ClickCease Vertical Region 1- Regional Architect and Engineering Indefinite… | Closed - MatchAwards

Vertical Region 1- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts

Status
Closed (archived notice)
Agency
United States Department of the Army
Office
ARLINGTON, USA
Notice type
Solicitation
Solicitation number
W9133L-21-R-6001
NAICS
541330 - Engineering Services
PSC
C211 - ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING
Category
Construction Related Services (4.2)
Set-aside
Partial Small Business Set-Aside (FAR 19.5)
Posted
2021-05-13
Deadline
2021-05-18

Description

13 May 2021: See attached RFI Responses 28-54 and Synopsis Amendment 005, "W9133L-21-R-6001_Synopsis-Amendment 004". Changes are shown within the document as "tracked changes". 6 May 2021: See attached Synopsis Amendment 004, "W9133L-21-R-6001_Synopsis-Amendment 004", updating solicitation package due date to 18 May 2021; changed are shown within the document as "tracked changes". 30 April 2021: See attached Synopsis Amendment 003, "W9133L-21-R-6001_Synopsis-Amendment 003". Changes are shown within the documents as "tracked changes". Update 29 APR 2021: See attached Synopsis Amendment 002, "W9133L-21-R-6001_Synopsis-Amendment 002". Changes are shown within the document as "tracked changes". Update 28 APR 2021: See attached RFI Responses 1-27 and Synopsis Amendment 001. All changes to the Synopsis are in the following document shown in "track changes": W9133L-21-R-6001_Synopsis-Amendment 001. INDEFINITE DELIVERY TYPE ARCHITECT ENGINEER (A-E) CONTRACT FOR THE NATIONAL GUARD BUREAU IN SUPPORT OF THE AIR AND ARMY NATIONAL GUARD VERTICAL CONSTRUCTION PROGRAMS THROUGHOUT THE REGION 01 CONTRACT INFORMATION: The National Guard Bureau is soliciting for Non-Personal Architect-Engineer (A-E) Services per Public Law 92-582 (Selection of A-E Statute) and Federal Acquisition Regulation (FAR) Part 36. As a result of this announcement, the National Guard Bureau intends to award a target of four Indefinite Delivery Indefinite Quantity IDIQ A-E contract awards with two (2) solicited as Other than Small Business (i.e. unrestricted) and two (2) to be reserved for small business concerns, if there is adequate competition in accordance with FAR 36.602. These contracts will provide Vertical A-E services in support of Air National Guard (ANG) and Army National Guard (ARNG) mission requirements located throughout Region 01, which includes Connecticut (CT), Massachusetts (MA), Maine (ME), New Hampshire (NH), Rhode Island (RI) and Vermont (VT). The total capacity of the four contracts is $50M. This capacity will be shared among all firms. The Government may award more than two (2) contracts within each business category (i.e. Small Business or Other than Small Business) depending on the source selection decision regarding how many firms are considered the most highly qualified per the 2014 Selection of A&E Contracts Act selection procedures. Each IDIQ will be for a five year ordering period from the date of award of all contracts. Guidelines for competition of task orders: Non-Complex A-E task order requirements with a Programmed Amount (PA) less than $3M must be set-aside for competition among the reserved Small Business Firms. Non-Complex A-E task order requirements with a Programmed Amount (PA) above $3M may be competed among all IDIQs. Complex A-E task order requirements with a Programmed Amount (PA) less than $3M may be competed among all IDIQs. Complex A-E task order requirements with a Programmed Amount (PA) above $3M may be competed among Unrestricted IDIQs. The following definitions apply to the items above for Vertical requirements: Complex work is defined as projects that involve multiple concurrent disciplines or considers unique design solutions considering size and scope as determine by the Government. Examples: SCIF, Hangars, Major Building Renovations. Non-complex work is defined as work that involves limited disciplines or design solutions that are not considered unique. Examples: Administrative facilities and maintenance facilities (non-Hangars) All firms responding to the announcement will be required to identify which category they are submitting. All firms will be required to state the words, "Small Business", or "Other than Small Business" after the solicitation number in PART I, A, Block 3 of Standard Form 330. Firms will be required to submit a separate SF 330 for each category in which the firm wants consideration. No one firm will receive more than one award as a result of this solicitation. The North American Industry Classification System (NAICS) code for this action is 541330. The Small Business size standard is $16.5M in average annual receipts of a business’s latest three fiscal years. Small businesses are encouraged to team with other businesses. These are not requirements contracts. The contract will consist of two (2) ordering periods; one (1) ordering period will be for five (5) years and one (1) optional ordering period for six months with a total contract ceiling of $50M for the entire program. The total contract period shall not exceed five (5) calendar years and an option to extend