Notice for Architect and Engineering (AE) Services to support the Construction Management Program, Mobile District, South Atlantic Division (SAD), USACE
- Status
- Closed (archived notice)
- Agency
- United States Department of the Army
- Office
- MOBILE, USA
- Notice type
- Solicitation
- Solicitation number
- W9127821R0071
- NAICS
- 541330 - Engineering Services
- PSC
- C211 - ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING
- Category
- Construction Related Services (4.2)
- Set-aside
- Partial Small Business Set-Aside (FAR 19.5)
- Posted
- 2022-03-03
- Deadline
- 2022-03-15
- Place of performance
- Mobile, 36602
Description
AMENDMENT 0001: Change to second paragraph SELECTION CRITERIA: CONTRACT INFORMATION: The U.S. Army Corps of Engineers, SAD, Mobile District requires AE Services for the Construction Management Program. Services are to be provided under a Multiple Award Task Order a Contract (MATOC). This procurement will be conducted in accordance with the Architect and Engineer Selection Procedures (formerly referred to as the Brooks Act). The North American Industry Classification System (NAICS) code for this action is 541330. It is open to all AE firms regardless of size. The Government intends to award approximately nine (9) contracts that will utilize a total shared capacity of $99,000,000 for a term not to exceed five (5) years. The Government intends to award three (3) or more contracts on an Unrestricted (UR) basis that will share $49,000,000 in capacity, three (3) or more contracts set-aside for Small Business (SB) that will share $25,000,000 in capacity, and three (3) or more contracts set-aside for Woman-Owned Small Business (WOSB) that will share $25,000,000 in capacity. In the event there are not three (3) WOSBs determined to be most highly qualified AE firms, the capacity set-aside for WOSBs will be rolled into the SB pool. In the event there are not three (3) SBs determined to be most highly qualified AE firms, the capacity set-aside for SBs will be rolled into the UR pool. Work under this contract will be subject to satisfactory negotiation of individual firm fixed price task orders. Rates will be negotiated for each 12-month period of the contract. Task orders will be competed among the MATOC holders using Architect and Engineer Selection procedures pursuant to FAR Subpart 36.6 in accordance with EP 715-1-7, the USACE TORN Process, and FAR 16.505(b)(1). SB MATOC holders will be able to compete for all task orders. UR MATOC holders will be able to compete on task orders that are not set-aside for SBs. AE services under $250,000 will be set-aside for SBs. All MATOC holders, regardless of size, shall provide AE services to support the Construction Management Program as defined in 40 U.S.C. 1101 and FAR 2.101. All interested AE firms are cautioned to review the restrictions of FAR Part 9.5 (Organizational and Consultant Conflicts of Interest). Awardees must also comply with FAR Clause 52.204-25 (Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment) and FAR Provision 52.204-24 (Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment). PROJECT INFORMATION: This procurement is seeking AE services as defined in 40 U.S.C. 40 U.S.C. 1101 and FAR 2.101 to support the Construction Management Program. Potential AE firms shall have the capability to manage multi-disciplined teams, thru in-house staff or consultants, and provide timely and cost-effective solutions for a full range of comprehensive support services for the Construction Management Program. All AE services shall be of the highest possible quality and standards, and adhere to all applicable local, State, and Federal laws. The services are intended to provide a full range of comprehensive support performing tasks and providing deliverables which result in biddability and constructability reviews for building construction projects; preparing contract related documents and analysis, such as construction cost estimates, project schedules or networks analysis systems, delay impact analysis, claims and change order analysis; reviewing submittals; reviewing shop drawing; and performing quality assurance activities in connection to construction inspection specific to the Construction Management Program. Support is provided in compliance with DoD instruction, policy and guidance, as well as State, Federal and local criteria, and requires multiple contracting resources to provide Construction Management support for its diverse range of stakeholders to include the Department of Defense (DoD), U.S. Army, U.S. Army Reserves, U.S. Army National Guard, U.S. Air Force, U.S. Navy, U.S. Marine Corps, Defense Logistics Agency, NASA, Department of Homeland Security, Veterans Administration, Federal Bureau of Investigation, and others. Support will be provided in accordance with the Economy Act and all applicable agreements will be in place prior to providing any requested support. These construction management services will be provided at various military, Federal, and other installations within the Mobile Districts Area of Responsibility (AOR) which includes the southeastern states as well as Central