ClickCease MVD Levee Requirements for FY21 | Closed - MatchAwards

MVD Levee Requirements for FY21

Status
Closed (archived notice)
Agency
United States Department of the Army
Office
VICKSBURG, USA
Notice type
Special Notice
Solicitation number
W912MVD210001
NAICS
237990 - Other Heavy and Civil Engineering Construction
PSC
Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
Category
Construction Related Services (4.2)
Posted
2021-03-23
Deadline
2021-09-30

Description

The intent of this special notice is to share the most current information available with respect to anticipated levee work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts during fiscal year 2021. NOTE: This information includes projected requirements and schedules that are subject to change. All project information is subject to change as designs are refined and impacts are quantified. Principle features of work include construction of various types of earthen levee embankment enlargement and repair, seepage berm construction, seepage cut-off construction, and/or installation of relief wells. This work will be performed primarily along the Mississippi River levee system within the geographic bounds within the Mississippi Valley Division (particularly the Memphis District, Vicksburg District and New Orleans District). The work shall include; required clearing and grubbing, placing geotextile material, placing and compacting of earthen fill to the lines and grades required, moisture and density control of placed earthen fill, construction of sheet pile or slurry seepage cut-off features, installation of groundwater relief wells to specified depth below ground surface, collecting and analyzing soil boring data to establish location of well screens, placing well screens, stems, and filter packs, caps, covers, seals, etc., grouting groundwater wells as required, providing drainage as shown on plan drawings, developing and cleaning ground water wells, establishing turf grass over the work area, and construction of crushed stone access roadways and ramps, miscellaneous reinforced concrete work as shown on plan drawings. The work shall also include flood wall construction, which generally consists of a new temporary access road, ramps, temporary retaining structure, structural excavation and backfill, steel pipe, or concrete piling, reinforced concrete floodwall construction, storm drainage utilities, and other incidental work. The work will include furnishing all plant, materials, equipment, labor, and supervision, to complete the work as described. MEMPHIS DISTRICT Acting Small Business Professional: Kimbery Danielray, (901) 544-3358 Email: Kimberly.S.Danielray@usace.army.mil Internet: http://www.mvm.usace.army.mil/Business-With-Us/Small-Business/ District Contracting Chief: Pricilla Sweeney Email: Priscilla.G.Sweeney@usace.army.mil VICKSBURG DISTRICT Small Business Professional: Demetric Erwin, (601) 631-5951 Email: SBO-MVK@usace.army.mil Internet: http://www.mvk.usace.army.mil/Business-With-Us/Small-Business/ District Construction Branch Chief: Ellis Screws Email: Ellis.Screws@usace.army.mil NEW ORLEANS DISTRICT Small Business Professional: David Willis, (504) 862-2627 Email: David.Willis@usace.army.mil Internet: http://www.mvn.usace.army.mil/Business-With-Us/Small-Business/ District Contracting Chief: Cynthia Hall Email: Cynthia.M.Hall@usace.army.mil

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Army posted in March 2021

More lists