Horizontal Region 3 - Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
- Status
- Closed (archived notice)
- Agency
- United States Department of the Army
- Office
- ARLINGTON, USA
- Notice type
- Solicitation
- Solicitation number
- W9133L-21-R-6012
- NAICS
- 541330 - Engineering Services
- PSC
- C211 - ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING
- Category
- Construction Related Services (4.2)
- Set-aside
- Partial Small Business Set-Aside (FAR 19.5)
- Posted
- 2021-06-21
- Deadline
- 2021-06-29
Description
UPDATE 21 June 2021: See Amendment 002 attached. All changes to the Synopsis are in the document "W9133L-21-R-6012 Synopsis - Amendment 002 20210621". Changes to the synopsis are shown as stricken text and highlighted text. Please see important note regarding acknowledgement of amendments. UPDATE 17 June 2021: See "Attachment 3 - Synopsis RFI Responses 20210617" for RFIs 13-17. An amendment will be issued soon to incorporate changes resulting from RFIs 15 and 17 and other important changes. The proposal due date is extended to 29 Jun 2021 03:00 pm EDT. UPDATE 08 June 2021: See "Attachment 2 Synopsis RFI Responses 20210608" for RFIs 1-12 and Synopsis Amendment 0001. All changes to the Synopsis are in the document attached "W9133L-21-R-6012 Synopsis Amendment 0001 20210608". Changes to the synopsis are shown as stricken text and highlighted text. Please see important note regarding acknowledgement of amendments. INDEFINITE DELIVERY TYPE ARCHITECT ENGINEER (A-E) CONTRACT FOR THE NATIONAL GUARD BUREAU IN SUPPORT OF THE AIR AND ARMY NATIONAL GUARD HORIZONTAL CONSTRUCTION PROGRAMS THROUGHOUT THE REGION 03 CONTRACT INFORMATION: The National Guard Bureau is soliciting for Non-Personal Architect-Engineer (A-E) Services in accordance with Public Law 92-582 (Selection of A-E Statute) and Federal Acquisition Regulation (FAR) Part 36. As a result of this announcement, the National Guard Bureau intends to award a target of three (3) Indefinite Delivery Indefinite Quantity (IDIQ) contracts with one (1) solicited as Other than Small Business (i.e. unrestricted) and two (2) to be reserved for small business concerns, if there is adequate competition in accordance with FAR 36.602. These contracts will provide Horizontal A-E services in support of Air National Guard (ANG) and Army National Guard (ARNG) mission requirements located throughout Region 03, which includes Arizona (AZ), California (CA), Colorado (CO), Idaho (ID), Illinois (IL), Iowa (IA), Minnesota (MN), Montana (MT), Nebraska (NE), Nevada (NV), New Mexico (NM), North Dakota (ND), Oregon (OR), South Dakota (SD), Utah (UT), Washington (WA), Wisconsin (WI), and Wyoming (WY). The total capacity of the three (3) contracts is $60 million. This capacity will be shared among all firms. The Government may award more contracts within each business category (i.e. Small Business or Other than Small Business) depending on the source selection decision regarding how many firms are considered the most highly qualified per the 2014 Selection of A&E Contracts Act selection procedures. Each IDIQ will be for a five (5) year ordering period from the date of award of all contracts. Guidelines for competition of task orders: Non-Complex A-E task order requirements with a Programmed Amount (PA) less than $3M must be set-aside for competition among the reserved Small Business Firms Non-Complex A-E task order requirements with a Programmed Amount (PA) above $3M may be competed among all IDIQs Complex A-E task order requirements with a Programmed Amount (PA) less than $3M may be competed among all IDIQs Complex A-E task order requirements with a Programmed Amount (PA) above $3M may be reserved to the Unrestricted IDIQ The following definitions apply to the Horizontal Requirements: Complex work is defined as projects that include uncommon characteristics (such as control systems, arresting systems, new construction airfield pavements, micro-grids, utility stations, or other similar uncommon characteristics) or work that requires significant planning or siting. Non-Complex is defined as any requirement that does not fit the definition of Complex. All firms responding to the announcement will be required to identify which category they are submitting. All firms will be required to state the words, "Small Business", or "Other than Small Business" after the solicitation number in PART I, A, Block 3 of Standard Form 330. Firms will be required to submit a separate SF 330 for each category in which the firm wants consideration. No one firm will receive more than one award as a result of this solicitation. The North American Industry Classification System (NAICS) code for this action is 541330. The Small Business size standard is $16.5M in average annual receipts of a businesss latest three fiscal years. Small businesses are encouraged to team with other businesses. These are not requirements contracts. The contract will consist of two (2) ordering periods; one (1) ordering period will be for five (5) years and one (1) optional ordering period for six (6) months with a total contract ceiling of $60M for the entire program. The