Repair Apron Joint Sealant Scott AFB IL
- Status
- Closed (archived notice)
- Agency
- United States Department of the Army
- Office
- SCOTT AFB, USA
- Notice type
- Solicitation
- Solicitation number
- W50S7S21R0001
- NAICS
- 236220 - Commercial and Institutional Building Construction
- PSC
- Z2BD - REPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS
- Category
- Facility Related Services (4.4)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2021-07-28
- Deadline
- 2021-07-30
- Place of performance
- Scott AFB, 62225
Description
Mod 10: Added 4th questions and answers. Mod 9: Added missing set of 3rd questions and answers. Clarifying: The Base Contracting Officer will be present in the Office from 1200 to 1300 (1PM) on 7/30/2021 in order to recieve hand delivered submissions. Mod 8: Added 3rd questions and answers and discussed submitting proposals. The 30th is a "flex day" for the wing. If hand delivering proposals on that day, contact Contracting Office directly to coordinate delivery such that your proposal is recieved timely. Mail also is not typically directly delivered to Contracting. Ensure mailed proposals have adequate time for hard copies to be delivered. Mod 7: Added 2nd questions and answers Mod 6: Added document AMDT W50S7S21R0001 - 0001. Removed Past Peformance subfactors. Removed requirement for Exhibit C. Mod 5: Added 1st questions and answers. Mod 4: Added site visit notes Mod 2 and 3: Changed document permissions and uploaded revised documents. Mod 1: Added drawings. Description of Proposed Construction: The work specified consists of furnishing all labor, equipment, tools, materials, travel, licenses, and permits required to complete the project. Contractor shall bid the project in two sections, Base and Option. The base bid will be to complete the following for Zone 1 and Zone 2. The option will be to complete the following for Zone 3. The work shall be completed in compliance with UFC 3-260-04 and USAF AFI 31-101 and updated to all other codes, instructions and regulations. The Magnitude of this project is between $250,000.00 and $500,000.00. Construction/contract completion time is anticipated to be 150 days after notice to proceed to include inspection and punch list. See attachments for full solication details. The date for the pre-proposal conference is 13 July 2021, 9:00AM local time at the 126th ARW at Scott Air Force Base, IL. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. A site visit will follow the pre-proposal conference. All questions for the pre-proposal conference must be submitted by 1 July 2021 via email (preferred) to 126.ARW.MSC.Org@us.af.mil.Contacts