LOWER WICOMICO RIVER MAINTENANCE DREDGING, WICOMICO COUNTY, MARYLAND
- Status
- Closed (archived notice)
- Agency
- United States Department of the Army
- Office
- BALTIMORE, USA
- Notice type
- Solicitation
- Solicitation number
- W912DR21B0024
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Z1KF - MAINTENANCE OF DREDGING FACILITIES
- Category
- Facility Related Services (4.4)
- Posted
- 2021-09-09
- Deadline
- 2021-09-08
- Place of performance
- Salisbury, 21803
Description
************************************************************************************************************************************************** AMENDMENT 0003 - THIS SOLICITATION HAS BEEN CANCELED IN ITS ENTIRETY *************************************************************************************************************************************************** ABSTRACT OF BIDS ************ THIS IS AMENDMENT 0002. The purpose of this amendment is to: 1. Provide responses to the questions received during the Request for Information (RFI) period. 2. Provide a list of site vite attendees Attached is the list of Wicomico River Projects Site Visit Attendees ***** THIS SOLICITATION IS UNRESTRICTED ***** The scope includes the hydraulic dredging the lower half of the Wicomico River to its authorized depth of 14 feet (plus one foot of allowable overdepth). Approximately 120,000 cubic yards of silty material, with small pockets of sandy material, are to be dredged. Material will be placed beneficially for wetland restoration at the Deal Island Wildlife Management Area (WMA). Placement of material via pipeline will be utilized. Pipeline distance will be, on average, 8 miles, with a maximum pumping distance of 14 miles. The pipeline will travel through the Wicomico River and over land (approximately 4 miles) to reach the placement site. Wetland restoration is meant to increase migratory bird nesting habitat. The pipeline will be moved across the project placement areas to achieve the desired elevation. As such, careful attention to the prescribed elevation in placing the material is critical to the success of the project. Approximately 130 acres of land will be restored. Due to the location of the placement site being surrounded by water and the WMA impoundment, minimal land access is available with little to no access for heavy equipment from the land side of the project placement site. This project does not include containment structures or vegetation planting.Contacts
- Qiana Bowman-Spencer
- Gary Faykes
Email and phone are in the source notice.
More from United States Department of the Army posted in September 2021