ClickCease Dillion Dam Intake Structure Window Replacement | Closed - MatchAwards

Dillion Dam Intake Structure Window Replacement

Status
Closed (archived notice)
Agency
United States Department of the Army
Office
HUNTINGTON, USA
Notice type
Combined Synopsis/Solicitation
Solicitation number
W9123722Q0041
NAICS
236220 - Commercial and Institutional Building Construction
PSC
Z1JZ - MAINTENANCE OF MISCELLANEOUS BUILDINGS
Category
Facility Related Services (4.4)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2022-03-04
Deadline
2022-03-11

Description

PROPOSAL SUBMISSION FOR THIS PROCUREMENT IS HEREBY EXTENDED TO 11 MARCH 2022. 6 QUESTIONS WERE RECEIVED FROM PROSPECTIVE CONTRACTS. ANSWERS TO THOSE QUESTIONS ARE ATTACHED FOR ALL TO REFERENCE. PERFORMANCE WORK STATEMENT Construction Contract for the Replacement of Intake Structure Windows for Dillon Dam General Requirement: The Contractor shall supply all materials, equipment, and labor to replace the windows on the intake structure at Dillon Dam. All materials and supplied windows shall be new. Address: U.S. Army Corps of Engineers, Dillon Dam 4969 Dillon Dam Road Zanesville, OH 43701 Scope of Work: The Contractor shall remove all windows on the intake structure and replace with new windows. The new windows shall be drop-in replacements which require no modification to the intake structure walls. The new windows shall be constructed of extruded aluminum as called for on drawing 52.1/18 and conform to any applicable ASTM standards. The windows shall be doubled paned with argon between the panes and have a transition tint applied with 35-50% light passing. Windows on the first floor of the intake structure are to be a type which permits them to open by swinging inward. Windows on higher floors have no need and therefore should not be a type which opens. There are four types of windows on the intake structure: First floor windows: 11 count 5’-0 7/8”x5’-5” Opening 2 count 5’-0 7/8”x5’-5” Opening 1 count 5’-0 7/8”x5’-5” Non-Opening* Upper floor windows: 16 count 5’-0 7/8”x8’-1” Non-Opening 4 count 3’-9 7/8”x8’-1” Non-Opening *This window is blocked by a fixed ladder and should not be a type which opens. The Contractor shall be responsible for the proper handling, maintenance, storage, and protection of all materials until fully installed and accepted by the U.S. Army Corps of Engineers at Dillon Dam. Any damage to the materials shall be corrected by the Contractor at no expense to the Government. All removed windows (except as directed by GOV), debris, and trash shall be disposed of by the Contractor off-site in accordance with all federal, local, and state laws. Drawings 52.1-5 and 52.1-18 are provided for reference. Specifications for Installation and Materials: All materials and installation procedures shall be in accordance with: ASTME E2112 19c Standard Practice for Installation of Exterior Windows, Doors and Skylights. ASTM C1193—05a Standard Guide for Use of Joint Sealants. ASTM C834—05 Standard Specification for Latex Sealants. Warranty: The Contractor shall provide the standard manufacturer’s warranty for a period of one (1) year, applicable to the materials and installation of the windows. Contractor and Government Equipment and Supplies: The Contractor shall furnish all personnel, equipment, transportation, disposal, supplies, and materials. No government equipment or supplies shall be used for this project. The Contractor shall provide Personal Protection Equipment to include steel-toed safety boots, hard hat, safety glasses, hearing protection, sleeved shirts, long pants, gloves, safety harness /w lanyards. The Contractor is responsible for any scaffolding or manlifts needed to complete the installation as described herein. Site Visit: Bidders are highly encouraged to make a site visit prior to bidding to ascertain the complete requirements of the contract. Bidder shall contact the following before coming on-site: Point of Contacts for U.S. Army Corps of Engineers: Will Rutter, Resource Manager (Jonathan Miller Alternate) Dillon Lake U.S. Army Corps of Engineers 4969 Dillon Dam Road Zanesville, OH 43701 Telephone: (740) 454-2225 Email: will.t.rutter@usace.army.mil -- Government Representative: Tyler Lester Project Engineer, Maintenance Branch U.S. Army Corps of Engineers 502 Eighth Street Huntington, WV 25701-2035 Telephone: (304) 399-5045 Email: tyler.w.lester@usace.army.mil Period of Performance: Contractor shall begin work within 14 calendar days of receiving Notice to Proceed and work shall be completed within 120 days from the day Notice to Proceed is issued. Hours of Operation a. The contractor shall perform all work during the following hours: Monday through Friday, 0730-1600 except Federal holidays. Contractor shall submit work schedule to Resource Manager two (2) weeks prior to work activities for review and approval. b. Federal Holidays: When one of the designated holidays falls on a Sunday the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours to be approved by Project Manager. Work shall be scheduled around the Federal holidays listed below unless approved in advance. Eleven Federal holidays observed are as follows: New Year’s Day (January 1st) Martin Luther King Day (3rd Monday in January) President’s Day (3rd Monday in February) Memorial Day (Last Monday in May) Juneteenth (June 19th) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th) Payment: Payment for all costs in connection with the acquisition of supplies or installation thereof will be made in accordance with the Price Breakout Schedule. Invoice shall be sent to the Dillon Dam Project Office after final inspection of all completed work has been approved to the attention of Will Rutter Resource Manager. Will Rutter Resource Manager, Dillon Lake U.S. Army Corps of Engineers 4969 Dillon Dam Road Zanesville, OH 43701 Quality Assurance: Test of materials. The Contractor shall, at his expense, perform analyses and tests to