ClickCease Buckley SFB Chiller Replacement | Closed - MatchAwards

Buckley SFB Chiller Replacement

Status
Closed, the response deadline passed on Jul 22, 2026
Agency
United States Department of the Air Force
Office
BUCKLEY AFB, USA
Notice type
Sources Sought
Solicitation number
BuckleySFBChillerReplacement
NAICS
238220 - Plumbing, Heating, and Air-Conditioning Contractors
PSC
N041 - INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
Category
Facility Related Services (4.4)
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
2026-07-14
Deadline
2026-07-22
Place of performance
Aurora, Colorado 80011, UNITED STATES

Description

PLEASE SEE ATTACHMENTS FOR ADDITIONAL INFORMATION REGARDING THIS REQUIREMENT

Notice Type: Sources Sought (MARKET RESEARCH PURPOSES ONLY)
Title: Secure Facility Chilled Water System Replacement – Federal Installation, CO
NAICS Code: 238220 – Plumbing, Heating, and Air-Conditioning Contractors
Product Service Code (PSC): N041 – Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
Response Date: 22 July 2026

Description:

The Department of the Air Force (DAF), on behalf of the Base Civil Engineer Squadron (CES) at a Federal Installation in Colorado, is conducting market research to identify qualified, experienced, and interested business sources—specifically targeting small and socio-economic businesses (e.g., 8(a), SDVOSB, HUBZone, WOSB)—capable of performing a complete chilled water system replacement in a 24/7 operations facility.

Project Objective: The chilled water system serving the facility's server room currently suffers from degraded serviceability, sub-component failures, and frequent downtime. It is operating at half capacity, which risks the loss of critical cooling for 24/7 operations. The selected contractor must provide all tools, equipment, materials, and certified labor to perform a complete system replacement with zero downtime to the active server room.

Key Scope Items & Technical Specifications:

  1. Design & Sizing: Perform professional engineering cooling system design load calculations in accordance with UFC 3-410-01 (Sections 2-4 and 2-5.6) to determine final system capacity.

  2. Standardization Requirement: In accordance with the DAF Class Justification and Approval (J&A) for HVAC Chiller Replacement Standardization, the design of the new chiller system must be standardized on Trane-series equipment for this installation.

  3. Demolition: Safely decommission, recover refrigerant from, and remove the existing degraded chiller (Technical Systems Model: 30A0LM20-PT, Serial: 02-17-125822-001-001) and two existing Computer Room Air Handlers (CRAHs) (Data Aire Model: GFCU-04634, Serials: 2016-3226-A, 20163225-A).

  4. Equipment Installation: Procure, install, and commission:

    • One (1) new water chiller with an integrated air-cooled condenser (Trane-series).

    • Two (2) new chilled-water Computer Room Air Handlers (CRAHs) inside the secure server room.

  5. Temporary Cooling: Provide continuous, redundant temporary cooling to keep the secure server room strictly within operational temperature limits during the transition phase.

  6. Controls Integration: Fully integrate new controls into the base-wide Energy Management Control System (EMCS) in strict compliance with Base EMCS Standards (dated January 21, 2026) and UFC 3-410-02.

Logistical & Physical Constraints:

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Air Force posted in July 2026

More lists