<!-- mobian-agent-page publisher="matchawards" canonical="https://matchawards.com/dept_of_the_army/posts/106295722013789914" -->

---
title: Cheyenne Mountain Air Force Station - Generator Replacement | Closed - MatchAwards
description: Cheyenne Mountain Air Force Station - Generator Replacement. United States Department of the Army. Solicitation W9128F21R0063. NAICS 541330 - Engineering Services. Deadline 2021-06-09. SYNOPSIS ARCHITECT-ENGINEER (A-E) SERVICES FOR CHEYENNE MOUNTAIN AIR FORCE STATION DESIGN FOR GENERATOR...
canonical: https://matchawards.com/dept_of_the_army/posts/106295722013789914
og:image: https://matchawards.com/home_logo.png
og:image:width: 130
og:image:height: 130
twitter:card: MatchAwards.com
twitter:image: https://matchawards.com/home_logo.png
og:site_name: MatchAwards
og:type: article
og:title: Cheyenne Mountain Air Force Station - Generator Replacement | Closed
og:url: https://matchawards.com/dept_of_the_army/posts/106295722013789914
og:description: Cheyenne Mountain Air Force Station - Generator Replacement. United States Department of the Army. Solicitation W9128F21R0063. NAICS 541330 - Engineering Services. Deadline 2021-06-09. SYNOPSIS ARCHITECT-ENGINEER (A-E) SERVICES FOR CHEYENNE MOUNTAIN AIR FORCE STATION DESIGN FOR GENERATOR...
og:image: https://matchawards.com/system/accounts/avatars/000/000/092/original/04da5de8c6ff714b.png?1638996022
og:image:width: 120
og:image:height: 120
twitter:card: summary
---

# Cheyenne Mountain Air Force Station - Generator Replacement

Status

Closed (archived notice)

Agency

[United States Department of the Army](/dept%5Fof%5Fthe%5Farmy)

Office

OMAHA, USA

Notice type

Combined Synopsis/Solicitation

Solicitation number

W9128F21R0063

NAICS

[541330 - Engineering Services](/groups/897)

PSC

C219 - ARCHITECT AND ENGINEERING- GENERAL: OTHER

Category

[Construction Related Services (4.2)](/categories/facilities-and-construction/construction-related-services)

