Natomas Reach D Pumping Plant 4
- Status
- Closed (archived notice)
- Agency
- United States Department of the Army
- Office
- SACRAMENTO, USA
- Notice type
- Solicitation
- Solicitation number
- W9123821B0002
- NAICS
- 237990 - Other Heavy and Civil Engineering Construction
- PSC
- Z1NE - MAINTENANCE OF WATER SUPPLY FACILITIES
- Category
- Facility Related Services (4.4)
- Posted
- 2021-01-26
- Deadline
- 2021-01-26
- Place of performance
- Sacramento, 95824
Description
*** 12/26/21- Posted Bid Opening Abstract *** *** Amendment 0002 Posted - Revised Plans and Specs *** *** Amendment 0001 Posted - Extended Bid due date and changed Bid Opening time***** *** 12/30/20 - Site visit sign-in sheet posted *** The work includes relocating Pumping Plant 4 discharge pipes to be raised 10 feet to be above the 200-year water surface elevation and adding a new vault and outfall structure. Additional work includes removal of existing Pumping Plant 4 building and trash rack and reconfiguring the pump station intake and installing a new trash rack. The pump station pad will be raised and have new pumps installed but will not include a new building. A driveway to the new trash rack will also be located adjacent to the Electrical Building, with power provided from the adjacent PG&E lines. Six-foot high chain-link fencing will enclose the Pumping Plant area, with gates installed as shown on the plans. Access ramps and landside toe roads will be reconfigured to accommodate the new pumping plant layout.Attachments
- Attachment 1
- Attachment 2
- Attachment 3
- Attachment 4
- Attachment 5
- Attachment 6
- Attachment 7
- Attachment 8
- Attachment 9
- Attachment 10
- Attachment 11
- Attachment 12
- Attachment 13
- Attachment 14
- Attachment 15
Contacts
- Julie Maxwell
- Melissa A. DeNigris
Email and phone are in the source notice.
More from United States Department of the Army posted in January 2021