ClickCease OAKLAND INNER AND OUTER HARBOR FY 21 MAINTENANCE DREDGING PROJECT | Closed - MatchAwards

OAKLAND INNER AND OUTER HARBOR FY 21 MAINTENANCE DREDGING PROJECT

Status
Closed (archived notice)
Agency
United States Department of the Army
Office
SAN FRANCISCO, USA
Notice type
Solicitation
Solicitation number
W912P721B0002
NAICS
237990 - Other Heavy and Civil Engineering Construction
PSC
Z1KF - MAINTENANCE OF DREDGING FACILITIES
Category
Facility Related Services (4.4)
Posted
2021-04-16
Deadline
2021-04-15
Place of performance
Oakland, 94611

Description

Please see attachment of Bid Results on April 15, 2021: BID RESULTS PROJECT TITLE/LOCATION: Bid Results for Oakland Inner and Outer Harbor FY21 Maintenance Dredging Project, Alameda Counties, CA Contract Type: Construction Solicitation No.: W912P721B0002 Apparent Low: Contractor’s Name: The Dutra Group Address: 2350 Kerner Boulevard, Suite City and State: San Rafael, CA 94901-5595 Business Size: Large Business Bid Amount: $16,575,600.00 Apparent 2nd Low: Manson Construction Co. Address: 5209 E. Marginal Way S. City and State: Seattle, WA 98134 Business Size: Large Business Bid Amount: $16,979,400.00 Apparent 3rd low: Curtin Maritime Corp. P.O. Box 2531 Long Beach, CA 90801 Business Size: Small Business Government Estimate: $24,371,100.00 Number of Bids Received: 3 Highest Bid Amount: $20,529,584..00 Business Size: Small Business Government Estimate: $24,371,100.00 Number of Bids Received: 3 ______________________________________________________________________________________________________ AMENDMENT 0004 Changes the following: 1442 (1) Period of Performance – changed to 213days (2) Description of Work – changed 2 ft paid overdepth to 1.5 ft overdepth in the first sentence Price Schedule (1) Revised Bid Schedule-1 Paid Over-depth changed from 2ft to 1.5ft (see attached bid schedule) – quantity stays the same as amended with amendment 1. Plans (1) Plan sheet G-02 – channel profile adjusted to reflect the change in the allowable paid and unpaid over-depth Section 35 020 23 (1) Paragraph 1.4.1.4 – Allowable (Paid) Overdepth Prism – First sentence changed 2ft to 1.5ft and last sentence removed. (2) Paragraph 1.4.1.5 Allowable (Unpaid) Overdepth Prism – description added. WAGE DETERMINATION (1) Revised Wage Determination CA202100018 04/02/2021-Attachment-click on the paper clip on the left hand side of the amendment. ____________________________________________________________________________________________________ AMENDMENT 0003 Changes the Bid due date to: April 15, 2021@2:00pm PST and Bid Opening: April 15, 2021@2:10pm PST ________________________________________________________________________________________________ AMENDMENT 0002 ________________________________________________________________________________________________________ AMENDMENT 0001 ________________________________________________________________________________________________________ The work includes annual maintenance dredging (using contour dredging) of the Oakland Inner and Outer harbor to-50-ft (MLLW) plus 2-ft of paid over-depth and transporting of the dredged material per the requirements in specification Section 01 11 00 SUMMARY OF WORK. Excluding Reach 10A, the material from Reaches 1 through 10B is suitable for disposal at a Contractor-furnished upland site as cover. The material from Reach 10A is suitable for disposal at a Contractor-furnished upland site as foundation. Dredgedmaterial from Reach 1 through10B is also suitable for disposal at Government furnished ocean disposal site (SF-DODS). .

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in April 2021