding Diameter 4 Max Grinding Length 23 Spindle Speed Rating 6450 RPM Wheel Surface Speed Rating 3600 SFPM CNC Control \u0026 Software Fanuc Master Rotor Editor Software Required Camera \u0026 Monitor for Operational Control Required High Pressure Hydraulic, Pneumatic Lubrication Unit Required Dust Extractor System Required In-Process Non-Contact Measuring System Required Soundproof Machine Enclosure Required Temperature Controlled A/C System (68°F +/- 5°F) Remote Teleservices System Required Master Rotor for Machine Calibration (One for each T700 HPC, G.G., and PT Rotors) Required T700 HPC Rotor Set of Chucks Required Impeller Shroud Holder Required Curvic Adapter for Aft Rotor End Required T700 G.G. Rotor Forward Chuck Required Tooling for Holding GG Rotor onto Forward Chuck Required T700 PT Rotor Set of Chucks Required _________________________________________________________________________ The Grinding Machine shall display the power consumption during internal grinding operations. The Grinding Machine electrical cabinet shall include a climate control system. The Grinding machine shall have a system for quickly and accurately dressing the grinding wheel. The amount removed during the dress cycle can be controlled manually or programmed within the part program. Machine software shall allow manual initiation of a dress cycle at any point during machine operation. The system shall have interlocks to prevent workers from operating the doors while the machine is in operation. The dust extractor shall be a High-Efficiency Particulate Air or HEPA air filter that must remove 99.97% of all particles greater than 0.3 micrometer from the air. The noise level shall not be more than 84 dBA. The machine shall be equipped with means of isolating or dissipating (lockout/tagout) stored energy associated with the machine to support maintenance and repair functions. Each axis of the Grinding Machine shall be fitted with a reference switch and limit switches as end limits for machine over-travel protection. Protection shall be provided so that all machine references have to be completed before the selection of auto is possible. A low air pressure monitoring system shall be supplied. Operator protection shall be provided against a catastrophic failure of a component part during the grind process. Corrosion resistant Caution or Warning plates shall be securely attached to the equipment in prominent, visible locations. All safety precautions to be observed by the operator or maintenance personnel shall be permanently marked on the plates. The Grinding Machine shall have the lowest sound emission levels that are technologically and economically possible and compatible with performance and environmental requirements. Engineering controls shall be the primary means of eliminating personnel exposure to potentially hazardous noise. All practical design approaches to reduce noise levels to below hazardous levels by engineering principles shall be explored. Priorities for noise control resources shall be assigned based on the applicable RAC. Where engineering controls are undertaken, the design objective shall be to reduce steady-state levels to below 85 dBA, regardless of personnel exposure time, and to reduce impulse noise levels to below 140 dB peak SPL.42 U.S.C\u003e 4914 (reference (i)) applies. Measuring of noise shall be at three feet from the outside of the machine enclosure and five feet above the floor. 3.3. Installation Requirements: 3.3.1. Location: The contractor shall install the equipment for the Machine Repair Branch in Building 8 at the Corpus Christi Army Depot. Installation shall be turn-key, including any required assembly work by the contractor who will make the final utility connections. 3.3.2. Contractors who are installing equipment shall dispose of all spent material and remove the material from the work site and keep the work area free of clutter and junk. 3.3.3. The Contractor shall be responsible for delivery, including, shipment, removal and disposal of crating and packaging, movement into final location, leveling, and anchoring of equipment. 3.3.4. Schedule: The Contractor shall complete all work within eighteen (18) calendar months of award. The Contractor...","url":"https://matchawards.com/dept_of_the_army/posts/108526672305611529","identifier":"PANRSA22P0000-002347","category":"333517 - Machine Tool Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"J036 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"5.5 Industrial Products Install / Maintenance / Repair","url":"https://matchawards.com/categories/industrial-products-and-services/industrial-products-install-maintenance-repair"}],"availabilityStarts":"2022-06-23","availabilityEnds":"2022-06-28","areaServed":"Corpus Christi, 78419","sameAs":"https://sam.gov/opp/a8703306d38f402faa874392f6360fef/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Manufacturing","item":"https://matchawards.com/contracts/manufacturing"}]}
```