six (6) additional months. Task orders will be primarily for projects with a construction value typically between $100K and $15M, however, as required, larger and/or smaller projects may be executed. The minimum total fee guaranteed to each contract awardee is $2,500.00. Order limitations are as follows: The Contractor is not obligated to honor (1) any order for a single item above $8M or (2) any order for a combination of items over $10M. Work will be issued by negotiated firm-fixed price task orders. Projects to be designed are not yet determined and funds (except those reserved for the minimum fee guarantee) are not presently available. The selection of A-E firms is based on professional qualifications necessary for the performance of the required services (rather than competitive bidding procedures). All A-E firms are cautioned to review the restrictions of FAR 9.5 Organizational and Consultant Conflicts of Interest and FAR 36.209 Construction Contracts with Architect-Engineer Firms. Any A-E firm that prepares a Design-Build Request for Proposal for a particular project will be restricted from participating in any contract or task order for the Design-Build of that particular project. All interested Architect-Engineers are reminded that, under the provisions of PL 95-507, they will be expected to place subcontracts to the maximum practicable extent consistent with the efficient performance of the contract with small and small disadvantaged firms. Large business firms that intend to pursue an IDIQ contract must convey their intent to meet the minimum small business goals on the SF330, Section C, by identifying subcontracting opportunities with small businesses. Minimum goals for this procurement are: Small Business (all types of small business combined) 14%; Small Disadvantaged Businesses 3%; Woman Owned Small Business 5%; HUBZone Small Business 1%; Veteran-Owned SB 3% and Service Disabled Veteran Owned SB 3%. Small Business firms that are selected under the Small Business set aside must perform 50 percent of the contract performance by the prime or a similarly situated Small Business subcontractor in accordance with Deviation 2020-O0008. If selected as the most highly qualified firm, the large business offeror will be required to submit a Small Business Subcontracting Plan following FAR 52.219-9 and DFARS 219.704/705 as a part of the Request for Proposal Package (RFPP). The subcontracting plan is NOT required with the SF330 submittal. The wages and benefits of service employees (FAR 22.10) performing under this contract must be at least equal to those determined by the Department of Labor under the Service Contract Act. This is a multiple award effort with the most-highly qualified firm in the Small Business group and the most-highly qualified firm in the Unrestricted group receiving their RFPP’s first. Once that process is complete, the next most highly qualified firm will be provided their RFPP and so on. In accordance with 40 USC 11, Selection of Architect and Engineers, the negotiation process will continue until an agreement is reached and all contracts are awarded. PROJECT INFORMATION: A-E services shall include, but not be limited to performance of the planning, master planning, and program support; A-E investigative and design services including development of construction documents; construction support; engineering and environmental studies, National Environmental Policy Act (NEPA) documentation; investigations and surveys in support of the Air and Army National Guard Vertical Construction Programs. Typical work may include, but is not specifically limited to: A) the preparation of plans, specifications, calculations, and cost estimates; B) the development of cost management, quality control, and quality assurance plans; C) construction inspection, testing, and management services; D) development of engineering standards; E) preparations for national design submissions; F) technical, economic, planning, environmental, value engineering and other studies, analyses, surveys, investigations, and reports; G) development of performance criteria for bridging documents for design build projects; H) development of documents to support various government construction programs; I) commissioning services; J) comprehensive interior design. Services may include but are not limited to, a wide variety of professional services in support of projects for administrative, industrial, and support facilities to meet the needs of the National Guard Bureau. Various projects may include services associated with National Guard Bureau installations/facilities, such as aircraft hangars, corrosion control facilities, aircraft maintenance facilities, vehicle maintenance facilities, support equipment maintenance facilities, administrative offices, supply facilities, civil engineering facilities, dormitory buildings, training site facilities, readiness centers (armory), fire stations, security forces facilities, munitions maintenance and storage facilities, communications and electronic maintenance, mobility and aerial port facilities, dining facilities, medical training facilities, secondary