<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_army/posts/106907251549966030" -->

---
title: Thrust Bearing Coolers for BONNEVILLE LOCK & DAM, Oregon | Closed - MatchAwards
description: Thrust Bearing Coolers for BONNEVILLE LOCK & DAM, Oregon. United States Department of the Army. Solicitation W9127N21Q0111. NAICS 332410 - Power Boiler and Heat Exchanger Manufacturing. Total small business set-aside. Deadline 2021-09-15. TECHNICAL SPECIFICATIONS Technical Specifications Thrust...
canonical: https://matchawards.com/dept_of_the_army/posts/106907251549966030
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Thrust Bearing Coolers for BONNEVILLE LOCK & DAM, Oregon | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/106907251549966030
og:description: Thrust Bearing Coolers for BONNEVILLE LOCK & DAM, Oregon. United States Department of the Army. Solicitation W9127N21Q0111. NAICS 332410 - Power Boiler and Heat Exchanger Manufacturing. Total small business set-aside. Deadline 2021-09-15. TECHNICAL SPECIFICATIONS Technical Specifications Thrust...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Thrust Bearing Coolers for BONNEVILLE LOCK & DAM, Oregon

Status

Closed (archived notice)

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

PORTLAND, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

W9127N21Q0111

NAICS

[332410 - Power Boiler and Heat Exchanger Manufacturing](/groups/439)

PSC

4420 - HEAT EXCHANGERS AND STEAM CONDENSERS

Category

[Facility Related Materials (4.3)](/categories/facilities-and-construction/facility-related-materials)

Set-aside

[Total Small Business Set-Aside (FAR 19.5)](/contracts/small-business)

Posted

2021-09-10

Deadline

2021-09-15

Place of performance

Cascade Locks, 97014

## Description

TECHNICAL SPECIFICATIONS Technical Specifications Thrust Bearing Coolers Bonneville Lock & Dam, Oregon 1 General Supply eight (8) complete thrust bearing cooler assemblies. Furnish all labor, material, and equipment to fabricate complete thrust bearing coolers. 2 References Thrust Bearing Oil Cooler, Drawing No. W57780070645\_R3 3 Government Furnished Equipment (GFE) None 4 Submittals Provide initial shop/fabrication drawings for government to verify proposed design within 30 calendar days from date of contract award. 5 Specifications Provide eight complete Thrust bearing oil coolers assemblies based on dimensions shown in Thrust Bearing Oil Cooler, Drawing No. W57780070645\_R3 Provide first article initial set of a thrust cooler to government test fit in a unit prior to fabrication of the remaining seven (7) units. Each cooler assembly shall consist of one right-hand and one left-hand section that are bolstered together at the split plate referenced on Drawing No. W57780070645\_R3 on the top left corner as Split. The headers shall be constructed of 2 minimum Schedule 40 carbon steel pipe, ASTM A106 Grade B. The split plates shall be carbon steel, ASTM A516 Grade 70\. Gaskets shall be 60 durometer neoprene. Hardware shall be zinc plated carbon steel, ASTM A516 Tubes shall be 5/8 OD x 0.049 minimum wall 90/10 copper-nickel, ASTM B111\. Fins shall be 1.375 OD x 0.02 nominal thickness, aluminum 1100 fin, 9 fins per inch. Tube joints shall be rolled and brazed. Brackets shall be carbon steel L brackets with mounting holes. (10 brackets per cooler) ASTM A516 Connections shall be 2 Class 150 carbon steel ANSI flanges. All carbon steel surfaces coated with Glyptal 1202\. All flange openings shall be covered for transit. Cooler assemblies to be shipped in wooden skids. 6 Testing and Inspection Preliminary inspection and hydrostatic test by USACE representative at place of manufacture will be required prior to delivery of first available complete assembly. Contractor shall notify Government of inspection at least 14 days prior to date of inspection. All cooler assemblies shall be hydrostatically tested at place of manufacturer by the Contractor before they are delivered. They shall be tested to 75 psi. The coolers shall hold this test pressure for 60 minutes without losing more than ½ psi. To be followed up by a testing report issued to government before arrival at Bonneville Dam Warehouse. 7 Acceptance Final inspection and acceptance will be completed at the Bonneville Dam Warehouse, Bonneville Lock and Dam, Cascade Locks, Oregon, 97014\. The project can be accessed via south entrance gate from Interstate 84\. Monday through Thursday 0700 to 1630, excluding federal holidays. Prior to shipment, the contractor shall notify the Bonneville Project POC a minimum of 2 days in advance. 