and South America. Work under this contract requires knowledge and capability of drawings produced in the AutoCAD, Autodesk Revit Building Information Modeling (BIM), Bentley BIM, or MicroStation format; technical specifications produced with SPECSINTACT software using Unified Facilities Guide Specifications, or industry standard specifications using international and Host Nation standards; and Government web-based Design Review and Checking System (ProjNet) located at www.projnet.org. SELECTION CRITERIA: The source selection factors for this procurement are listed below in descending order of importance. Factors 1 through 6 are primary. Factor 7 is secondary and will only be used as a tie-breaker among technically equal firms. Primary factors will be assigned a rating from outstanding to unsatisfactory, based on the risk to the Government that the Offeror will successfully perform that evaluated factor. An overall rating will also be applied to the proposal submission using the same rating scale. Proposals failing to respond or provide complete information for each factor, as required by this solicitation, will be determined non-compliant and will be removed from further consideration. After all ratings have been assigned, Offerors will be ranked as Most Highly Qualified, Highly Qualified, and Not Qualified in accordance with EP 715-1-7 Architect-Engineer Contracting In USACE. For purposes of this solicitation, a stand-alone contract (such as a C or P-type contract) or single task order under an Indefinite Delivery Contract is considered one project. Separating activities performed under a contract or task order will not be considered multiple projects; conversely, combining activities performed under separate contracts or task orders to produce a single project will not be considered. Projects in which the AE Service is not complete will not be evaluated. Task Orders for AE Services in which there are option years are considered complete when the base year is completed. Factor 1. Professional Qualifications (SF330, Part I, Section E) Part A Resumes of Key Personnel (Section E, Blocks 12 18): Offerors must have, either in-house or through consultants or subcontractors, the disciplines listed below. To demonstrate qualifications, resumes for persons filling these disciplines are to be provided in Section E. Each resume shall not exceed one page in length. All Professional Registrations, Licensures and/or Certifications must identify the state in which Professional Registration, License and/or Certification is obtained; Professional Registration, License and/or Certification number; and expiration dates (as applicable). Specialist and other disciplines listed below shall have a degree in engineering, geology, or other related field of science, from an accredited university and specific training in the area of specialization. In Block 13, the role listed must use the exact same discipline nomenclature as listed below. If an individual will serve in more than one role, then all disciplines shall be clearly indicated in Block 13. The content of Section E is not to be altered and all items within Section E shall be answered completely. Additionally, all Key Personnel must be shown on the organizational chart in Section D. The following disciplines are required: (1) Project / Task Order Manager (2) Architect - Registered Architect, provide licensure/certification number and expiration date (3) Civil Engineer Professional Engineer, provide licensure/certification number and expiration date (4) Electrical Engineer - Professional Engineer, provide licensure/certification number and expiration date (5) Mechanical Engineer - Professional Engineer, provide licensure/certification number and expiration date (6) Structural Engineer Professional Engineer, provide licensure/certification number and expiration date (7) Cost Estimator(s) Certified CCP or CEP or equivalent through organizations such as AACE, ICEC, PCEA; provide licensure/certification number and expiration date. Resumes are required for the firms and/or consultants cost engineering or estimating specialist(s) for the each of the following disciplines: architectural, structural, civil, mechanical, and electrical. A single resume may demonstrate experience in one or more disciplines, however, competence and experience for each assigned discipline must be clearly demonstrated. (8) Construction Inspector(s) - Resumes are required for the firms and/or consultants construction inspector(s) for the each of the following disciplines: architectural, structural, civil, mechanical, and electrical. A single resume may demonstrate experience in one or more disciplines, however, competence and experience for each assigned discipline must be clearly demonstrated (9) Project Scheduler demonstrate specific experience with 01 32 01.00 10 (Project Schedule) specification section, Resident Management System (RMS) and Quality Control System (QCS) Modules, and Primavera or equivalent scheduling software (10) Environmental Compliance Specialist demonstrate specific experience in the regulatory field, with state and federal construction