ClickCease CALL 1 – SECURE ENCLAVE CHIPLETS_Amendment 2 | Closed - MatchAwards

CALL 1 – SECURE ENCLAVE CHIPLETS_Amendment 2

Status
Closed, the response deadline passed on Jul 27, 2026
Agency
United States Department of the Air Force
Office
BOLLING AFB, USA
Notice type
Solicitation
Solicitation number
SAFAQC
NAICS
541713 - Research and Development in Nanotechnology
PSC
5999 - MISCELLANEOUS ELECTRICAL AND ELECTRONIC COMPONENTS
Posted
2026-07-21
Deadline
2026-07-27
Place of performance
UNITED STATES

Description

CALL 1 – SECURE ENCLAVE CHIPLETS

This Broad Agency Announcement (BAA) Call solicitation is issued in accordance with the Revolutionary Federal Acquisition Regulation Overhaul (RFO) subpart 35.102.

NAICS Code: 541713, Nanotechnology research and development laboratories or services, all fields of science

Federal Agency Name and Contracting Officers: 

SAF/AQC, Ms. Natalie Sitkowski natalie.sitkowski@us.af.mil

SAF/AQC, Ms. Dimitria Antonopoulos, dimitria.antonopoulos@us.af.mil

SAF/AQC, Mr. Stephen Colvin  stephen.colvin.2@us.af.mil

Technical POC:

SAF/AQ: Mr. Matthew Karijolic matthew.karijolic@us.af.mil

Broad Agency Announcement Title: This is a combined synopsis/solicitation under the State-of-the-Art (SOTA) Microelectronics Adoption BAA. Call 1, titled “Secure Enclave Chiplets”

Broad Agency Announcement Number: 26-S-1358, Call 001 (Secure Enclave Chiplets)

Broad Agency Announcement Type: This is the initial announcement for Call 1. This will be a Two-Step Call solicitation.

Step 1: WHITE PAPER DUE DATE AND TIME: White Papers will be accepted until 23 Jul 2026 at 5:00pm Eastern Time (ET). White Papers may be submitted at any time during this period. White Papers received after the specified date and time will be considered late in accordance with RFO 52.215-1(c)(3) and will not be reviewed. Questions pertaining to this Call may be submitted for the USG’s consideration NLT 15 July 2026 at 5:00pm ET. Please email all questions to SE_PI@us.af.mil.

Step 2: FULL PROPOSAL DUE DATE AND TIME: To be provided in the Requests for Proposal (RFP) sent to Offerors that submit White Papers considered to be of further interest to SAF/AQC. Full Proposals received after the specified date listed in a formalized Step 2 RFP and time will be considered late.

Submission POC: White Papers must be submitted via email to SE_PI@us.af.mil.

FULL TEXT – CALL 1 (Secure Enclave Chiplets)

  1. SECURE ENCLAVE CHIPLETS OVERVIEW

The Department of War (DOW) invites Offerors to submit Pilot Project chiplet designs with innovative and novel technical solutions which address all aspects of SOTA microelectronics and composable systems, focusing on the Secure Enclave Chiplets objectives below. This requires delivering enduring, secure, interoperable, and highly reusable chiplet architectures tailored for High-Demand Mission Areas (e.g., Radio Frequency/Electronic Warfare (RF/EW), munitions, security, and/or autonomy).

Many DOW microelectronics projects operate in varying classification environments, including highly classified environments (collateral, Sensitive Compartmented Information, and Special Access Programs). The USG intends for much of the development to occur at the UNCLASSIFIED or Controlled Unclassified Information (CUI) level. Notice of intent to perform classified work as a result of this Call must be provided to the USG Contracting Officer. If the Offeror intends to perform any classified work, it must be done so at their facility (or a subcontractor/sub-awardee’s facility). The Offeror will need to provide a Facility Accreditation Letter (FAL) for each facility to the Contracting Officer no later than (NLT) contract award.

This BAA Call may result in the award of a Federal Acquisition Regulation (FAR)-based contract or an Other Transaction for Prototype Project pursuant to 10 U.S.C. 4022. The Government is not obligated to make any awards as a result of this Call, and all awards are explicitly subject to the availability of funds and successful negotiations. The USG will not reimburse any offeror for White Paper or Proposal costs associated with responding to this solicitation.

The USG reserves the right to modify the solicitation requirements of this BAA Call at its sole discretion.

  1. SECURE ENCLAVE CHIPLETS STATEMENT OF OBJECTIVES (SOO)

  1.  BACKGROUND

Secure Enclave is a DOW acquisition program to provide the USG with a secure, trusted source of state-of-the-art (SOTA) microelectronics (ME) wafers and packaged parts. In partnership with Intel Corporation, Secure Enclave will ensure key aspects of end-to-end ME manufacturing are performed securely and onshore. This Call will solicit Pilot Projects to act as “pipe cleaners” that test the Secure Enclave design and manufacturing capabilities while fostering development of chiplets and interfaces needed to affordably insert SOTA ME into DOW programs.