demonstrate that all materials are in conformity with the specifications. Should the Contractor desire to use stock materials not manufactured specifically for the work covered by these specifications, he shall submit evidence, satisfactory to the Contracting Officer that such materials conform to the requirements of the specifications. Detailed tests of these materials will then not be required, if so, approved by the Contracting Officer. Tests, except where modified shall be made as indicated in the respective detailed specifications or on the drawings and, unless otherwise authorized, in the presence of the Government Representative. Certified reports in triplicate of all required analyses and tests shall be submitted to the Government Representative upon request, specimens, and samples for independent analyses and tests. These specimens and samples shall be properly labeled and prepared for shipment. Damage Reports: All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the Resource Manager. Deficiencies: If the contractor fails to perform, or if performance in any area is judged unsatisfactory, the Government will take corrective action. See FAR Clause 52.246-12. Submittals: The Contractor shall submit the following to the Government for approval prior to the specified times. List of materials: prior to ordering any materials Sequence of work: prior to the pre-construction meeting Accident prevention plan (see below): prior to the pre-construction meeting The accident prevention plan shall cover the use of any equipment which shall be used during the execution of this scope of work. List of Materials: The Contractor shall submit the style and color of window to the Government Representative for approval prior to ordering. The Contractor shall also submit any manufacturer’s literature associated with the windows used, along with the above submittal. The Contractor shall furnish the Government Representative with one (1) copy of all purchase orders associated with the task. If any testing is required, the purchase orders shall contain the test site address and the name of the testing agency. Pre-Construction Meeting: The Contractor shall contact the Government Representative to arrange an on-site meeting which shall be performed at least two (2) weeks prior to commencement of work. This meeting shall occur only after all submittals have been approved by the Government. Final Inspection: Five (5) days prior to demobilization, the Contractor shall contact the Government Representative to arrange a final inspection of all work performed. If any deficiency is found with the work performed or materials used, the work will not be accepted, and the error shall be corrected by the Contractor at no expense to the Government. Any damage to the windows, frames, surrounding structure, etc. will be cause for rejection, and the damage shall be corrected by the Contractor at no expense to the Government. Wage Rates: Davis-Bacon wage rates are applicable to this procurement and are attached to this solicitation in accordance with contract clause FAR 52.222-6. SECURITY REQUIREMENTS All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Huntington District facilities shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Huntington District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Huntington District Security Management Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released. FOR ALL CONTRACTS 1-YEAR AND SUBSEQUENT OPTION YEARS: Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities. The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) Security Information sheet on each employee working on site must be submitted directly to the Huntington District Security Office. The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur. Contractors shall have background checks completed for their employees annually in the case of Contracts with option periods. For instance, if the employee was cleared in May of 2018, they shall be cleared again in May of 2019. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite. The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Huntington District USACE Security Management Office for background purposes. FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC) The documents listed below are required: SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management Office). Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees. Following submission of paperwork, the Huntington District Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Huntington District Security Management Office will make recommendations to the PCO or their Designated Representative. The Huntington District Security Management Office cannot give approval due to unfavorable report(s). The Huntington District Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision. FOREIGN NATIONALS The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph: In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc. In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Huntington District Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work. Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract. The Contractor shall contact the Huntington District Security Management Office by phone, letter, or email at the following numbers/addresses: CELRH-SM 502 Eighth Street Huntington, WV 25701 Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Scott E. Grandon, phone (304) 399-5661; email scott.e.grandon@usace.army.mil AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area: "All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum." Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area: "All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes." For contractors who do not require CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area: The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training." Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR