Air Compressors and Maintenance Plan
- Status
- Closed, the response deadline passed on Aug 4, 2026
- Agency
- United States Department of the Air Force
- Office
- KIRTLAND AFB, USA
- Notice type
- Combined Synopsis/Solicitation
- Solicitation number
- FA9401-26-Q-0025
- NAICS
- 333912 - Air and Gas Compressor Manufacturing
- PSC
- 4310 - COMPRESSORS AND VACUUM PUMPS
- Category
- Machinery & Components (5.1)
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Posted
- 2026-07-22
- Deadline
- 2026-08-04
- Place of performance
- ROAD FORKS, New Mexico 87117, UNITED STATES
Description
*See PWS for complete details*
This project will consist of the procurement, removal, disposal, installation, commissioning, and maintenance of two (2) Ingersoll Rand RS37i Air Compressors, one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator, and two (2) Ingersoll Rand Xe-70M controllers. Equivalent models are accepted; however, bids on equivalent models will need to include a brochure of all the technical specifications for review. Equivalent models will need to either have an integrated desiccant dryer or separate desiccant dryer that can handle the volume of two air compressors. The Contractor will be responsible for the complete installation of two (2) Ingersoll Rand RS37i Air Compressors and one (1) Ingersoll Rand Polysep PSG-30 Oil Water Separator.
The Contractor shall procure and provide a “turnkey” solution in accordance with the manufacturer’s installation requirements and standard commercial best practices for the following equipment:
Manufacture Model # Description Quantity
Ingersoll Rand RS30-37i/RS30I TAS Fixed Speed Rotary Compressor w/ Dryer 2
Ingersoll Rand PSG-30 Polysep PSG-30 Oil Water Separator 1
Equivalent models must meet the following specifications:
Description Required Specifications Quantity
Air Compressor 2
• 120 PSI each
• 170 CPM each
• Needs to have integrated air dryer
• Must be air-cooled
Oil Water Separator 1
• 390 CPM
• 12-gal absorption module volume
• 32-120 temperature operating range
In addition, the government requires a preventive (scheduled) and corrective (troubleshooting, repairs, and replacements) maintenance contract for all existing shop air compressor systems (See Appendixes in PWS for all currently used equipment), for the base year and four option years. The Contractor shall provide all management, labor, material, parts, equipment, transportation, certifications, and tools necessary to maintain, service, and calibrate the shop air compressors, air dryers and associated ancillary equipment.
Attachments
Contacts
- Karen Camacho
- Anna Hartkopp
Email and phone are in the source notice.
More from United States Department of the Air Force posted in July 2026