Beyond Secure Enclave, the DOW requires a fundamental shift in how it develops, procures, and sustains SOTA ME to combat cost growth, mitigate obsolescence, and accelerate the insertion of advanced technology into national security systems (NSS). Monolithic and bespoke silicon designs have become increasingly complex and prohibitively expensive. As a result, the DOW is transitioning toward composable chiplet architectures. The USG requires the development of SOTA chiplets utilizing open interconnects to foster a robust, affordable, interoperable chiplet ecosystem. This "chiplet-first" approach allows the DOW to apply Intel 18A SOTA silicon, where maximum performance is mission-critical, while integrating mature, trusted, non-SOTA, or Commercial-off-the-Shelf (COTS) silicon for standard functions. The USG aims to drastically lower Non-Recurring Engineering (NRE) and adoption costs, improve overall manufacturing yield, and aggregate demand across shared mission sets (such as RF/EW, munitions, security, autonomy, etc.). Ultimately, this Call seeks to demonstrate that a modular, open-standard chiplet ecosystem can deliver next-generation capability to the warfighter faster and more affordably than traditional approaches.

The scope detailed below is a USG Statement of Objectives (SOO) the USG seeks to achieve during the performance for any awards made under this Call. The USG expects Offerors to propose a defined and detailed Contractor Statement of Work (CSOW) that includes ALL three (3) Objectives listed in Section 2.0 below. The USG reserves the right to make edits to the SOO prior to the release of a formal Step 2 Request for Proposals (RFP).

  1.  SCOPE
    1. OBJECTIVE 1 – Analyze
      1. The contractor shall analyze current and future DOW requirements within a single or multiple selected high demand mission area(s)/domain(s) and describe how their proposed SOTA chiplet advances DOW capability when integrated into a longer-term Multi-Chip Package (MCP) architecture.
      2. The contractor shall explicitly analyze anticipated demand for the proposed chiplet, if successful, and detail its applicability and performance benefits to DOW mission sets, including targeted Size, Weight, and Power (SWaP).
      3. The contractor shall calculate the projected unit demand across the USG and Defense Industrial Base (DIB) for the developed chiplet, if successful, and document any assumptions inherent in their demand estimates. The contractor is encouraged to partner with other DIBs and USG partners to derive their demand estimate.
      4. The contractor shall perform and deliver a gap analysis detailing intellectual property requirements absent from the current Intel 18A process node required to enable composable chiplet architectures and/or ecosystems.
      5. The contractor shall identify and deliver a listing of all missing functional Intellectual Property (IP) blocks, immature interconnects, and necessary military environmental qualifications required for long term success of the proposed chiplet and its surrounding architecture and/or ecosystem.
      6. The contractor shall document and justify the system-level partitioning of their proposed SOTA chiplet within a larger MCP architecture. This documentation must include:
        1. A clear description of which system functions are allocated to the newly designed SOTA chiplet (to be advanced using Intel 18A and Advanced Packaging via Secure Enclave).
        2. A description of which surrounding system functions are best allocated to external, non-SOTA or COTS companion chiplets within the broader MCP ecosystem.

    1. OBJECTIVE 2 – Design & Deliver
      1. The contractor shall design a highly reusable, highly capable MCP architecture, inclusive of at least one newly designed SOTA chiplet ready for tape-out, that advances the DOW’s use of SOTA ME.
      2. The contractor may propose a clean sheet design, iteration of a legacy design that adds SOTA capability via a chiplet, or a decomposition of an existing USG ME architecture that includes integration of Intel 18A silicon or use of Intel’s onshore, Advanced Packaging.
      3. The contractor shall, to the maximum extent practical, leverage representative models including emulation, simulation, and digital twins to increase probability of achieving first-pass tape-out success.
      4. The contractor shall deliver fully functional software Transaction Level Models (TLMs) representing the proposed chiplet architecture prior to any physical tape-out.
      5. The contractor’s design shall prioritize open standards, using Intel advanced packaging technologies (e.g., Embedded Multi-die Interconnect Bridge, etc.).
      6. The contractor shall, at the end of the Period of Performance, deliver a finalized chiplet design in a verified, tape-out ready state (e.g., Graphic Design System II (GDSII)/ Open Artwork System Interchange Standard (OASIS) file).
      7. The contractor shall generate comprehensive electrical design data, including Input/output Buffer Information Specification (IBIS) models, Eye Diagrams, and S-Parameter files.
      8. The contractor shall ensure the designed chiplet is interoperable with 3rd-party chiplets.
      9. The contractor shall, to the maximum extent practical, utilize mature, industry-standard open interfaces (e.g., Universal Chiplet Interconnect Express (UCIe), etc.) for all die-to-die and off-package communications.
      10. The contractor shall establish and validate assembly and verification workflows exclusively within the Secure Enclave.
      11. The contractor shall implement strict "interface firewalls" to ensure any proprietary 3rd-party design data does not contaminate the USG's data rights to the SOTA logic and interfaces.
      12. The contractor shall consider any security requirements, including those for Anti-Tamper, in their design, as applicable.
      13. The contractor shall deliver a comprehensive Bare Die Data Package as part of the final Technical Data Package (TDP). This package must contain all necessary data for a third party to successfully integrate the chiplet into an MCP.