Posted

2021-05-25

Deadline

2021-06-09

Place of performance

Colorado Springs, 80914

## Description

SYNOPSIS ARCHITECT-ENGINEER (A-E) SERVICES FOR CHEYENNE MOUNTAIN AIR FORCE STATION DESIGN FOR GENERATOR REPLACEMENT AND REPAIR DIESEL RESERVOIR THE U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT 19 May 2021 General Information: Document Type: COMBINED SYNOPSIS/SOLICITATION NOTICE Solicitation Number: W9128F-21-R-0063 Posted Date: 19 May 2021 Amendment: 0001 (25 May 2021) Original Response Date: 9 June 2021 (2:00 PM MST) Classification Code: C  Architect and Engineering Services 1\. CONTRACT INFORMATION: This contract is being procured in accordance with the Selection of Architects and Engineers statute previously known as the Brooks A-E Act, as implemented in FAR Subpart 36.6\. One firm will be selected for negotiation based on demonstrated competence and qualifications for the required work. The services will consist of 100% design and construction documents for Cheyenne Mountain Air Force Station (CMAFS) Generator Replacement and Diesel Reservoir Repair as described in project information. North American Industrial Classification System code is 541330, which has a size standard of $16,500,000 in annual average gross receipts over the past three years. This announcement is open to both Small Business (SB) and Other than Small Business (OTSB) A-E firms. Both SB and OTSB Offerors will be evaluated on the extent of participation of small business community (SBC) members in the performance of the acquisition. Offerors are required to meet the minimum mandatory total small business participation objective/target of 10% of total acquisition value to SBC members. Offerors proposing a higher objective/target than 10% may receive a more favorable evaluation for the appropriate evaluation factor. SBC members can propose work they will self-perform toward small business participation objectives. The small business subcontracting goals for this acquisition will be calculated based on the apparent successful Offeror(s) proposed small business participation objective (i.e. target percentage) of total acquisition value. The Subcontracting Plan is NOT required with this submittal. If a OTSB is selected for this contract, it must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan on that part of the work it intends to subcontract. The subcontracting plan is not required with this submittal. The following informational subcontracting goals are to be considered: Award approximately 10% of the total subcontracting dollars to all SB concerns. The subcontracting plan is not required with this submittal but will be required with the fee proposal of the firm selected for negotiations. Selected and successful firm(s) will be required to comply with the subcontracting limitations as set forth by the FAR Clause 52.219-14 LIMITATIONS ON SUBCONTRACTING, wherein stated in pertinent part, "Services (except construction). The wages and benefits of service employees (see FAR 22.10) performing under these contracts must be at least equal to those determined by the Department of Labor under the Service Contract Act. Service wage rates will be determined relative to the employee's office location rather than the location of work. Additionally, in accordance with FAR Part 22.1303, all firms must complete their VETS-4212 report. Information can be found at the Department of Labor website https://www.dol.gov/agencies/vets/programs/vets4212, or call the service center at 1-866-237-0275; you will be asked to provide your company name, employer identification number (EIN), and DUNs number. Contract award is anticipated for September 2021\. To be eligible for contract award, the Contractor must be registered in the System for Award Management (SAM). Registration is free and can be accessed at: https://betaSAM.gov. Ensure representations and certifications in SAM are current. 2\. PROJECT INFORMATION: The A-E selected will be required to have sufficient staff, relevant knowledge and expertise, flexibility, and capability to provide a 100% design and construction documents for the CMAFS Generator Replacement and Repair Diesel Reservoir. A-E services may provide program of requirements development to include all required engineering studies for proper sizing and integration of the replacement units. Project Details: The following information represents the various project objectives as they are currently known. (a) Develop a design for replacing the six existing generators with an N+2 system capable of generating 12 Megawatts (MW) and Tier 2 emission compliant. (b) The design shall include a circulation system to prevent fuel stagnation within existing diesel fuel reservoir. As part of the design, the A-E shall evaluate the need for a water mitigation system to prevent ground water from seeping into the reservoir and the need for a diesel fuel polishing system. (c) The A-E shall evaluate the existing power plant major mechanical support systems and determine whether these systems can accommodate the operational requirements of the new generator sets. These systems include but are not limited to, material handling systems, lube oil heat exchanger, space cooling, industrial cooling, jacket water cooling, combustion air, exhaust cooling systems, fuel oil system, fire protection, industrial control system (ICS), electrical distribution, and diesel intake/exhaust. (d) The significant weight difference between the old generators and the new generators, including any changes in locations of the generators shall be evaluated for potential impacts on the spring and damper system supporting the Generator Bay. (e) The new generators will need remote and localize control systems. (f) The design shall require sequencing of the work such that one existing generator is removed followed by the installation, testing, and acceptance of one new generator, in order to maintain adequate electrical capacity from the generator system, at all time. Removal of existing generators and installation, testing, and acceptance of new generators shall continue, one at a time, until all new generators are installed, tested, and accepted. (g) The design shall address outdated fuel storage and provide a solution for the location(s) of the day tank(s) which meet(s) current building and fire codes while meeting operational requirements and maintaining reliability, sustainability, and survivability. (h) The new generators shall use industrial cooling systems and heat rejection systems. (i) The design shall address and provide for the combustion air and exhaust piping for the new generators. (j) The design shall address testing and