ClickCease W912BV21R0036-Solicitation- Sluice Gate & Butterfly Valve Repair… | Closed - MatchAwards

W912BV21R0036-Solicitation- Sluice Gate & Butterfly Valve Repair at Oologah Lake, OK

Status
Closed (archived notice)
Agency
United States Department of the Army
Office
TULSA, USA
Notice type
Solicitation
Solicitation number
W912BV21R0036
NAICS
237990 - Other Heavy and Civil Engineering Construction
PSC
Z2KA - REPAIR OR ALTERATION OF DAMS
Category
Facility Related Services (4.4)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2021-08-24
Deadline
2021-09-10
Place of performance
Oologah

Description

AMENDMENT 0002 Amendment 0002 includes: 1. Deletes paragraph 2.1.3 Rubber Seals and Subparagraph 2.1.3.1 Fabrication in section 05 59 20 2. Deletes paragraph 3.3 Functionality test and replaces it in Section 05 59 20 3. Deletes Note 2 in paragraph notes and replaces it in Sheet ID S-202. 4. Adds "Gate Tower Lead-Based Paint and Equipment Sampling Results" as an attachment. AMENDMENT 0001 Amendment 0001 includes: 1. The addition of as-built drawings 2. The addition of bulkhead drawings 3. An updated CLIN Schedule 4. Updats the RFP as required SLUICE GATE & BUTTERFLY VALVE REPAIR, OOLOGAH LAKE, OK This project requires the contractor to furnish all plant, material, equipmenr, labor, instruments, tools, subcontractors, supervision, management and travel necessary to complete: 1. Develop and submit a crane placement plan for government approval. 2. Install bulkhead at the low flow intake. Develop and submit a diving plan. Inspect the butterfly valve and prepare a "butterfly valve inspection report". Repair butterfly valve based on repair procedures prepared by government based on inspection findings. 3. Repack knife valve stem. Blast and paint the gate valves to include the butterfly valve, knife valve, and all associated piping system and supports. 4. Inspect the service gate dogging device located at Bay #4 and prepare a "dogging device inspection report". Repair dogging device based on repair procedures prepared by government based on inspection findings. 5. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #4 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. Option 1 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #3 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. Option 2 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #2 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. Option 3 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #1 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW,installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. **See Attachements "Plans for Construction" and "Desgin & Permit Load Rating of Oologah Service Bridge"

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in August 2021

More lists