    1. OBJECTIVE  3 – Transition
      1. The contractor shall collaborate with members of Intel Government Technologies to test, to the maximum extent practical, Secure Enclave’s design center. This shall include a test delivery of the finalized design file to Intel’s Secure Enclave Customer Portal. If awarded, during the period or performance, the USG will describe methods for delivery.
      2. If not already in place, the contractor shall complete all documentation required to formalize a business-to-business relationship between themselves, their subcontractors (as applicable), and Intel.
      3. The contractor shall detail their use of Secure Enclave, interactions with Intel, and any lessons learned for future customers.
      4. The contractor shall outline a strategy for a user-friendly licensing model which would enable USG and DIB procurement of the chiplet, including a technical specifications slick sheet, targeted unit price, and ground rules and assumptions.
      5. The contractor shall formulate a comprehensive data rights and licensing strategy that minimizes restrictive proprietary IP.
      6. The contractor shall map the final chiplet design directly to multiple, distinct USG Programs of Record (PoRs).
      7. The contractor shall coordinate with relevant USG and DIB Program Managers to document and validate specific PoR insertion requirement and timelines.
      8. The contractor shall deliver a detailed cost estimate and technical schedule required to advance the Pilot Project to physical fabrication and initial testing, including a detailed description of dependencies and timelines.

  1.  INSTRUCTIONS TO OFFERORS

1.0  General Instructions:

This BAA Call is intended to be as streamlined as possible to allow for the exploration of modern microelectronics solutions to support a variety of critical national security systems using the USG and Intel’s Secure Enclave capability. This Call will consist of two steps: 1. A White Paper phase and 2. A Full Proposal phase.  Under this two-step approach, submission and governmental evaluation of White Papers is required before invited offerors can submit a Full Proposal. The White Paper will be utilized to screen the Offeror’s proposed approach (in advance of a Full Proposal invitation), which helps to streamline the down-select process and strike a fair balance between an Offeror’s bid and proposal resources and the Government’s evaluation requirements. Offerors submitting White Papers may be invited to submit a full technical and cost proposal of their White Paper submission. This invitation may encompass the Offeror’s entire White Paper submission or be limited to a specific portion, component or phase of the proposed effort. Any such invitation does not constitute a commitment, promise, or obligation on the part of the Government to award a contract or Other Transaction agreement. An offeror that does NOT submit a timely and compliant White Paper is NOT eligible (and thus cannot be invited) to submit a Full Proposal for consideration for an award.

There is not a classified version of this Call. All responses to this Call must be UNCLASSIFIED unless a vendor explicitly notifies and receives positive confirmation from the USG stating the Offeror may submit a classified annex. The contractor is solely responsible for the secure delivery of any classified material to the USG. The USG will evaluate all Step 1 White Papers in accordance with the evaluation criteria listed in Section IV EVALUATION CRITERIA. The existence (or lack thereof) of a classified annex will not be considered during the evaluation.

Questions may be submitted to SAF/AQC via SE_PI@us.af.mil  for consideration NLT 15 July 2026 at 5:00pm ET.  Please include “Questions for BAA Call 1” in the subject line.  The USG will not individually respond to questions from potential Offerors. Instead, the USG, at its sole discretion, will take all questions into consideration and may post a publicly available attachment to this Call if the USG determines questions and associated USG answers are beneficial to the entire competitive pool. Offerors who pose questions will not be identified in the attachment, but the content of their question will be listed for all to see.

STEP 1 INSTRUCTIONS: Below is the required structure and required content for White Paper submission for this Call. Offerors shall adhere to the specific guidelines for preparation and submission of White Papers. White Papers shall be single sided, single-space, and Times New Roman 12-size font with 1-inch margins. Offeror responses shall be submitted to SE_PI@us.af.mil NLT 5:00pm ET on 23 July 2026 via email in either PDF, Word, or Excel file types and shall include the following:

Part 1 - Cover Letter, which must include the following information:

The Offeror’s Cover Letter shall not exceed three (3) pages in length.

Part 2 – Technical White Paper, which must, at a minimum, include the following information:

The Offeror’s Technical White Paper shall not exceed seven (7) pages in length.  

Part 3 – Offeror’s Initial Data Rights Disclosure

Offerors shall provide a high-level narrative summary of their desired IP and data rights, identifying major commercial IP dependencies and acknowledging the Government's target rights. To facilitate evaluation, Offerors are instructed to align their IP, software, and data deliverables with the following expected categories and desired rights:

1) Existing Technology (Privately Funded)

Attachments

Contacts

Email and phone are in the source notice.

Source notice

More from United States Department of the Air Force posted in July 2026

More lists