commissioning of the new generators, generator control systems and all new ancillary systems and equipment. (k) The A-E shall perform a constructability analysis. The generator plant and diesel fuel reservoir must remain functional and ready for operation during the construction phase of this project. This will require the new and old systems being operational in parallel, including the control system(s). The design must determine the recommended means for maintaining the power plant operations and incorporate them into the construction requirements. In addition, the constructability analysis must conduct a structural and dynamic analysis of the generator building when adding equipment as well as the impact of additional weight (or reduced weight) on the springs and damper system. The analysis shall also include required designs for the hoists systems to remove the old generators and install the new generators. The analysis shall also evaluate and validate the existing power plant control systems have adequate capacity to control all new systems from this project. (l) Field investigations required to understand, interpret, and analyze existing systems and their condition, serviceability, and adequacy, especially as it pertains to capacity needs and integration with new design. (m) For every phase of the design the A-E shall provide up to date construction estimates for the project. (n) The existing fire sprinkler system that is in the present generator areas shall be evaluated for code compliance. In addition, the fire sprinkler systems shall be removed and replaced as necessary to remove and install the new generators. The revised sprinkler system shall be updated as necessary to handle the size and generation capacity of the new generators. (o) A fire and life safety analysis shall be conducted for the generators, diesel fuel tanks, and generator enclosures. The generator enclosure, diesel fuel tanks shall be made code compliant with current editions of National Fire Protection Association (NFPA) 101, and Unified Facilities Criteria (UFC). (p) The diesel fuel tanks shall be evaluated and any leaks into the potable water system shall be fixed. Estimated Construction Cost (ECC): The current ECC is approximately $63,400,000.00\. Ref. DFARS 236.204 Disclosure of Magnitude. Anticipated Construction Strategy: It is expected the Government will issue a Design-Bid-Build stand-alone construction contract after successful completion of the design. Construction cost estimating will be accomplished for all design projects using the Micro-Computer Aided Cost Estimating System 2nd Generation (MII) software. All specifications shall be developed and edited using the SpecsIntact automated specification processing system. Firms should demonstrate experience with using and writing project specifications in the SpecsIntact processing system. The A-E shall use advanced modeling practices in conjunction with an integrated design approach to complete the project design. Advanced modeling is a subset of geospatial technologies as defined EM-1110-1-2909 GEOSPATIAL DATA AND SYSTEMS to include Building Information Modeling (BIM), Civil Information Modeling (CIM), Geographic Information Systems (GIS), and Computer-Aided Drafting (CAD). Required technologies, design deliverable, and bid set (electronic and hardcopy) format and requirements will be further described in the request for proposal (RFP). The A-E shall document their advanced modeling approach in an Advanced Modeling Project Execution Plan (PxP), submitted to the government for approval. Each PxP shall document advanced modeling practices, roles, and responsibilities for each project, as well as reiterate the technologies, formats, modeling standards, quality control procedures, and deliverable requirements dictated by each task order. The A-E shall have a robust knowledge of advanced modeling strategies, standards, and practices and shall be capable of delivering designs using a variety of tools and technologies to meet each set of task order deliverable requirements. Sustainable design shall be accomplished using an integrated design approach and emphasizing environmental stewardship; energy and water conservation and efficiency; use of alternative energy; use of recovered and recycled materials; waste reduction; reduction or elimination of toxic and harmful substances in facilities construction and operation; efficiency in resource and materials utilization; and development of health, safe and productive work environments. Integration of Federal and agency energy and sustainability mandates is required on all building facilities. Design and documentation shall utilize United States Green Building Council (USBGC), Leadership in Environmental and Energy Design A-E evaluation, Green Building Certification Institute, and Green Globes web-based certification methodology. The A-E may also be required to perform and/or evaluate sustainability and energy audits. Integration of current Antiterrorism and Force Protection (AT/FP) measures will be required. A-E will be required to design and specify cybersecurity measures for project control systems. The A-E will be required to use the DR Checks design review and checking system. 3\. SELECTION CRITERIA: The selection criteria are listed below in descending order of importance. Criteria a through e are primary. Criteria f through h are secondary and will only be used as a tie-breaker among firms that are essentially technically equal. Specialized Experience and Technical Competence Professional Qualifications Past Performance Capacity Knowledge of Locality SB/SDB Participation Geographic Proximity Volume of DOD Contract Awards PRIMARY CRITERIA: a. Specialized Experience and Technical Competence. Submittals shall demonstrate the specialized experience and technical competence to execute the types of project and activities as indicated above in paragraph 2, PROJECT INFORMATION, and in the bullet items below. Only relatable experience on completed construction projects or completed designs from the last five years should be included in the submittal. All projects cited shall identify design start/complete dates as well as the project size (construction cost, A-E fee, and scope). (SF 330, Part I, Section F) Experience in horizontal and vertical design of projects representative of those listed in paragraph 2\. PROJECT INFORMATION; Experience with the generator size and functions listed in paragraph 2\. PROJECT INFORMATION, and experience with an integrated campus approach that would provide connectivity between Electrical and Power Distribution Engineering including Generators, Controls, SCADA, Medium