ClickCease Serv C26-134 Daily Freezer Replacement (Lay Up Room) | Closed - MatchAwards

Serv C26-134 Daily Freezer Replacement (Lay Up Room)

Status
Closed, the response deadline passed on Oct 13, 2026
Agency
United States Department of the Air Force
Office
TINKER AFB, USA
Notice type
Sources Sought
Solicitation number
ServC26-134
NAICS
333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
Posted
2026-09-14
Deadline
2026-10-13
Place of performance
0, Oklahoma 73145, UNITED STATES

Description

Sources Sought Synopsis

Serv C26-134 Daily Freezer Replacement (Lay Up Room)

Tinker Air Force Base, OK

14 September 2026

Serv C26-134 Daily Freezer Replacement (Lay Up Room)

CAUTION:

This market survey is being conducted to identify potential sources that may possess the expertise, capabilities, and experience to meet the requirements for qualification and production of the Serv C26-134 Daily Freezer Replacement (Lay Up Room) for use by United States Air Force (USAF) personnel.  The level of security clearance and amount of foreign participation in this requirement has not been determined.  Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards.  The government will not reimburse participants for any expenses associated with their participation in this survey.

INSTRUCTIONS:

  1. Below is a document containing a description of the Serv C26-134 Daily Freezer Replacement (Lay Up Room) requirement and a Contractor Capability Survey, which allows you to provide your company’s capability.

  1. Performance Work Statement (PWS)

  1. If, after reviewing these documents, you desire to participate in the market research, you should provide documentation that supports your company’s capability in meeting these requirements.  Failure to provide documentation may result in the government being unable to adequately assess your capabilities.  If you lack sufficient experience in a particular area, please provide details explaining how you would overcome the lack of experience/capabilities in order to perform that portion of the requirement (i.e., teaming, subcontracting, etc.)
    1. Identify any areas of work that your organization believes should be broken out exclusively for Small Business.

  1. Both large and small businesses are encouraged to participate in this Market Research.  Joint ventures or teaming arrangements are encouraged.

  1. Questions relative to this market survey should be addressed to Tori Wallace, 405-734-0453 and tori.wallace@us.af.mil

Serv C26-134 Daily Freezer Replacement (Lay Up Room)

PURPOSE/DESCRIPTION

The Government is conducting market research to identify potential sources that possess the production data/repair data, expertise, capabilities, and experience to meet qualification requirements for the Daily Freezer Replacement (Lay Up Room) on/for Tinker Air Force Base (AFB). The intent is for the Government to secure a one-year service contract for these services.  Scope:  The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform replacing the existing refrigeration systems for two (2) walk in freezers located in the layup room in Building 9001, Post F-16 the Oklahoma City–Air Logistics Complex (OC-ALC).  The equipment is listed in Appendix A (On-Base).

The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS. The following descriptions are from the attached Performance Work Statement (PWS).

Requested Services:  The Contractor shall replace the existing refrigeration systems for two (2) walk-in freezers. The new refrigeration systems must be fully compatible with the existing electrical setup, power requirements (Single‑phase, 208 V, 60 Hz), and freezer box panels (9 ft × 9 ft × 8 ft 5 in). No modifications are permitted to the freezer box panels or their disconnect boxes. The existing freezer box panels will be reused.

This is a turnkey project, requiring the contractor to provide all labor, materials, equipment, and services necessary to deliver fully operational systems capable of maintaining a –10°F setpoint.

3. Contractor Responsibilities (Turnkey Scope)

3.1 Refrigeration Requirement

3.2 Removal and Disposal

3.3 Procurement and Delivery

3.4 Installation Requirements

The contractor shall:

  1. Meet delivery trucks and off‑load refrigeration equipment.
  2. Install new refrigeration condensers and evaporators.
  3. Provide nylon all‑thread and stainless‑steel hardware for evaporator coil suspension.
  4. Install new ACR hard copper piping and 1" thick‑wall suction line insulation.
  5. Provide all unistrut, hangers, brackets, trapeze supports, pipe clamps, all‑thread, and anchors as needed.
  6. Provide all fittings, silver solder, welding supplies, and labor required for refrigeration piping.
  7. Perform leak checks with nitrogen, pull vacuum, and charge the system with new refrigerant.
  8. Perform all electrical work, including:
    • Disconnecting power from existing units
    • Removing conduit and demolition as required
    • Reinstalling receptacles in their current locations
    • Providing new power connections from existing disconnects to the new evaporators and condensing units
    • Mounting and wiring lights
    • Installing new seal‑offs at penetration points and GRC inside the freezers
  9. Install drains, furnish and install heat tape (if required), and insulate drain lines.
  10. Start up all refrigeration systems, set pressure switches and controls, calibrate thermometers, and verify temperature performance.
  11. Seal all refrigeration penetrations.
  12. Replace two (2) door gaskets per freezer.

4. System Performance Requirements

The completed installation must deliver:

5. Startup and Training Requirements

The Contractor shall:

a. Conduct full system startup and functional testing to verify proper operation of all installed components.

6. Deliverables at Time of Solicitation (Offeror Requirements)

The Offeror shall provide:

a. Detailed descriptions, specifications, and sketches demonstrating compliance with this Statement of Work (SOW).

b. Justification for any proposed alternative solutions, demonstrating how they meet or exceed the requirements.

7. Deliverables at Time of Installation (Contractor Requirements)

The Contractor shall provide:

a. Fully installed and operational freezers capable of achieving a –10°F setpoint.

b. New refrigeration system component drawings.

 c. All manuals and parts lists associated with the newly installed equipment.

d. Operator training and supporting documentation.

8. Schedule Requirements

The contractor shall include in the proposal:

Attachments

Source notice

More from United States Department of the Air Force posted in September 2026

More lists