total contract period shall not exceed five (5) calendar years and an option to extend six (6) additional months. Task orders will be primarily for projects with a construction value typically between $100K and $90M, however, as required, larger and/or smaller projects may be executed. The minimum total fee guaranteed to each contract awardee is $2,500.00. Order limitations are as follows: The Contractor is not obligated to honor (1) any order for a single item above $18M or (2) any order for a combination of items over $20M. Work will be issued by negotiated firm-fixed price task orders. Projects to be designed are not yet determined and funds (except those reserved for the minimum fee guarantee) are not presently available. The selection of A-E firms is based on professional qualifications necessary for the performance of the required services (rather than competitive bidding procedures). All A-E firms are cautioned to review the restrictions of FAR 9.5 Organizational and Consultant Conflicts of Interest and FAR 36.209 Construction Contracts with Architect-Engineer Firms. Any A-E firm that prepares a Design-Build Request for Proposal for a particular project will be restricted from participating in any contract or task order for the Design-Build of that particular project. All interested Architect-Engineers are reminded that, under the provisions of PL 95-507, they will be expected to place subcontracts to the maximum practicable extent consistent with the efficient performance of the contract with small and small disadvantaged firms. Large business firms that intend to pursue an IDIQ contract must convey their intent to meet the minimum small business goals on the SF330, Section C, by identifying subcontracting opportunities with small businesses. Minimum goals for this procurement are: Small Business (all types of small business combined) 14%; Small Disadvantaged Businesses 3%; Woman Owned Small Business 5%; HUBZone Small Business 1%; Veteran-Owned Small Business 3% and Service Disabled Veteran Owned Small Business 3%. If selected as the most highly qualified firm, the large business offeror will be required to submit a Small Business Subcontracting Plan following FAR 52.219-9 and DFARS 219.704/705 as a part of the Request for Proposal Package. The subcontracting plan is NOT required with the SF330 submittal. Small Business firms that are selected under the Small Business set aside must perform 50 percent of the contract performance by the prime or a similarly situated Small Business subcontractor in accordance with Deviation 2020-O0008. If selected as the most highly qualified firm, the large business offeror will be required to submit a Small Business Subcontracting Plan following FAR 52.219-9 and DFARS 219.704/705 as a part of the Request for Proposal Package (RFPP). The subcontracting plan will be based on subcontracting dollars. The subcontracting plan is NOT required with the SF330 submittal. The wages and benefits of service employees (FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Service Contract Act. This is a multiple award effort with the most-highly qualified firm in the Small Business group and the most-highly qualified firm in the Unrestricted group receiving their RFPPs first. Once that process is complete, the next most highly qualified firm will be provided their RFPP, and so on. In accordance with 40 USC 11, Selection of Architect and Engineers, the negotiation process will continue until an agreement is reached and all contracts are awarded. PROJECT INFORMATION: Anticipated A-E services for Region 3 may include but are not be limited to performance of planning, and program support; A-E investigative and design services including development of construction documents; construction support; engineering and environmental studies, National Environmental Policy Act (NEPA) documentation; investigations and surveys in support of the Air and Army National Guard Programs. Typical work may include, but is not specifically limited to: A: the preparation of plans, specifications, calculations, and cost estimates; B: the development of cost management, quality control and quality assurance plans; C: construction inspection, testing and management services; D: development of engineering standards; E: preparations for design submissions; F: technical, economic, planning, environmental remediation, value engineering and other studies, analyses, surveys, investigations, and reports; G: development of performance criteria for bridging documents for design build projects; H: development of documents to support various government construction programs. Services may also include, but are not limited to, a wide variety of professional services in support of projects for horizontal infrastructure to meet the needs of the National Guard. Various projects may include services associated with National Guard installations/facilities, such as Pavements to include Airfield, Roads, parking lots and Sidewalks, Aircraft Arresting Systems, munitions maintenance and storage facilities, Utilities (Water, Sewer, Electrical, Natural Gas, Storm Drainage), running