W912BV21R0036-Solicitation- Sluice Gate & Butterfly Valve Repair at Oologah Lake, OK
- Status
- Closed (archived notice)
- Agency
- United States Department of the Army
- Office
- TULSA, USA
- Notice type
- Solicitation
- Solicitation number
- W912BV21R0036
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Z2KA - REPAIR OR ALTERATION OF DAMS
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2021-08-24
- Deadline
- 2021-09-10
- Place of performance
- Oologah
Description
AMENDMENT 0002 Amendment 0002 includes: 1. Deletes paragraph 2.1.3 Rubber Seals and Subparagraph 2.1.3.1 Fabrication in section 05 59 20 2. Deletes paragraph 3.3 Functionality test and replaces it in Section 05 59 20 3. Deletes Note 2 in paragraph notes and replaces it in Sheet ID S-202. 4. Adds "Gate Tower Lead-Based Paint and Equipment Sampling Results" as an attachment. AMENDMENT 0001 Amendment 0001 includes: 1. The addition of as-built drawings 2. The addition of bulkhead drawings 3. An updated CLIN Schedule 4. Updats the RFP as required SLUICE GATE & BUTTERFLY VALVE REPAIR, OOLOGAH LAKE, OK This project requires the contractor to furnish all plant, material, equipmenr, labor, instruments, tools, subcontractors, supervision, management and travel necessary to complete: 1. Develop and submit a crane placement plan for government approval. 2. Install bulkhead at the low flow intake. Develop and submit a diving plan. Inspect the butterfly valve and prepare a "butterfly valve inspection report". Repair butterfly valve based on repair procedures prepared by government based on inspection findings. 3. Repack knife valve stem. Blast and paint the gate valves to include the butterfly valve, knife valve, and all associated piping system and supports. 4. Inspect the service gate dogging device located at Bay #4 and prepare a "dogging device inspection report". Repair dogging device based on repair procedures prepared by government based on inspection findings. 5. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #4 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. Option 1 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #3 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. Option 2 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #2 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW, installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. Option 3 1. Remove top and side seals and the roller assembly. Blast and paint the service gate located at Bay #1 to extents shown on contract drawings. After painting procedures, reinstall gate seals and roller assembly. Perform gate rehabilitation to include installing PE-UHMW,installing new weight ballasts, and adjusting the bottom seal to prevent leakage. Perform leakage tests. **See Attachements "Plans for Construction" and "Desgin & Permit Load Rating of Oologah Service Bridge"Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
Contacts
- Ryan Jacob Kelly
- Rudolfo J. Morales Jr.
Email and phone are in the source notice.
More from United States Department of the Army posted in August 2021