related permits, wetlands, working knowledge and/or training on field/environmental surveys and studies, data collection, data entry, environmental regulations, hazardous material/waste/solid waste management, damage surveys, abatement, inspections, restoration and/or other environmental compliance efforts (11) Project Controls demonstrate specific experience with technologies such as BIM, Bluebeam, and electronic drawing sets; reporting efforts such as permit status, design schedule status, and project close-out; and preparing special reports by collecting, analyzing, and summarizing information and trends (12) Building Envelope Specialist demonstrate specific experience with building envelope planning, commissioning, and testing, inspecting, and oversight of air and weather barriers (13) Geotechnical Engineer Professional Engineer, provide licensure/certification number and expiration date (14) Fire Protection Engineer - Professional Engineer, provide licensure/certification number and expiration date Part B Relevant Projects (Section E, Block 19): All Key Personnel are required to have a minimum of five (5) years of project experience in their discipline demonstrated by projects with scope, magnitude, and complexity comparable to this solicitation. The definition of a project is as noted in Project Information and Selection Criteria above. Relevant projects are those that reflect experience performing the respective discipline. Relevant Project information should be brief and highlight specific roles and tasks performed by the Key Personnel, Project Type, Scope, and Costs. No more than five projects should be listed for each resume, and each project listed must have been completed within five (5) years of publication of this solicitation announcement. (Note: The projects provided for this factor may also be used to address Factor 2.) The evaluation of Factor 1 will take into consideration the education and current registration, licensure, certification(s), or specialized training, as applicable, of each person named for each discipline and that persons longevity with the firm named in Block 15. It will also take into consideration the persons relevant project experience provided in Block 19. More weight will be given to experience with complex projects on military installations that are of scope, magnitude, and complexity similar to that described above in the paragraph titled Project Information. More weight will also be given for experience in support of the Construction Management Program with the following military construction project types: utility infrastructure, airfield drainage, aprons, vehicle maintenance facilities, barracks, child development centers, lodging facilities, installation access control points, storage facilities, chapels, fire stations, medical facilities, and/or other administrative facilities of similar scope and complexity. This factor may be assessed Strengths or Weaknesses, as appropriate. Only the Key Personnel disciplines requested in this solicitation will be evaluated. The basis of evaluation for Factor 1 will be information submitted in Part I, Sections E and G. Factor 2. Specialized Experience and Technical Competence (Projects) (SF330, Part I, Section F) For Factor 2, Offerors are to demonstrate specialized experience and technical competence which meets the definition of AE Services as defined in 40 U.S.C. 1101 and FAR 2.101. In Section F Offerors are to submit up to ten (10) projects that best illustrate the proposed teams qualifications for award of a contract. (Note: The projects provided for Factor 1 may also be used to address this factor, however, not by reference only.) The definition of a project is as noted in Project Information and Selection Criteria above. For each project use only one page and note the contract or task order number, as applicable. The SF330 may be modified in order to meet the Submission Requirements (font size); however, the content of Section F is not to be altered (removal or deletion of required Blocks) and all items within Section F shall be answered completely. Projects in which the AE Service is not complete will not be evaluated. All projects must have been conducted within five (5) years of publication of this solicitation announcement (see Block 22) and must be complete at the publication of this solicitation announcement. At least six (6) of the projects presented must show that the Offeror (the firm submitting the SF330 as the prime contractor), whether as a prime contractor or subcontractor, performed the majority (>50%) of the work on the project. To demonstrate such performance, Offerors are to specifically describe the type(s) of work performed and state the percentage they performed of each type of work. If a proposed subcontractor also worked on the project, state the type(s) and percentage(s) of work it performed. If an Offeror submits more than six (6) projects, those projects must reflect performance of work by the Offeror, or one or more of its proposed subcontractors. For each such project state the percentage of work performed by the Offeror, and/or the percentage of work