tracks, Fencing and gates, Exterior lighting for parking and airfields, Oil Water Separators, Automated Record Fire Ranges, Gunnery Complex, Clear Zones, Bridges, Generator connections for facilities, Smart Meters, Barriers, Lightning Protection Systems, Reservoirs, Fall Protection Fire Loops, Fuel systems and other support facilities. Additionally, task orders may be issued for support services, which require A-E Services as defined in FAR 2.101. SELECTION CRITERIA: The selection criteria are listed below in descending order of importance (first by major criterion and then by each sub-criterion). Criteria A Professional Qualifications necessary for satisfactory performance of required services (SF330, Part I, Section E): The selected firm must have, either in?house or through consultants, all disciplines listed for this criteria and must provide resumes in Part I, Section E, of the SF330. Resumes shall not exceed two (2) pages each. All engineers, architects and the project manager must have the following in the role they are assigned to on the project team: a Bachelors degree, professional registration, and at least five (5) years of relevant experience. The Government may provide additional consideration for special training or certifications, additional registrations, higher level of education degrees, and/or years of experience that exceeds the five-(5) year minimum requirement: (1) Civil Engineer; (2) Geotechnical Engineer; (3) Project Manager (4) Electrical Engineer; (5) Surveyor, registered professional land surveyor with 5 years of relevant experience; (6) Environmental Engineer; (7) Mechanical Engineer; (8) Structural Engineer; (9) Geologist with a Geology or physical scientist Bachelors degree, with 5 years experience and a Certified Professional Geologist (CPG) from the American Institute of Professional Geologists (AIPG); (10) Cost Estimator; Bachelors degree, the cost engineering specialist(s) must be certified by a professional organization, such as AACE, International Costs Engineering Council (ICEC), or Professional Construction Estimators Association . The firm's and/or consultant's cost engineering or estimating specialist(s), must be specifically identified and their competence indicated by resume(s); (11) Fire Protection Engineer (must have an ABET accredited engineering degree and current registration in the field of Fire Protection Engineering within the United States or its territories, having passed the National Council of Examiners for Engineering and Surveyors (NCEES), and at least five (5) years of relevant experience); (12) Communications Specialist (Registered Communications Distribution Design (RCDD)); (13) Corrosion Engineer (Registered National Association of Corrosion Engineers (NACE)) Certified Corrosion Specialist, NACE Certified Cathodic Protection Specialist (CP4), or registered professional corrosion engineer); (14) Landscape Architect with a landscape architecture degree and registration in landscape architecture. **Note that the government will consider more favorably team members with Design Build Institute of America (DBIA) certification and Building Information Modeling (BIM) competence certifications. These will be credited with a strength. If an individual will serve in more than one discipline then those disciplines shall be clearly indicated in Block 13, PART I, Section E. Resumes (Section E of the SF 330) must be provided for all disciplines, including consultants. In the resumes under Project Assignments, use the same discipline nomenclature as is used in this announcement. The evaluation will consider education, training, registered professional qualifications within the 54 states and territories of the United States, and relevant individual experience in the type work required, and longevity with the firm. Criteria B Specialized Experience and Technical Competence in the type of work required, including, as appropriate, experience in sustainable design, energy conservation, pollution prevention, waste reduction, and the use of recovered materials (SF330, Part I, Section F): The offeror shall provide a maximum of ten (10) projects in total within the past six (6) years preceding the date of this announcement for both, the prime firm and subcontractor(s) in PART I, Section F, of the SF330. Examples of projects shall not exceed two (2) pages each. If any portion of the work provided as specialized experience is subcontracted, clearly identify that work as such and provide the required experience of that subcontractor as it relates to work the subcontractor is to perform for this solicitation. If the offeror is a joint venture, each firm shall provide information demonstrating experience relevant to their role on this project. A Project is defined as a single, stand-alone contract and/or a single task order issued under an existing IDIQ contract(s) unless the project included multiple phases and was issued under more than one contractual order. It shall be noted that an IDIQ contract is not a project. Do not combine multiple task orders unrelated to a stand-alone project to create a single project