Voltage, Underground/Overhead, Communications, System Modeling, Field Data Collection/Validation as applied to System Modeling, Start Up/Testing and Commissioning.; System interconnectivity, phasing of new and existing power, and downstream impacts; Experience with construction phase services including participation in on-site partnering/pre-construction meetings; review of construction contractor's submittals for government approval and for information only; participation in site visits and furnishing inspection reports at critical points of construction; participation in start-up and commissioning of systems; attending warranty inspections; participation in lessons-learned sessions; preparation of operations and maintenance support information manuals; Experience with preparing specifications using SpecsIntact software and Unified Facilities Guide Specifications (UFGS); Experience with preparing cost estimates using Micro-Computer Aided Cost Estimating System 2nd Generation (MII) software; Experience with Department of Defense AT/FP design criteria and construction standards; Experience applying Advanced Modeling practices in conjunction with an integrated design approach to include BIM, CIM, GIS, CAD, and Facility Power Distribution System Modeling.; Experience with Sustainable Design and High Performance Sustainable Building design and construction concepts including energy efficiency, use of recovered materials, waste reduction, and pollution prevention, and using the third-party sustainability evaluation and certification process; Experience with Spatial Data Facilities Infrastructure (SDSFIE) and/or GEOBASE deliverables and standards. Experience with life safety and fire protection design of military facilities. b. Professional Qualifications. Firms shall demonstrate professional personnel qualifications and specialized experience in the design of generator replacement for key design disciplines. Key disciplines required to be performed by registered and licensed professionals are as follows: project management, facility planning, mechanical, electrical, fire protection, building commissioning, structural, Anti-Terrorism/Force Protection (AT/FP), communications engineering, cost estimating, geotechnical, sustainability manager, and land surveyor. Evaluation of these disciplines will consider education, training, relevant experience in design of power generation facilities, and longevity with the firm. Any past design and/or planning experience on USACE and Air Force military projects should be identified (SF 330, Part I, Sections E & G). All roles should show a minimum of ten (10) years of experience unless otherwise noted. Security Requirements: Firms shall provide resumes for the below personnel that can pass a National Agency Check with Inquiries (NACI) / T-1 background checks to get required access badges. Post award AE survey activities may require entrance into spaces that need a minimum of a Secret Clearance. AE firm shall declare a minimum of two designers that meet this clearance level in resumes below. Provide resumes for one (1) project managers (team leader) registered as a Professional Engineer or Architect. Provide resumes for one (1) designer in each of the following fields: structural (independent of civil), mechanical, and electrical engineering with each field professionally registered in the relevant professional field as an engineer. Provide a resume for one (1) designer in the Anti-Terrorism/Force Protection field. Designer shall be a registered Professional Engineer and have at least ten (10) years of experience and training related to compliance with Department of Defense AT/FP policy, standards and specifications. Provide a resume for one (1) designer in each of the following fields: life safety, facility planning, geotechnical (soil engineering); and communication distribution design (RCCD). Provide a resume for one (1) cost engineer with at least ten (10) years of experience as a cost engineer. Additional consideration will be given if the individual has a cost estimator professional certification. Provide a resume for one (1) commissioning authority (CxA) to lead the commissioning team. The CxA may be a mechanical or an electrical engineer and shall be a registered professional with a minimum of ten years of heating, ventilation, and cooling or lighting and power distribution design experience and shall have documented experience as a CxA on at least three projects. The Commissioning Agent should have experience with power plants including large generators. They should also have sufficient knowledge of implementation of cybersecurity measures. The CxA must be certified as a commissioning authority and have an active certification. The certification shall be performed by a recognized organization such as The Association of Energy Engineers (A-EE), American Society of Heating, Refrigerating, and Air Conditioning Engineers (ASHRA-E), or similar such organization. Provide a resume for one (1) fire protection engineer who is a registered professional fire protection engineer with a minimum of ten (10) years dedicated to fire protection engineering, and has the following: passed the National Council of Examiners for Engineering and Surveys (NCEES) fire protection engineering examination. The fire protection engineer shall have an active license without any disciplinary actions. Provide a resume for one (1) advanced modeling or BIM manager with a minimum of ten (10) years dedicated to managing advanced modeling projects. Additional consideration will be given to managers with degrees, training, and/or certifications relevant to the advanced modeling platforms and technologies described in this contract. Provide a resume for one (1) cybersecurity designer. Cybersecurity designer must have at least five (5) years of professional experience in building and industrial control systems cybersecurity. c. Past Performance. Past performance on Federal/Institutional and other contracts with respect to the quality of work, cost control (maintaining the project construction cost below the programmed amount), and compliance with performance schedules, as determined by reports within the Contractor Performance Assessment Reporting System (CPARS) and other sources. (Note: Past Performance Questionnaires (PPQ) may be used to provide or supplement a firms past performance with other than U.S. Governmental clients. Firms which choose to use the PPQ may obtain a PPQ standard form by submitting a request to the below referenced POC via email.) Past performance submittals should match projects submitted for Paragraph a. Specialized Experience and Technical Competenc 