performed by each proposed subcontractor. Clearly identify the Project Number (as indicated above), Type and the Offerors role on the project. In Block 24, cost is the total value of the project, not simply the value of the work performed by the Offeror and/or any proposed subcontractor. The Government reserves the right to review any official performance evaluation system of records to inform its source selection decision. When completing Section G, in Block 26, along with the name of key personnel, include the firm with whom the person is or was associated at the time the project was performed. Those firms submitting as Joint Ventures (JV) must follow the same procedures as any other Offeror with the following exception. If the JV (the Offeror) cannot provide at least six (6) projects that demonstrate performance by the JV of 50% or more of a project, as either a prime contractor or subcontractor, the JV may provide projects performed by any partner of the offering JV that reflect performance of 50% or more of a project, as either a prime contractor or subcontractor. JV Offerors are not required to submit projects of both partners but more consideration may be given for projects that were performed as a JV. Of the projects submitted as prescribed above, relevant projects are those that reflect the specialized experience and technical competence of the Offeror and/or proposed subcontractor(s), as prime contractors or subcontractors, performing services similar to those described above in the paragraph titled Project Information. More weight will be given to experience with complex projects on military installations that are of scope, magnitude, and complexity similar to that described above in the paragraph titled Project Information. More weight will also be given for experience in support of the Construction Management Program with the following military construction project types: utility infrastructure, airfield drainage, aprons, vehicle maintenance facilities, barracks, child development centers, lodging facilities, installation access control points, storage facilities, chapels, fire stations, medical facilities, and/or other administrative facilities of similar scope and complexity. This factor may be assessed Strengths or Weaknesses, as appropriate. The basis of evaluation for Factor 2 will be information submitted in Part I, Sections F and G. Factor 3. Specialized Experience and Technical Competence (Technical Capabilities) (SF330, Part I, Section H) In Part I, Section H, the Offeror must provide a proposed work management plan demonstrating its teams breadth of knowledge and experience with Construction Management. The narrative should describe the corporate approach, driving criteria or potential constraints, and examples of successful performance. The narrative should specifically discuss knowledge of, and experience with, work management planning to include quality management, subcontractor management, prior experience of the prime firm and any significant consultant, version control management, proactive internal and external communication protocols, and independent submittal review processes in the context of providing services under multiple task orders. This factor may be assessed Strengths or Weaknesses, as appropriate. Factor 4. Past Performance (SF330, Part I, Section H) Offerors shall demonstrate in narrative (or other format) a history of customer satisfaction with the Offeror's quality of work, cost control and scheduling. Past Performance history is not to be limited to information presented in Factor 2. Past performance can be substantiated by presentation of CPARS or PPQ ratings, or customer ratings from other project evaluation systems. Customer excerpts or quotes from prior evaluations for the purposes of substantiating the narrative are not desired. The narrative should describe the corporate approach for maintaining success with customer satisfaction with the Offeror's quality of work, cost control and scheduling. This factor may be assessed Strengths or Weaknesses, as appropriate, with more weight given to successful performance ratings in these three areas on Department of Defense contracts. Factor 5. Capacity to Accomplish the Work (SF330, Part I, Section H) All Unrestricted Offerors are to clearly demonstrate the capacity to accomplish at least three (3) $500,000 task orders simultaneously. All SB Offerors are to clearly demonstrate the capacity to accomplish at least three (3) $250,000 task orders simultaneously. This factor may be assessed Strengths or Weaknesses, as appropriate. Factor 6. Knowledge of Locality (SF330, Part I, Section H) Offerors are to clearly demonstrate their knowledge of the locality of AE services to support the Construction Management Program. The narrative should describe the any known of geological features, climatic conditions or local construction methods that are unusual or unique to Mobile Districts AOR in support of the Construction Management Program. MoreContacts
- ROSEMARY HALL
- Cheryl Ayler
Email and phone are in the source notice.
More from United States Department of the Army posted in March 2022