example. Combining multiple task orders under an IDIQ to create a single project will not be compliant with the solicitation criteria, and it will not be evaluated or considered. The contract number or IDIQ number and individual task order number associated with the project in the title must be included for each of the projects. If the project is not 100% complete, note the current percentage and estimated date when the project will be completed for each contract and/or task order. Firms shall only submit projects as evidence of experience if those projects are at a minimum beyond B1/65% design submission for Type A/B experience, and at a minimum 50% complete on construction for Type C experience. Include the percentage of work self-performed by the prime for each contract and/or task order. If proposing as a JV, ascribe the percentage of work self-performed by each Joint Venture member. The offeror and/or subcontractors must demonstrate experience in the following areas with narrative and by average revenue in part II where indicated: (1) Airfield Pavements - Experience in planning, programming, design and construction surveillance of military airfields such as runways, taxiways, and aprons, including airfield lighting systems, pavement markings, unreinforced portland cement and asphalt cement concrete pavements, drainage layers, and visual air navigation aids (2) Subterranean Utilities experience in design and construction management of water mains, sanitary and storm sewers, medium and high pressure gas mains, electrical distribution including switchgear, and primary distribution underground telecommunications distribution, and fire distribution mains. Additional consideration may be given to those with electrical distribution experience at the following ratings: 12.47 kV, 13.2 kV, or 13.8kV. (3) Transit pavements - experience designing and managing construction of roadways, intersections, bridge and culverts, and parking lots including curb, gutter, storm water collection, drainage and management of run-off. (4) Technical Knowledge, Competence & Experience using DOD UFC and associated UFGS, highlighting any expertise with UFCs 3-260-01; 3-260-02; 3-230-01; 3-240-01; 3-250-01; 3-250-08FA; 3-535-01; 3-550-01; 3-570-01 or other horizontal project requirements; (5) Engineering experience in preparing permit applications relating to construction projects with the various permitting agencies; (6) Performance of surveying and mapping in accordance with A/E/C CADD Standards and nondestructive techniques for locating underground utilities; (7) Demonstrate experience using projects and program management tools such as Newforma, Primavera, Submittal Exchange, ProjectWise, iPDWeb or similar systems; (8) Demonstrate experience (Profile Code C15 and T02 in Part II) in evaluating contractor's submittals, request for change, request for information, and performing construction surveillance; (9) Demonstrate experience with preparing the technical portions of a Design-Build Request for Proposal package for performance-based design-build; Discuss your techniques to control costs, scope, schedule and ensure safety (10) Demonstrate experience in design and survey for abatement of buried asbestos (such as found insulating abandoned steam lines), PFOS/PFOA from AFFF, and the handling/disposal of other toxic and regulated substances; (11) Demonstrate experience with NEPA, it's process and requirements as well as preparation of required documentation; (12) In Block H of the SF 330 describe the firm's quality management plan, including quality assurance process, the project final design estimate compared to the initial construction bid amount, coordination of the in?house work with consultants, and prior experience of the prime firm and any significant consultant. To be considered relevant, all experience demonstrated shall be within five (5) years of the date of this solicitation. In Section H of the SF 330, describe the firm's quality management plan, including quality assurance process, coordination of in?house work, coordination with consultants, and prior experience of the prime firm and significant consultants or partner firms. Demonstrate project design?to?bid performance showing final design estimate and compared it to initial awarded bid amount. Provide explanations for any variance greater than 5%. Criteria C ? Capacity to accomplish multiple task orders in the required time (SF330, Part I, Section F): Firms must have the capacity to proceed with work and accomplish it promptly once a notice to proceed is issued and accomplish it prior to scheduled completion dates, including emergency response. Firms must demonstrate the ability to accomplish multiple task orders simultaneously. The evaluation will consider the prime availability of an adequate number of key personnel, equipment, and the extent of in-house facilities versus subcontracting needs. The A-E should submit evidence in the SF330 Part I, Section H, to supportAttachments
Contacts
- Lisa Burns
- Karla Garcia
Email and phone are in the source notice.
More from United States Department of the Army posted in June 2021