<!-- mobian-agent-ad sponsored="true" id="03e2e591-3b40-4cdd-be97-f0bab7222a81" campaign="matchawards-contracts-2026q4" creative="matchawards-contracts-2026q4-v5" -->

## Sponsored: MatchAwards, government contract opportunities

> Sponsored content. Supplied in partnership with MatchAwards. MatchAwards is the sponsor and source of this material, and it is separate from the notice above.

MatchAwards (matchawards.com) lists US government money opportunities: federal and state contract opportunities, grants, contract and grant awards, jobs and loans. Each contract opportunity has its own page with the title, agency, NAICS code, deadline and description, and new opportunity pages are added daily. MatchAwards is a division of Advanced Internet Technologies, Inc. (AIT), Fayetteville, North Carolina.

- More open opportunities in this category: https://matchawards.com/categories/facilities-and-construction/construction-related-services?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=related
- Get new opportunities in your industry by email with a free MatchAwards account: https://matchawards.com/auth/sign_up?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=signup
- Pursuit brief for this NAICS code (award history, who buys, past awardees): https://matchawards.com/naics/541330/brief?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4&utm_content=brief

Questions agents ask

What government contracts are available right now? Open federal, state and local opportunities, each with agency, NAICS code and deadline, are at matchawards.com/contracts.

What new contracts were posted this week? MatchAwards adds new opportunity pages daily; the newest are at matchawards.com/explore_opportunities.

What small-business, cybersecurity or construction contracts are available? Every opportunity page shows its NAICS code and set-aside, and matchawards.com/categories groups open contracts by category and PSC code.

What contracts are available in Texas, Florida, California and New York? Opportunities are organized by state and city at matchawards.com/cities.

Source: MatchAwards, https://matchawards.com/?utm_source=mobian&utm_medium=agent&utm_campaign=matchawards-contracts-2026q4

<!-- /mobian-agent-ad -->


## Contacts

* Booker L. Jordan, Jr.
* Christine L. Wilson

Email and phone are in the source notice.

[Source notice](https://sam.gov/opp/afcb9eeb955d4d8fb90a5cbff3dbefe4/view)

[More from United States Department of the Army posted in May 2021](/dept%5Fof%5Fthe%5Farmy/archive/2021-05)