roadways , site utilities, aircraft fuel storage and distribution systems, and other support facilities. Additionally, task orders may be issued for support services that require A-E Services as defined in FAR 2.101 SELECTION CRITERIA - The selection criteria are listed below in descending order of importance. Criteria A – Professional Qualifications necessary for satisfactory performance of required services (SF330, Part I, Section E): The selected firm must have, either in?house or through consultants, all disciplines listed for this criteria and must provide resumes in Part I, Section E, of the SF330. Resumes shall not exceed two (2) pages each. All engineers, architects and the project manager must have the following in the role they are assigned to on the project team; a bachelor's degree, professional registration, and at least five years of relevant experience. The Government may give additional consideration for special training or certifications, additional registration, higher level of education degrees, and/or years of experience that exceeds the five-year minimum requirement: (1) Mechanical Engineer; (2) Project Manager (3) Architect (4) Electrical Engineer; (5) Structural Engineer; (6) Civil Engineer; (7) Fire Protection Engineer – must have an ABET accredited engineering degree and current registration in the field of Fire Protection Engineering within the United States or its territories, having passed the National Council of Examiners for Engineering and Surveyors (NCEES), and at least five (5) years of relevant experience; (8) Communications Specialist -Registered Communications Distribution Design (RCDD); (9) Environmental Engineer or Physical Scientist with experience in NEPA processes; registered engineer or similar registration that includes documented work history, state examination, and state certification board (10) Surveyor who is a registered professional land surveyor with 5 years of relevant experience (11) Cost Estimator; Bachelor’s degree, the cost engineering specialist(s) must be certified by a professional organization, such as the Association for the Advancement of Cost Engineering (AACE), International Costs Engineering Council (ICEC), or Professional Construction Estimators Association . The firm's and/or consultant's cost engineering or estimating specialist(s), must be specifically identified and their competence indicated by resume(s); (12) Geotechnical Engineer; (13) Corrosion Engineer Registered National Association of Corrosion Engineers (NACE) Certified Corrosion Specialist NACE Certified Cathodic Protection Specialist (CP-4), or registered professional corrosion engineer with a minimum of five years’ experience; (14) Security/Cyber Security Specialist; the security/cyber security specialist(s) must have minimum of five years' of experience in cybersecurity of facility related control systems; (15) Landscape Architect who is a registered professional landscape architect; (16) Interior Designer who is a registered architect with specialized experience in interior design and/or state registered interior designer and/or National Council for Interior Design Qualification (NCIDQ) certified interior designer; (17) Geologist; Geology or physical scientist Bachelor’s degree, with 5 years’ experience and a Certified Professional Geologist (CPG) form the American Institute of Professional Geologists (AIPG) **Note that the government will consider more favorably team members with Design Build Institute of America (DBIA) certification and Building Information Modeling (BIM) competence certifications. These will be credited with a strength. If an individual will serve in more than one discipline then those disciplines shall be indicated in Block 13, PART I, Section E. Resumes (Section E of the SF 330) must be provided for all disciplines, including consultants. In the resumes under Project Assignments, use the same discipline nomenclature as is used in this announcement. The Government may provide additional consideration to offerors where key personnel worked on relevant projects that demonstrates experience relevant to Criteria B. Criteria B -- Specialized Experience and Technical Competence in the type of work required, including, as appropriate, experience in sustainable design, energy conservation, pollution prevention, waste reduction, and the use of recovered materials (SF330, Part I, Section F): The offeror shall provide a maximum of ten (10) projects within the past six (6) years preceding the date of this announcement for both, the prime firm and subcontractor(s) in PART I, Section F, of the SF330. Examples of projects shall not exceed two (2) pages each. If any portion of the work provided as specialized experience is subcontracted, clearly identify that work as such and provide the required experience of that subcontractor as it relates to work the subcontractor is to perform for this solicitation. If the offeror is a joint venture, each firm shall provide information demonstrating experience relevant to their role on this project. A Project is defined as a single, stand-alone contract and/or a single task order issued