<!-- mobian-agent-ad sponsored="true" id="09851699-8cdb-4887-acea-978f0f2a2990" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/facility-related-materials?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Attachments

* [Attachment 1](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/735def86cd754604b6358cda0f6fd52d/download)
* [Attachment 2](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/74ed673bcc0244428950a1d7b93e4acc/download)
* [Attachment 3](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/acf62b3b85a4478792b8a22f7df3e20e/download)

## Contacts

* Robbie Newland
* Barbara V. Byam

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/67e41b6f470645f0a870686baad88cce/view)

[More from United States Department of the Army posted in September 2021](/dept%5Fof%5Fthe%5Farmy/archive/2021-09)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Small Business Set-Aside Government Contracts Available Now](/contracts/small-business)
* [Manufacturing Government Contracts Available Now](/contracts/manufacturing)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Thrust Bearing Coolers for BONNEVILLE LOCK \u0026 DAM, Oregon","description":"TECHNICAL SPECIFICATIONS Technical Specifications Thrust Bearing Coolers Bonneville Lock \u0026 Dam, Oregon 1 General Supply eight (8) complete thrust bearing cooler assemblies. Furnish all labor, material, and equipment to fabricate complete thrust bearing coolers. 2 References Thrust Bearing Oil Cooler, Drawing No. W57780070645_R3 3 Government Furnished Equipment (GFE) None 4 Submittals Provide initial shop/fabrication drawings for government to verify proposed design within 30 calendar days from date of contract award. 5 Specifications Provide eight complete Thrust bearing oil coolers assemblies based on dimensions shown in Thrust Bearing Oil Cooler, Drawing No. W57780070645_R3 Provide first article initial set of a thrust cooler to government test fit in a unit prior to fabrication of the remaining seven (7) units. Each cooler assembly shall consist of one right-hand and one left-hand section that are bolstered together at the split plate referenced on Drawing No. W57780070645_R3 on the top left corner as Split. The headers shall be constructed of 2 minimum Schedule 40 carbon steel pipe, ASTM A106 Grade B. The split plates shall be carbon steel, ASTM A516 Grade 70. Gaskets shall be 60 durometer neoprene. Hardware shall be zinc plated carbon steel, ASTM A516 Tubes shall be 5/8 OD x 0.049 minimum wall 90/10 copper-nickel, ASTM B111. Fins shall be 1.375 OD x 0.02 nominal thickness, aluminum 1100 fin, 9 fins per inch. Tube joints shall be rolled and brazed. Brackets shall be carbon steel L brackets with mounting holes. (10 brackets per cooler) ASTM A516 Connections shall be 2 Class 150 carbon steel ANSI flanges. All carbon steel surfaces coated with Glyptal 1202. All flange openings shall be covered for transit. Cooler assemblies to be shipped in wooden skids. 6 Testing and Inspection Preliminary inspection and hydrostatic test by USACE representative at place of manufacture will be required prior to delivery of first available complete assembly. Contractor shall notify Government of inspection at least 14 days prior to date of inspection. All cooler assemblies shall be hydrostatically tested at place of manufacturer by the Contractor before they are delivered. They shall be tested to 75 psi. The coolers shall hold this test pressure for 60 minutes without losing more than ½ psi. To be followed up by a testing report issued to government before arrival at Bonneville Dam Warehouse. 7 Acceptance Final inspection and acceptance will be completed at the Bonneville Dam Warehouse, Bonneville Lock and Dam, Cascade Locks, Oregon, 97014. The project can be accessed via south entrance gate from Interstate 84. Monday through Thursday 0700 to 1630, excluding federal holidays. Prior to shipment, the contractor shall notify the Bonneville Project POC a minimum of 2 days in advance.","url":"https://matchawards.com/dept_of_the_army/posts/106907251549966030","identifier":"W9127N21Q0111","category":"332410 - Power Boiler and Heat Exchanger Manufacturing","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"4420 - HEAT EXCHANGERS AND STEAM CONDENSERS"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.3 Facility Related Materials","url":"https://matchawards.com/categories/facilities-and-construction/facility-related-materials"}],"availabilityStarts":"2021-09-10","availabilityEnds":"2021-09-15","areaServed":"Cascade Locks, 97014","sameAs":"https://sam.gov/opp/67e41b6f470645f0a870686baad88cce/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Small business","item":"https://matchawards.com/contracts/small-business"}]}
```