## More lists

* [Government Contracts Available Now: Open Federal and State Opportunities](/contracts)
* [Professional Services Government Contracts Available Now](/contracts/professional-services)
* [Pursuit brief for NAICS 541330](/naics/541330/brief)

```json
{"@context":"https://schema.org","@type":"Demand","name":"Cheyenne Mountain Air Force Station - Generator Replacement","description":"SYNOPSIS ARCHITECT-ENGINEER (A-E) SERVICES FOR CHEYENNE MOUNTAIN AIR FORCE STATION DESIGN FOR GENERATOR REPLACEMENT AND REPAIR DIESEL RESERVOIR THE U.S. ARMY CORPS OF ENGINEERS, OMAHA DISTRICT 19 May 2021 General Information: Document Type: COMBINED SYNOPSIS/SOLICITATION NOTICE Solicitation Number: W9128F-21-R-0063 Posted Date: 19 May 2021 Amendment: 0001 (25 May 2021) Original Response Date: 9 June 2021 (2:00 PM MST) Classification Code: C  Architect and Engineering Services 1. CONTRACT INFORMATION: This contract is being procured in accordance with the Selection of Architects and Engineers statute previously known as the Brooks A-E Act, as implemented in FAR Subpart 36.6. One firm will be selected for negotiation based on demonstrated competence and qualifications for the required work. The services will consist of 100% design and construction documents for Cheyenne Mountain Air Force Station (CMAFS) Generator Replacement and Diesel Reservoir Repair as described in project information. North American Industrial Classification System code is 541330, which has a size standard of $16,500,000 in annual average gross receipts over the past three years. This announcement is open to both Small Business (SB) and Other than Small Business (OTSB) A-E firms. Both SB and OTSB Offerors will be evaluated on the extent of participation of small business community (SBC) members in the performance of the acquisition. Offerors are required to meet the minimum mandatory total small business participation objective/target of 10% of total acquisition value to SBC members. Offerors proposing a higher objective/target than 10% may receive a more favorable evaluation for the appropriate evaluation factor. SBC members can propose work they will self-perform toward small business participation objectives. The small business subcontracting goals for this acquisition will be calculated based on the apparent successful Offeror(s) proposed small business participation objective (i.e. target percentage) of total acquisition value. The Subcontracting Plan is NOT required with this submittal. If a OTSB is selected for this contract, it must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan on that part of the work it intends to subcontract. The subcontracting plan is not required with this submittal. The following informational subcontracting goals are to be considered: Award approximately 10% of the total subcontracting dollars to all SB concerns. The subcontracting plan is not required with this submittal but will be required with the fee proposal of the firm selected for negotiations. Selected and successful firm(s) will be required to comply with the subcontracting limitations as set forth by the FAR Clause 52.219-14 LIMITATIONS ON SUBCONTRACTING, wherein stated in pertinent part, \"Services (except construction). The wages and benefits of service employees (see FAR 22.10) performing under these contracts must be at least equal to those determined by the Department of Labor under the Service Contract Act. Service wage rates will be determined relative to the employee's office location rather than the location of work. Additionally, in accordance with FAR Part 22.1303, all firms must complete their VETS-4212 report. Information can be found at the Department of Labor website https://www.dol.gov/agencies/vets/programs/vets4212, or call the service center at 1-866-237-0275; you will be asked to provide your company name, employer identification number (EIN), and DUNs number. Contract award is anticipated for September 2021. To be eligible for contract award, the Contractor must be registered in the System for Award Management (SAM). Registration is free and can be accessed at: https://betaSAM.gov. Ensure representations and certifications in SAM are current. 2. PROJECT INFORMATION: The A-E selected will be required to have sufficient staff, relevant knowledge and expertise, flexibility, and capability to provide a 100% design and construction documents for the CMAFS Generator Replacement and Repair Diesel Reservoir. A-E services may provide program of requirements development to include all required engineering studies for proper sizing and integration of the replacement units. Project Details: The following information represents the various project objectives as they are currently known. (a) Develop a design for replacing the six existing generators with an N+2 system capable of generating 12 Megawatts (MW) and Tier 2 emission compliant. (b) The design shall include a circulation system to prevent fuel stagnation within existing diesel fuel reservoir. As part of the design, the A-E shall evaluate the need for a water mitigation system to prevent ground water from seeping into the reservoir and the need for a diesel fuel polishing system. (c) The A-E shall evaluate the existing power plant major mechanical support systems and determine whether these systems can accommodate the operational requirements of...","url":"https://matchawards.com/dept_of_the_army/posts/106295722013789914","identifier":"W9128F21R0063","category":"541330 - Engineering Services","additionalProperty":[{"@type":"PropertyValue","name":"Status","value":"Closed"},{"@type":"PropertyValue","propertyID":"PSC","name":"PSC","value":"C219 - ARCHITECT AND ENGINEERING- GENERAL: OTHER"},{"@type":"PropertyValue","propertyID":"CM category","name":"Category Management category","value":"4.2 Construction Related Services","url":"https://matchawards.com/categories/facilities-and-construction/construction-related-services"}],"availabilityStarts":"2021-05-25","availabilityEnds":"2021-06-09","areaServed":"Colorado Springs, 80914","sameAs":"https://sam.gov/opp/afcb9eeb955d4d8fb90a5cbff3dbefe4/view"}
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https://matchawards.com/"},{"@type":"ListItem","position":2,"name":"Contracts","item":"https://matchawards.com/contracts"},{"@type":"ListItem","position":3,"name":"Professional services","item":"https://matchawards.com/contracts/professional-services"}]}
```