under an existing IDIQ contract(s) unless the project included multiple phases and was issued under more than one contractual order. It shall be noted that an IDIQ contract is not a project. Do not combine multiple task orders unrelated to a stand-alone project to create a single project example. Combining multiple task orders under an IDIQ to create a single project will not be compliant with the solicitation criteria, and it will not be evaluated or considered. The contract number or IDIQ number and individual task order number associated with the project in the title must be included for each of the projects. If the project is not 100% complete, note the current percentage and estimated date when the project will be completed for each contract and/or task order. Include the percentage of work self-performed by the prime for each contract and/or task order. If proposing as a JV, ascribe the percentage of work self-performed by each Joint Venture member. The offeror and/or subcontractors must demonstrate experience in the following areas with narrative and by average revenue in part II where indicated: (1) Experience in the design of military projects (Profile Code M05 in Part II), including the production of programming documents, plans and specifications. (2) Design of government and commercial facilities. (3) Specialized Expertise demonstrating a broad base of knowledge integrating federal requirements to include: Sustainable design experience (Profile Code S11 in Part II) per UFC 1?200?02, High Performance and Sustainable Building Requirements and certified LEED AP; Technical Competence & Experience using DOD UFC and associated Unified Facilities Guide Specifications (UFGS); Design and construction experience conforming to Department of Defense Antiterrorism/Force Protection Construction Standards and DOD Unified Facilities Criteria (UFC 4?010?01), note that the Government may provide additional consideration for engineers and architects who have attended any DoD Security Engineer Course; Performance of surveying and mapping (Profile Code S10 in Part II) following A/E/C CADD Standards and nondestructive techniques for locating underground utilities; and experience with REVIT (cloud), Civil-3D or other building modeling technologies or virtual reality and UFC 3-101-01; (4) Experience providing Comprehensive Interior Design for government projects including space planning and applicable Code of Federal Regulation rules, pre?wired workstations, furniture, demountable wall systems, and knowledge of the acquisition process including applicable FAR and funding limitations. (5) Demonstrate experience and familiarity with Federal Aviation Administration (FAA) Part 77 and preparing FAA 7460 permit applications relating to construction projects and familiarity with UFC 3-260-1; (6) Demonstrate experience using project and construction management tools such as Newforma, Primavera, Submittal Exchange, ProjectWise, iPDWeb, or similar systems; (7) Demonstrate experience (Profile Code C15 and T02 in Part II) in evaluating contractor's submittals, request for change, request for information, and performing construction surveillance; (8) Demonstrate the ability to prepare supporting comprehensive master planning maps and plans using the latest versions of ESRI and ArcGIS; (9) Demonstrate experience with preparing the technical portions of a Design-Build Request for Proposal package (Profile Code D04 in Part II) for performance-based design-build; (10) Demonstrate experience (Profile Codes A10, E13 in Part II) in design and survey for abatement of asbestos, lead?based paint, and the handling/disposal of other toxic and regulated substances; (11) Demonstrate experience (Profile Code E09 in Part II) with NEPA’s process and requirements as well as preparation of required documentation; (12) In Section H of the SF 330, describe the firm's quality management plan, including quality assurance process, coordination of in?house work, coordination with consultants, and prior experience of the prime firm and significant consultants or partner firms. Demonstrate project design?to?bid performance showing final design estimate and compared it to initial awarded bid amount. Provide explanations for any variance greater than 5%. Criteria C ? Capacity to accomplish multiple task orders in the required time (SF330, Part I, Section H). Firms must have the capacity to proceed with work and accomplish it promptly once a notice to proceed is issued and accomplish it prior to scheduled completion dates, including emergency response. Firms must demonstrate the ability to accomplish multiple task orders simultaneously. The evaluation will consider the prime availability of an adequate number of key personnel, equipment, and the extent of in-house facilities versus subcontracting needs. The A-E should submit evidence in the SF330 Part I, Section H, to support its capacity to accomplish work based on the following criteria: (1) Ability to meet design schedules and accomplish the work within the required time, (2) Ability to accomplish

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in May 2021

More lists